Copy · U.S. DOT/FAA - Service Bulletin (767-57-0068-01) · 27 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2010-0957; AD 2011-12-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '59588ec39f6f460b6aa054c18eb3f52026daac61e593e6845b45ae4bbf94fb61'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplane Group 767 Service Bulletin Number: 767-57-0068 Revision Transmittal SheetDate: September 16, 1999 Revision 1: May 9, 2002 ATA System: 5740 2781 2811 SUBJECT: WINGS - Leading Edge and Leading Edge Devices - Slat Track Housing Electrostatic Bond Rework This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Airworthiness Directive 2001-14-19, Amendment 39-12330, is related to this service bulletin.

More work is necessary on the airplanes reworked as shown in the initial release of this service bulletin.

Boeing recommends the PART 2 - Additional Work be completed within 48 months from the release date of Revision 1 of this service bulletin. The original bonding jumper "A" installation sequence as noted by the red and blue bands was reversed. The reversed installation could cause dissimilar metal contact between the bonding jumpers and result in galvanic corrosion.

REASON FOR REVISION This revision is sent to:

Add information that Federal Aviation Administration (FAA) Airworthiness Directive AD 2001-14-19, Amendment 39-12330 is related to this service bulletin.

Clarify the BMS 5-45 sealant call out in the operator supplied material section.

Clarify the bonding jumper installation sequence given in Figure 1 note "a".

Add Part 2 - Additional Work requirements to correct the bonding jumper "A" installations originally installed as shown in the initial release of this service bulletin.

Add the data given in Information Notice 767-57-0068 IN 01.

Paragraph 1.A., Effectivity, shows changes of airplane operators. Each operator should examine the Effectivity paragraph for changes.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.

Pages with no vertical lines have no important changes.

REVISION HISTORY Original Release: September 16, 1999 Revision 1: May 9, 2002 767-57-0068 Revision Transmittal Page 1 of 1

No text on this page: it may be a figure. Open the PDF to see it.

Commercial Airplane Group 767 Service Bulletin Number: 767-57-0068 SummaryDate: September 16, 1999 Revision 1: May 9, 2002 ATA System: 5740 2781 2811 SUBJECT: WINGS - Leading Edge and Leading Edge Devices - Slat Track Housing Electrostatic Bond Rework

CONCURRENT REQUIREMENTS None

BACKGROUND Accomplishment of this service bulletin will provide an improved electrostatic bond path for the number 5 and 8 inboard slat track housing drain tube assemblies.

A production change (PRRB12900-133) was incorporated at Boeing to install a new slat track housing drain tube assembly for the number 5 and 8 inboard slat track. The purpose of this change was to prevent possible fuel leaks at these locations.

After production incorporation of the new drain tube assemblies, Boeing determined that the installation did not meet current required bonding specifications.

Incorporation of this service bulletin will ensure proper bonding of the number 5 and 8 inboard slat track drain tube assemblies.

ACTION (PRRB13024) Part 1 - Rework Open the main tank and dry bay access panels.

Remove the bonding jumper assembly from the number 5 and 8 inboard slat track housing drain tube installations. Remove and replace the fasteners common to drain tube doubler assembly.

Install bonding jumper brackets to the rib stiffeners.

Install bonding jumpers between the drain tube assemblies and the brackets installed on the rib stiffeners. Close the main tank and dry bay access panels.

Part 2 - Additional Work Open the main tank access panels. Rework the bonding jumper assembly for the number 5 and 8 inboard slat track housing drain tube installations.

Close the main tank access panels.

EFFECTIVITY All 767 airplanes line numbers 672 through 757.

COMPLIANCE Boeing recommends the Part 1 - Rework be completed within 5000 flight-cycles or 22 months, whichever is earlier from the initial release date of this service bulletin. Boeing recommends the PART 2 - Additional Work be completed within 48 months from the release date of Revision 1 of this service bulletin.

Federal Aviation Administration (FAA) Airworthiness Directive 2001-14-19, Amendment 39-12330, is related to this service bulletin.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of September 29, 1998.

Please refer to Paragraph 2.B., Industry Support Information.

MANPOWER Total Elapsed Time Per Airplane Man-Hours (Hours) 25 7.5

MATERIAL INFORMATION Boeing Supplied Kits/Parts Refer to Paragraph 2.A., Material - Price and Availability.

