TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd706772820be283107d9559e6bbe4be4997625ea334c27fdc71afaafa54e1e5f' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd706772820be283107d9559e6bbe4be4997625ea334c27fdc71afaafa54e1e5f' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 767 Service Bulletin Number: 767-78-0096 Original Issue: August 07, 2008 Revision 1: December 10, 2009 ATA System: 7834 SUBJECT: EXHAUST - Thrust Reverser Control System - Rolls Royce Powered Thrust Reverser Logic, Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2008 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 1 of 64
3.0
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 2 of 64 BOEING SERVICE BULLETIN 767-78-0096
BLANK PAGE
Table of Contents
Revision Transmittal Sheet5
Summary9
1. PLANNING INFORMATION ........................................ 1 3 A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 1 4 B. Concurrent Requirements ...................................... 1 4 C. Reason ................................................ 1 4 D. Description .............................................. 1 7 E. Compliance .............................................. 1 7 F. Approval ............................................... 1 7 G. Manpower .............................................. 1 8 H. Weight and Balance Changes .................................... 2 0 I. Electrical Load Data ......................................... 2 0 J. References .............................................. 2 0
1. Existing Data: ......................................... 2 0
2. Data supplied with this Service Bulletin: ........................... 2 0
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 1 K. Publications Affected ........................................ 2 1 L. Interchangeability and Intermixability of Parts ........................... 2 1
2. MATERIAL INFORMATION ........................................ 2 3 A. Material - Price and Availability ................................... 2 3 B. Industry Support Information .................................... 2 3 C. Parts Necessary For Each Airplane ................................. 2 3
1. Kits/Parts: ........................................... 2 3
2. Parts and Materials Supplied by the Operator: ........................ 2 4
3. Parts Modified and Reidentified: ............................... 2 5
4. Parts Removed and Not Replaced: .............................. 2 5 D. Parts Necessary to Change Spares ................................. 2 5 E. Special Tooling - Price and Availability ............................... 2 5 F. Special Tooling Necessary to do this Service Bulletin ....................... 2 5
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 7 A. GENERAL INFORMATION ..................................... 2 7 B. WORK INSTRUCTIONS ....................................... 2 8 FIGURE 1: P36 PANEL-THRUST REVERSER CONTROL, ENGINE 1, RELAY INSTALLATION [Group 1, 3 ] ................................................ 3 5 FIGURE 2: P36 PANEL-THRUST REVERSER CONTROL, ENGINE 1, WIRE CHANGE [Group 1] . . 38 FIGURE 3: P36 PANEL-THRUST REVERSER CONTROL, ENGINE 1, WIRE CHANGE [Group 3] . . 41 FIGURE 4: P36 PANEL-THRUST REVERSER CONTROL, ENGINE 1, RELAY INSTALLATION [Group 2, 4 ] ................................................ 4 4 FIGURE 5: P36 PANEL-THRUST REVERSER CONTROL, ENGINE 1, WIRE CHANGE [Group 2, 4] . 47 FIGURE 6: P36 PANEL, RETURN ACCESS [Group 1-4] ......................... 5 0 FIGURE 7: P37 PANEL-THRUST REVERSER CONTROL, ENGINE 2, RELAY INSTALLATION [Group 1-4] .................................................. 5 2 FIGURE 8: P37 PANEL-THRUST REVERSER CONTROL, ENGINE 2, WIRE CHANGE [Group 2, 4] . 55
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 3 of 64 BOEING SERVICE BULLETIN 767-78-0096
FIGURE 9: P37 PANEL-THRUST REVERSER CONTROL, ENGINE 2, WIRE CHANGE [Group 1, 3] . 58 FIGURE 10: P37, RETURN ACCESS [Group 1-4] ............................. 6 1 FIGURE 11: P33 PANEL-THRUST REVERSER CONTROL, WIRE REMOVAL [Group 1-4] ...... 6 3 FIGURE 12: P33 TO P36 PANEL-THRUST REVERSER, WIRE REMOVAL [Group 1-4] ........ 6 4
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 4 of 64 BOEING SERVICE BULLETIN 767-78-0096
Commercial Airplanes 767 Service Bulletin Revision Transmittal SheetNumber: 767-78-0096Original Issue: August 07, 2008 Revision 1: December 10, 2009 ATA System: 7834 SUBJECT: EXHAUST - Thrust Reverser Control System - Rolls Royce Powered Thrust Reverser Logic, Change This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION No more work is necessary on the airplane changed in accordance with the original issue of this service bulletin.
