Copy · U.S. DOT/FAA - SB-767-21-0245-01 · 41 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0797, the docket of AD 2017-01-09. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'b4eba7477b5cab42a5d7a6b664b4e45533b868963da7e654e1d295d83fc6c1a2'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 767 Service Bulletin Number: 767-21-0245 Original Issue: April 16, 2010 Revision 1: September 30, 2010 ATA System: 2158 SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2010 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.

This document includes proprietary information owned by The Boeing Company and/or one or more third parties.

Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 1 of 41

2.0

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 2 of 41 BOEING SERVICE BULLETIN 767-21-0245

BLANK PAGE

Table of Contents

Revision Transmittal Sheet5

Summary7

1. PLANNING INFORMATION9

A. Effectivity9

1. Airplanes9

2. Spares Affected ........................................ 1 0 B. Concurrent Requirements ...................................... 1 0 C. Reason ................................................ 1 0 D. Description .............................................. 1 0 E. Compliance .............................................. 1 1 F. Approval ............................................... 1 1 G. Manpower .............................................. 1 1 H. Weight and Balance Changes .................................... 1 2 I. Electrical Load Data ......................................... 1 2 J. References .............................................. 1 2

1. Existing Data .......................................... 1 2

2. Data supplied with this Service Bulletin ............................ 1 2

3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 1 2 K. Publications Affected ........................................ 1 3 L. Interchangeability and Intermixability of Parts ........................... 1 3

2. MATERIAL INFORMATION ........................................ 1 5 A. Material - Price and Availability ................................... 1 5 B. Industry Support Information .................................... 1 5 C. Parts Necessary For Each Airplane ................................. 1 5

1. Kits/Parts ............................................ 1 5

2. Parts and Materials Supplied by the Operator ........................ 1 8

3. Parts Modified and Reidentified ................................ 1 8

4. Parts Removed and Not Replaced .............................. 1 9 D. Parts Necessary to Change Spares ................................. 1 9 E. Special Tooling - Price and Availability ............................... 1 9 F. Special Tooling Necessary to do this Service Bulletin ....................... 1 9

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 1 A. GENERAL INFORMATION ..................................... 2 1 B. WORK INSTRUCTIONS ....................................... 2 1 FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL RELAY CHANGE . . 28 FIGURE 2: MAIN EQUIPMENT CENTER - E8 EICAS DIODE INSTALLATION ............. 3 0 FIGURE 3: WIRE BUNDLE W0176 CHANGE ............................... 3 2 FIGURE 4: WIRE BUNDLE W596 AND W1702 CHANGE ........................ 3 4 FIGURE 5: WIRE BUNDLE W2000 AND W2006 CHANGE ....................... 3 5 FIGURE 6: WIRE BUNDLES W0176 AND W01702 ROUTING ..................... 3 7 FIGURE 7: WIRE BUNDLES W2000 AND W2006 ROUTING ...................... 4 0

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 3 of 41 BOEING SERVICE BULLETIN 767-21-0245

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 4 of 41 BOEING SERVICE BULLETIN 767-21-0245

BLANK PAGE

Commercial Airplanes 767 Service Bulletin Revision Transmittal SheetNumber: 767-21-0245Original Issue: April 16, 2010 Revision 1: September 30, 2010 ATA System: 2158 SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION No more work is necessary on airplanes changed in accordance with the original issue of this service bulletin.

REASON FOR REVISION This revision is issued to make required changes found when doing this service bulletin for the first time. Three wire contacts are added; two wire contacts are deleted; and two plug and terminal numbers are changed. Kits and instructions are changed accordingly. Some functional test steps are also changed.

Also, airplanes VR257-VR260, which were inadvertantly omitted, are added to Group 1.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.

Pages with no vertical lines have no important changes.

REVISION HISTORY April 16, 2010Original Issue:

September 30, 2010Revision 1:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 5 of 41

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 6 of 41 BOEING SERVICE BULLETIN 767-21-0245

BLANK PAGE

Commercial Airplanes 767 Service Bulletin SummaryNumber: 767-21-0245Original Issue: April 16, 2010 Revision 1: September 30, 2010 ATA System: 2158 SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND This service bulletin and kit of parts change the Environmental Control System (ECS) Flight Deck Cooling System Logic to use Electrical Equipment (EE) Cooling rather than Airplane Pack Cooling on the ground and up to 10,000 feet. This prevents flight deck display unit blanking in hot and humid environments. If the change is not done moisture or condensation could get in the flight deck display units. This could cause intermittent indications in the flight deck display.

Operators have reported display unit blanking on 767-300F type airplanes. The reports have included single display units and multiple units blanking during operation in hot and humid environments.

This service bulletin will change the opening of the 3-way valve (manifold interconnect valve) with a five minute time delay after climbing past 10,000 feet altitude. The valve will close when descending below 10,000 feet altitude. This change will reduce moisture or condensation in the flight deck display unit.

Boeing Service Related Problem (SRP) 767-SRP-21-179 is related to this service bulletin.

ACTION (PRR B12900-260) In the Main Equipment Center, do the following change:

1. Change wire bundles W596 and W1702.

2. In the P36 Panel change relays, decals and wire bundle W176.

3. In the E8 EICAS rack, install two diodes and change wire bundles W2000 and W2006.

EFFECTIVITY 767-300F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.