767-57-0068 Summary Page 1 of 2

BOEING SERVICE BULLETIN 767-57-0068 RIB NO. 9

WING LOWER SKIN

HOUSING

SLAT TRACK

FRONT SPAR A ASEE

DOUBLER ASSEMBLY

TO THE DRAIN TUBE

THE FASTENERS COMMON

REMOVE AND REPLACE

REMOVE AND REPLACE EXISTING

BONDING JUMPER AND CLAMPS

INSTALL NEW BONDING

JUMPER AND BRACKET

FWD INBD UP S96564 September 16, 1999 767-57-0068 Revision 1: May 9, 2002 Summary Page 2 of 2

Commercial Airplane Group 767 Service Bulletin Number: 767-57-0068 Date: September 16, 1999 Revision 1: May 9, 2002 ATA System: 5740 2781 2811 SUBJECT: WINGS - Leading Edge and Leading Edge Devices - Slat Track Housing Electrostatic Bond Rework

1. PLANNING INFORMATION A. Effectivity

1. Airplanes Refer to Service Bulletin Index Document D624T001, Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRRB13024 for data about this change.

Airplane Models:

767-300 767-300F

IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER

AEROMEXICO (AMX) VS211

AIR DO (HIA) VS176-VS177

AIR MADAGASCAR (MAD) VS316

AIR NEW ZEALAND (ANZ) VN658 VS111 AIR 2000 (ATZ) VS216

ALITALIA (ALI) VS366-VS367 VS401

ALL NIPPON AIRWAYS (ANA) VR401

AMERICAN AIRLINES (AAL) VS196-VS203

ASIANA AIRLINES (AAR) VR426 September 16, 1999 767-57-0068 Revision 1: May 9, 2002 Page 1 of 22

BOEING SERVICE BULLETIN 767-57-0068

BOEING (TBC) VY999

BRITANNIA AIRWAYS (BRI) VS051-VS054

BRITISH AIRWAYS (BAB) VS246-VS248

DELTA AIR LINES (DAL) VN274-VN276 VR471-VR472 VS066-VS070 VS073-VS078 VS266-VS272

ETHIOPIAN AIRLINES (ETH) VS306

JAPAN AIRLINES (JAL) VK016 VK186 VR461

KLM - ROYAL DUTCH AIRLINES (KLM) VS136

LANCHILE AIRLINES (LAN) VN970 VR251 VS131-VS133

LAUDA AIR (LAL) VS301

LTU (LTU) VS061

QANTAS (QAN) VS186-VS187

SHANGHAI AIRLINES (SHA) VR421

SKYMARK AIRLINES (SKM) VS261-VS262

TWA (TWA) VS206-VS207

UNITED AIRLINES (UAL) VS091-VS096

UPS (UPS) VR201-VR207 VW719-VW721

IDENTIFICATION BY VARIABLE NUMBER VK016 VK186 VN274-VN276 VN658 VN970 VR201-VR207 VR251 VR401 VR421 VR426 VR461 VR471-VR472 VS051-VS054 VS061 VS066-VS070 VS073-VS078 VS091-VS096 VS111 VS131-VS133 VS136 VS176-VS177 VS186-VS187 VS196-VS203 VS206-VS207 VS211 VS216 VS246-VS248 VS261-VS262 VS266-VS272 VS301 VS306 VS316 VS366-VS367 VS401 VW719-VW721 VY999 September 16, 1999 767-57-0068 Revision 1: May 9, 2002 2

BOEING SERVICE BULLETIN 767-57-0068

2. Spares Affected None September 16, 1999 767-57-0068 Revision 1: May 9, 2002 3

BOEING SERVICE BULLETIN 767-57-0068 B. Concurrent Requirements None C. Reason Accomplishment of this service bulletin will provide an improved electrostatic bond path for the number 5 and 8 inboard slat track housing drain tube assemblies.

A production change (PRRB12900-133) was incorporated at Boeing to install a new slat track housing drain tube assembly for the number 5 and 8 inboard slat track. The purpose of this change was to prevent possible fuel leaks at these locations. After production incorporation of the new drain tube assemblies, Boeing determined that the installation did not meet current required bonding specifications.

Incorporation of this service bulletin will ensure proper bonding of the number 5 and 8 inboard slat track drain tube assemblies.

Revision 1 is issued to:

Add information that Federal Aviation Administration (FAA) Airworthiness Directive AD 2001-14-19, Amendment 39-12330 is related to this service bulletin.

Clarify the BMS 5-45 sealant call out in the operator supplied material section.

Clarify the bonding jumper installation sequence given in Figure 1 note "a".

Add Part 2 - Additional Work requirements to correct the bonding jumper "A" installations originally installed as shown in the initial release of this service bulletin.

Add the data given in Information Notice 767-57-0068 IN 01.