REASON FOR REVISION As a part of a service bulletin validation program, this change was completed on airplane VL873 by Service Bulletin 767-78-0096 Original Issue before the release of Revision 01 of this service bulletin. The change completed on airplane VL873 by Service Bulletin 767-78-0096 Original Issue is equivalent to the release of Revision 01 of this service bulletin. Airplane VL873 has the configuration of a Group 1 airplane.
This service bulletin revision is sent to provide operators with the changed service bulletin after the incorporation of the validation findings. During the modification, it was found that a ground block and two terminal blocks were named incorrectly in wiring diagrams in the service bulletin.A ground location that was found to be full has been changed to another ground in the same panel. A wire in the wire kit has been changed because it was too short.
Findings during testing led to a partial rewrite of the functional test to change the voltage check locations. It was also found that the EICAS message called out in the functional test of the Service Bulletin was not the correct one. A duplicate wire reference in the service bulletin is also corrected. A maintenance zones table has been added to the service bulletin. The Damage Tolerance Based Structural Inspections impact information was added.
These sections were changed:
1. Paragraph 1.D: a maintenance zones table has been added to the service bulletin.
2. Paragraph 1.K, Publications Affected: The Damage Tolerance Based Structural Inspections impact information was added.
3. Figure 2, sheet 1: ground GDX17-DC has been changed to GDX3-DC.
4. Figure 3, sheet 1: ground GDX9-DC has been changed to GDX3-DC.
5. Figure 2, sheet 2: the wire between D11763, term A3, and GDX12, was changed to W176-26P-20.
6. Figure 3, sheet 2: the wire between D11763, term A3, and GDX12, was changed to W176-26P-20.
7. Figure 5, sheet 2: the wire between D11763, term A3, and GDX12, was changed to W176-26P-20.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 5 of 64
8. Figure 8, sheet 3, and Figure 9, sheet 3, wire information table for 289T1156-102W: the length of wire W192-16S-22 was increased to 144 inches.
9. Figure 9, sheet 2: the terminal blocks were changed to TB314.
10. Paragraph 3.B, step 15.i: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB318, position Z26, and the ground in P36 panel.
11. Paragraph 3.B, step 15.j: the EICAS advisory message was changed to "REV ISLN VAL".
12. Paragraph 3.B, step 15.m: the EICAS advisory message was changed to "REV ISLN VAL".
13. Paragraph 3.B, step 15.o: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB318, position Z26, and the ground in P36 panel.
14. Paragraph 3.B, step 15.q: the EICAS advisory message was changed to "REV ISLN VAL".
15. Paragraph 3.B, step 15.r: this step was changed to disconnect the D14323P connector.
16. Paragraph 3.B, step 15.t: this step was changed to make sure that there are 25 to 32 volts DC between terminal block TB318, position Z26, and the ground in the P36 panel.
17. Paragraph 3.B, step 15.u and step 15.v: these steps were changed to connect the D14323P connector.
18. Paragraph 3.B, step 15.w: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB318, position Z26, and the ground in P36 panel.
19. Paragraph 3.B, step 15.ab: the EICAS advisory message was changed to "REV ISLN VAL".
20. Paragraph 3.B, step 15.ag: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB318, position Z26, and the ground in P36 panel.
21. Paragraph 3.B, step 16.i: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB274, position Z36, and the ground in the P37 panel.
22. Paragraph 3.B, step 16.j: the EICAS advisory message was changed to "ENG 2 REV ISLN VAL".
23. Paragraph 3.B, step 16.m: the EICAS advisory message was changed to "ENG 2 REV ISLN VAL".
24. Paragraph 3.B, step 16.o: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB274, position Z36, and the ground in the P37 panel.
25. Paragraph 3.B, step 16.q: the EICAS advisory message was changed to "ENG 2 REV ISLN VAL".
26. Paragraph 3.B, step 16.r: this step was changed to disconnect the D14323P connector.
27. Paragraph 3.B, step 16.t: this step was changed to make sure that there are 25 to 32 volts DC between terminal block TB274, position Z36, and the ground in the P37 panel.
28. Paragraph 3.B, step 16.u and step 16.v: these steps were changed to connect the D14323P connector.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 6 of 64 BOEING SERVICE BULLETIN 767-78-0096
29. Paragraph 3.B, step 16.w: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB274, position Z36, and the ground in the P37 panel.
