Copy · U.S. DOT/FAA - Service Information - 2 · 74 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0567; AD 2012-21-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '178e65dff145195771f9b703af7ba718451d06a32760fa40c0a5f24623b36a7d'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Show pages 49–60
Page 61OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121

FWD FWD

J-J K-K

• OUTBOARD FORWARD PITCH

LOAD FITTING

3.3

5.8

5.2 / 6.2

5.6 FWD 1997950 FIGURE 10: RIGHT WING LEADING EDGE SEALING (SHEET 3 OF 4) Original Issue: October 07, 2010 Revision 1 July 27, 2011 BOEING PROPRIETARY - 767-57-0121 Copyright © Unpublished Work - See page 1 for details. 61 of 74

More DataQtyIdentificationNameTaskStep Fill corner gaps as shown.

-BMS5-16 (BMS5-45 CLASS B or BMS5-95 CLASS B or BMS5-142 CLASS B optional) Hole Filling CompoundApply1 to base of outboard forward pitch load fitting as shown. (a) -BMS5-125 TYPE IIILeveling CompoundApply2 with BMS5-16 (BMS5-45 CLASS B or BMS5-95 CLASS B or BMS5-142 CLASS B optional) hole filling compound.

--HoleFill3 Brush sealant over the surface as shown. Minimum thickness is 0.003 inch. Brush coat sealant over the top surfaces and edges of the leading edge rib chords and forward edge of the leading edge splice plate.

-BMS5-45SealantApply4 if blocked. Make sure drain path is not blocked.

--Drain PathClean5 if blocked. Make sure drain path is not blocked. Primary drain path minimum diameter is 0.375 inch or equivalent area.

--Primary Drain PathClean6

(a) Clean area before applying leveling compound. Refer to SOPM 20-50-19 as an accepted procedure.

Airplane must be either in level or airplane taxi attitude while pouring leveling compound. Pour leveling compound into lower pocket formed by the structure.

FIGURE 10: RIGHT WING LEADING EDGE SEALING (SHEET 4 OF 4)

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 07, 2010 767-57-0121Revision 1 July 27, 2011 62 of 74 BOEING SERVICE BULLETIN 767-57-0121

Page 63OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121 WBL

97.95 STA 558 STA 798 STA 1106.6 WSTA 404 WSTA 1106 AND H -WD _ A 2066364 FIGURE 11: LEFT WING RIB SEALING AT OSS 464.475 (SHEET 1 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 BOEING PROPRIETARY - 767-57-0121 Copyright © Unpublished Work - See page 1 for details. 63 of 74

Page 64OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121 C FWD A-A 1997843 FIGURE 11: LEFT WING RIB SEALING AT OSS 464.475 (SHEET 2 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 1210-29-292

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 64 of 74

Page 65OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121

4.00 APPROX.

INBD

• B-B 1997875 FIGURE 11: LEFT WING RIB SEALING AT OSS 464.475 (SHEET 3 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 BOEING PROPRIETARY - 767-57-0121 Copyright © Unpublished Work - See page 1 for details. 65 of 74

Page 66OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121 FWD

4.25

3.75 1997886 FIGURE 11: LEFT WING RIB SEALING AT OSS 464.475 (SHEET 4 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 767-57-0121

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 66 of 74

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP Seal corner gaps as shown.

-BMS5-16 (BMS5-142 CLASS B or BMS5-45 CLASS B or BMS5-95 CLASS B optional) Hole Filling CompoundApply1 Fill drain path as shown. Make sure that sealed passages have no voids or disbonds that will allow fluid leakage to occur.

-BMS5-16 (BMS5-142 CLASS B or BMS5-45 CLASS B or BMS5-95 CLASS B optional) Hole Filling CompoundApply2 as shown.-BMS5-125 TYPE IIILeveling CompoundApply3 flush with structure as shown. Make sure that sealed passages have no voids or disbonds that will allow fluid leakage to occur.

-BMS5-45SealantApply4 Inject gap full of sealant using fuel injection seal.

-BMS5-45SealantInject5 Apply fillet seal as shown. Refer to SOPM 20-50-19 as an accepted procedure.

-BMS5-45SealantApply6 Apply Intermediate Seal to outboard side of the rib as shown. Refer to SOPM 20-50-19 as an accepted procedure.

-BMS5-45SealantApply7 Apply Absolute Seal to outboard side of the rib as shown.

Refer to SOPM 20- 50-19 as an accepted procedure.

-BMS5-142 (BMS5-45 optional) SealantApply8 FIGURE 11: LEFT WING RIB SEALING AT OSS 464.475 (SHEET 5 OF 6)

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 07, 2010 767-57-0121Revision 1 July 27, 2011 67 of 74 BOEING SERVICE BULLETIN 767-57-0121

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP Apply parting agent on the 521EB Panel to the area shown.

Refer to SOPM 20- 50-19 as an accepted procedure.

--Parting AgentApply9 Fuel fay seal the lower exterior surface of the rib chords and splice plate as shown. Refer to SOPM 20-50- 19 as an accepted procedure.

-BMS5-45SealantApply10 Refer to 767 AMM 06-44-00 or 767-400 AMM 06-44-00 as an accepted procedure, as applicable.

It is an acceptable option to install a 654T0513-1301 skin panel in this location.

1521EBSkin PanelInstall (Kept)11 FIGURE 11: LEFT WING RIB SEALING AT OSS 464.475 (SHEET 6 OF 6)

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 07, 2010 767-57-0121Revision 1 July 27, 2011 68 of 74 BOEING SERVICE BULLETIN 767-57-0121

Page 69OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121 WBL

97.95 STA 798 STA 1106.6 WSTA 404 WSTA 1106

E AND H 1998310 FIGURE 12: RIGHT WING RIB SEALING AT OSS 464.475 (SHEET 1 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 BOEING PROPRIETARY - 767-57-0121 Copyright © Unpublished Work - See page 1 for details. 69 of 74

Page 70OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121 C FWD A-A FIGURE 12: RIGHT WING RIB SEALING AT OSS 464.475 (SHEET 2 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 767-57-0121

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 70 of 74

Page 71OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121

4.00 APPROX INBD B-B 1998312 FIGURE 12: RIGHT WING RIB SEALING AT OSS 464.475 (SHEET 3 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 BOEING PROPRIETARY - 767-57-0121 Copyright © Unpublished Work - See page 1 for details. 71 of 74

Page 72OCROpen in PDF

BOEING SERVICE BULLETIN 767-57-0121 FWD 1998313 FIGURE 12: RIGHT WING RIB SEALING AT OSS 464.475 (SHEET 4 OF 6) Original Issue: October 07, 2010 Revision 1 July 27, 2011 1Z10-29-292

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 72 of 74

Pages 73–74 of 74