D. Description Part 1 - Rework Open the main tank and dry bay access panels. Remove the bonding jumper assembly from the number 5 and 8 inboard slat track housing drain tube installations. Remove and replace the fasteners common to drain tube doubler assembly. Install bonding jumper brackets to the rib stiffeners. Install bonding jumpers between the drain tube assemblies and the brackets installed on the rib stiffeners. Close the main tank and dry bay access panels.

Part 2 - Additional Work Open the main tank access panels. Rework the bonding jumper assembly for the number 5 and 8 inboard slat track housing drain tube installations. Close the main tank access panels.

More work is necessary on the airplanes reworked as shown in the initial release of this service bulletin. The original bonding jumper "A" installation sequence as noted by the red and blue bands was reversed. The reversed installation could cause dissimilar metal contact between the bonding jumpers and result in galvanic corrosion.

An evaluation form is attached to this service bulletin. Please use this form to tell us what you think of the quality of this service bulletin.

September 16, 1999 767-57-0068 Revision 1: May 9, 2002 4

BOEING SERVICE BULLETIN 767-57-0068 E. Compliance Boeing recommends the Part 1 - Rework be completed within 5000 flight-cycles or 22 months, whichever is earlier from the initial release date of this service bulletin. Boeing recommends the PART 2 - Additional Work be completed within 48 months from the release date of Revision 1 of this service bulletin.

Federal Aviation Administration (FAA) Airworthiness Directive 2001-14-19, Amendment 39-12330, is related to this service bulletin.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable Federal Aviation Regulations (FAR) and are FAA approved. This service bulletin and the FAA approval were based on the airplane in its original Boeing delivery configuration or as modified by other FAA approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the modification defined in this service bulletin as an alternative method of compliance to the requirements of paragraph (c) of AD 2001-14-19. All provisions of AD 2001-14-19 that are not specifically referenced in the above sentence remain fully applicable and must be complied with.

G. Manpower The tables below show an estimate of the man-hours necessary to do the changes for each airplane.

This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator man-hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

- Time to adjust to the workplace

- Time to schedule the work

- Time to examine the work

- Time to cure the materials

- Time to make the parts

- Time to find the tools.

Part 1 - Rework Task Number of Persons Man-Hours Elapsed Time (Hours) Open Main Tank and Dry Bay Access Panels 4 13 3.25 Remove and Install Bonding Assembly 2 2 1 Close Main Tank Access Panels / Refuel 4 7 1.75 Perform Leak Check 2 2 1 Close Dry Bay Access Panels 2 1 .5 TOTAL FOR EACH AIRPLANE 25 7.5 September 16, 1999 767-57-0068 Revision 1: May 9, 2002 5

BOEING SERVICE BULLETIN 767-57-0068 Part 2 - Additional Work Task Number of Persons Man-Hours Elapsed Time (Hours) Open Main Tank Access Panels 4 8 2 Rework Bonding Jumper Assembly 2 2 1 Close Main Tank Access Panels 4 4 1 TOTAL FOR EACH AIRPLANE 14 4 H. Weight and Balance Changes Change in Weight Change in Moment Airplane (Pounds) (Pound-Inches) + 0.4 lbs + 364.0 lb-in I. Electrical Load Data Not changed September 16, 1999 767-57-0068 Revision 1: May 9, 2002 6

BOEING SERVICE BULLETIN 767-57-0068 J. References

1. Existing Data:

a. Engineering Change Memo PRRB13024, PRRB12900-133

b. 767 Maintenance Manual (AMM) Subject 12-11-01, 28-11-00 and 28-26-00

c. Boeing Standard Wiring Practices Manual (BSWPM) 20-20-00

d. Boeing Standard Overhaul Practices Manual (BSOPM) 20-11-03, 20-41-02, 20-43-03, and 20-50-19

e. FAA Airworthiness Directive 2001-14-19, Amendment 39-12330

2. Data supplied with this service bulletin:

None

3. Installation Drawings Used in the Preparation of This Service Bulletin:

Drawing Number Title 112T2019 Drain Tube Installation 112T5090 Rib Installation These drawings were used to prepare this service bulletin. These drawings are not necessary to make the specified changes, and are not supplied with this service bulletin. These drawings may not be applicable to all airplane configurations or operators.

K. Publications Changed Publication Chapter-Section 767 Illustrated Parts Catalog 57-40 767 Maintenance Manual 12-21, 28-11 L. Interchangeability and Intermixability of Parts None September 16, 1999 767-57-0068 Revision 1: May 9, 2002 7

BOEING SERVICE BULLETIN 767-57-0068

BLANK PAGE September 16, 1999 767-57-0068 Revision 1: May 9, 2002 8

Pages 13–24 of 27