30. Paragraph 3.B, step 16.ab: the EICAS advisory message was changed to "ENG 2 REV ISLN VAL".
31. Paragraph 3.B, step 16.ag: this step was changed to make sure that there are 0 to 3 volts DC between terminal block TB274, position Z36, and the ground in the P37 panel.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.
Pages with no vertical lines have no important changes.
The data given in Information Notice 767-78-0096 IN 01 and Information Notice 767-78-0096 IN02 are included in this revision.
REVISION HISTORY August 07, 2008Original Issue:
December 10, 2009Revision 1:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 7 of 64 BOEING SERVICE BULLETIN 767-78-0096
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 8 of 64 BOEING SERVICE BULLETIN 767-78-0096
BLANK PAGE
Commercial Airplanes 767 Service Bulletin SummaryNumber: 767-78-0096Original Issue: August 07, 2008 Revision 1: December 10, 2009 ATA System: 7834 SUBJECT: EXHAUST - Thrust Reverser Control System - Rolls Royce Powered Thrust Reverser Logic, Change
CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND This service bulletin gives instructions to change the thrust reverser control logic in the P36 and the P37 panels.
The change to the thrust reverser control logic will electrically isolate the number 2 and number 3 locking gear boxes from the air motor brake unlock proximity sensor. This change will prevent a gear box from unlocking when the air motor brake has an uncommanded disengagement. This is done by the removal of the air motor brake release relay from the thrust reverser control circuit. This change also installs a new unstow time delay relay for each engine. The position of the air motor brake, as sensed by the brake proximity sensor, will have no effect on the gear box unlock logic. If the change in this service bulletin is not done, then the number 2 locking gearbox can become unlocked with an associated air motor failure.
One operator reported that during takeoff roll an RB211-524 powered 747-400 airplane, the flight crew received the ENG 4 REV LIMTD EICAS status message and the ENG 4 REVERSER advisory and status messages.
During climb, the cabin crew saw sparks from the exhaust of the number 4 engine. As a precaution, the flight crew shutdown the number 4 engine and proceeded with an uneventful air turn-back and landing. The event was found to be caused by a failure of the o-rings in the air motor switcher or shutoff solenoid valves because of overheating. This let the air motor shutoff valve open, which released the air motor brake. This, in the ground mode, energized the number 2 and number 3 thrust reverser gear box unlock solenoids and unlocking the number 2 and number 3, gear boxes.
As noted previously, the subject event occurred on a 747-400 airplane. However, the thrust reverser system on the RB211 powered 767 is similar to the 747-400 and the 767 thrust reverser system is likely to be susceptible to the same failure mode.
Boeing Service Related Problem (SRP) 767-SRP-72-0029 is related to this service bulletin.
ACTION (PRR B12901-77S) Get access to the P36, P37, and P33 Panels. Add eleven (11) wires, remove five (5), and install one (1) relay socket and one (1) relay, inside the P36 Panel. Add ten (10) wires and remove four (4), and install one (1) relay socket and one (1) relay, inside the P37 Panel. Remove four (4) wires inside the P33 Panel. Remove four (4) wires between the P36 and P37 Panels. Do operational test for each engine. Return access.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 9 of 64
EFFECTIVITY 767 airplanes powered by Rolls Royce RB211 engines. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.
Federal Aviation Administration (FAA) Airworthiness Directive 94-17-03 is related to service bulletin 767-78-0059.
Service bulletin 767-78-0059 is related to this service bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months after the date on this service bulletin.
INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER Elapsed HoursTask-HoursTask
18.8031.30Group 1
18.8031.30Group 2
18.8031.30Group 3
18.8031.30Group 4
MATERIAL INFORMATION Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 10 of 64 BOEING SERVICE BULLETIN 767-78-0096
BOEING SERVICE BULLETIN 767-78-0096 IN THE P37 PANEL ADD NEW RELAY AND RELAY SOCKET.
DO WIRE CHANGE.
FWDR IN THE P36 PANEL ADD NEW RELAY AND RELAY SOCKET.
MAIN EQUIPMENT CENTER DO WIRE CHANGE. 1374323 Original Issue: August 07, 2008 Revision 1: December 10, 2009 BOEING PROPRIETARY - 767-78-0096 Copyright © Unpublished Work - See page 1 for details. 11 of 64
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 07, 2008 767-78-0096Revision 1: December 10, 2009 12 of 64 BOEING SERVICE BULLETIN 767-78-0096