COMPLIANCE No compliance time is given.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 7 of 41

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of July 29, 2009. Please refer to Paragraph

2.B., Industry Support Information.

MANPOWER Elapsed HoursTotal Task HoursAirplanes

10.6013.25All

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 8 of 41 BOEING SERVICE BULLETIN 767-21-0245

Commercial Airplanes 767 Service Bulletin Number: 767-21-0245 Original Issue: April 16, 2010 Revision 1: September 30, 2010 ATA System: 2158 SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change

1. PLANNING INFORMATION A. Effectivity

1. Airplanes Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRR B12900-260 for data about this change.

DESCRIPTIONCONFIGURATIONGROUP 767-300F airplanes that must incorporate 767-21-0235 prior to or concurrently with this bulletin.

-1 767-300F airplanes that had the intent of 767-21-0235 incorporated in production -2 Airplane Models:

767-300F GroupVariable Number 1VR251 1VR256 - VR260 1VT501 1VT511 - VT513 1VT521 - VT523 1VT531 - VT533 2VT541 - VT543 1VW851

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 9 of 41

2. Spares Affected None.

B. Concurrent Requirements Group 1:

The service bulletin listed below must be done on Group 1 airplanes before or at the same time as this service bulletin:

Group 1:

DescriptionService BulletinCompany 3-Way Valve Control Logic Change767-21-0235, Original IssueBoeing Group 2:

None C. Reason This service bulletin and kit of parts change the Environmental Control System (ECS) Flight Deck Cooling System Logic to use Electrical Equipment (EE) Cooling rather than Airplane Pack Cooling on the ground and up to 10,000 feet. This prevents flight deck display unit blanking in hot and humid environments. If the change is not done moisture or condensation could get in the flight deck display units. This could cause intermittent indications in the flight deck display.

Operators have reported display unit blanking on 767-300F type airplanes. The reports have included single display units and multiple units blanking during operation in hot and humid environments.

This service bulletin will change the opening of the 3-way valve (manifold interconnect valve) with a five minute time delay after climbing past 10,000 feet altitude. The valve will close when descending below 10,000 feet altitude. This change will reduce moisture or condensation in the flight deck display unit.

Boeing Service Related Problem (SRP) 767-SRP-21-179 is related to this service bulletin.

Revision 1 is issued to make required changes found when doing this service bulletin for the first time.

Three wire contacts are added; two wire contacts are deleted; and two plug and terminal numbers are changed. Kits and instructions are changed accordingly. Some functional test steps are also changed.

Also, airplanes VR257-VR260, which were inadvertantly omitted, are added to Group 1.

D. Description In the Main Equipment Center, do the following change:

1. Change wire bundles W596 and W1702.

2. In the P36 Panel change relays, decals and wire bundle W176.

3. In the E8 EICAS rack, install two diodes and change wire bundles W2000 and W2006.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 10 of 41 BOEING SERVICE BULLETIN 767-21-0245

Revision 1 - Airplanes modified in accordance with the original release of this service bulletin do not require additional work.

The work in this service bulletin is done in the maintenance zone(s) given below.

Affected Maintenance Zones ZoneModel 119767-300F E. Compliance No compliance time is given.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

G. Manpower The table below shows an estimate of the task hours necessary to do this change for each airplane.

This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

 Time to adjust to the workplace  Time to schedule the work  Time to inspect the work  Time to cure the materials  Time to make the parts  Time to find the tools.

Elapsed HoursTask HoursNumber of PersonsTask

0.500.501Figure 1

0.350.351Figure 2

3.503.501Figure 3

2.102.101Figure 4

2.655.302Figure 5 OnlyRouteShowsFigure 6 OnlyRouteShowsFigure 7

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 11 of 41 BOEING SERVICE BULLETIN 767-21-0245

Elapsed HoursTask HoursNumber of PersonsTask

1.501.501Test

10.6013.25TOTAL FOR EACH AIRPLANE This estimate does not include the task hour data given in the service bulletin in Paragraph 1.B., Concurrent Requirements.

H. Weight and Balance Changes None.

I. Electrical Load Data Not changed.

J. References

1. Existing Data

a. Engineering Change Memo PRR B12900-260

b. Boeing Service Bulletin 767-21-0235

c. Boeing Service Related Problem (SRP) 767-SRP-21-179

d. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19, 20-20-11, 20-30-16, 20-61-11, 20-71-11, 20-81-12, 20-90-11

e. 767 Aircraft Maintenance Manual (AMM) 32-09-02

f. 767 Wiring Diagram Manual (WDM) 21-58-16, 31-41-13

2. Data supplied with this Service Bulletin None.

3. Installation Drawings Used in the Preparation of this Service Bulletin TitleDrawing Number MODULAR WIRE BUNDLE INSTALLATION P36, MISCELLA-

NEOUS RELAY PANEL, LEFT 288T2036 MODULAR WIRE BUNDLE INSTALLATION - E8 EICAS RACK288T2280 These drawings were used to prepare this service bulletin. These drawings are not necessary to make the specified changes, and are not supplied with this service bulletin. These drawings may not be applicable to all airplane configurations or operators.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: April 16, 2010 767-21-0245Revision 1: September 30, 2010 12 of 41 BOEING SERVICE BULLETIN 767-21-0245

Pages 13–24 of 41