Copy · Boeing Service Bulletin · 129 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0368; AD 2014-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'ee73019f0d88551b4c0d549023d5028ac464ac1975ac33e0baeb99845783f2c9'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 777 Service Bulletin Number: 777-24-0075 Original Issue: August 21, 2003 Revision 4: January 08, 2014 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches (Complete) Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2003 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 1 of 129

5.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 2 of 129 BOEING SERVICE BULLETIN 777-24-0075

BLANK PAGE

Table of Contents

Revision Transmittal Sheet5

Summary7

1. PLANNING INFORMATION ........................................ 1 3 A. Effectivity ............................................... 1 3

1. Airplanes ............................................ 1 3

2. Spares Affected ........................................ 1 5 B. Concurrent Requirements ...................................... 1 5 C. Reason ................................................ 1 9 D. Description .............................................. 2 0 E. Compliance .............................................. 2 2 F. Approval ............................................... 2 2 G. Manpower .............................................. 2 2 H. Weight and Balance Changes .................................... 2 4 I. Electrical Load Data ......................................... 2 5 J. References .............................................. 2 6

1. Existing Data: ......................................... 2 6

2. Data Supplied with this Service Bulletin: ........................... 2 7

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 7 K. Publications Affected ........................................ 2 7 L. Interchangeability and Intermixability of Parts ........................... 2 8 M. Software Accomplishment Summary ................................ 2 8

2. MATERIAL INFORMATION ........................................ 2 9 A. Material - Price and Availability ................................... 2 9 B. Industry Support Information .................................... 3 1 C. Parts Necessary for Each Airplane ................................. 3 1

1. Kits/Parts: ........................................... 3 1

2. Parts and Materials Supplied by the Operator: ........................ 3 8

3. Parts Modified and Reidentified: ............................... 3 9

4. Parts Removed and Not Replaced: .............................. 3 9 D. Parts Necessary to Change Spares ................................. 3 9 E. Special Tooling - Price and Availability ............................... 3 9 F. Special Tooling Necessary to do this Service Bulletin ....................... 3 9

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 1 A. GENERAL INFORMATION ..................................... 4 1 B. WORK INSTRUCTIONS ....................................... 4 1 FIGURE 1: CHANGE THE AIRPLANE WIRING [Group 1] ........................ 5 7 FIGURE 2: CHANGE THE AIRPLANE WIRING [Group 2] ........................ 6 1 FIGURE 3: CHANGE THE AIRPLANE WIRING [Group 3] ........................ 6 6 FIGURE 4: CHANGE THE AIRPLANE WIRING [Group 4] ........................ 7 1 FIGURE 5: CHANGE THE AIRPLANE WIRING [Group 5] ........................ 7 6 FIGURE 6: CHANGE THE AIRPLANE WIRING [Group 6] ........................ 8 1 FIGURE 7: CHANGE THE AIRPLANE WIRING [Group 7] ........................ 8 6 FIGURE 8: CHANGE THE AIRPLANE WIRING [Group 8] ........................ 9 5 FIGURE 9: AIRPLANE WIRE ROUTING ................................. 1 0 0 FIGURE 10: SUPPLEMENTAL AIRPLANE WIRE ROUTING [Group 2-8, 10] .............. 1 0 6 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 3 of 129 BOEING SERVICE BULLETIN 777-24-0075

FIGURE 11: P101 PANEL WIRE ROUTING [Group 6] .......................... 1 1 5 FIGURE 12: P101 PANEL WIRE ROUTING [Group 7] .......................... 1 1 7 FIGURE 13: CHANGE THE AIRPLANE WIRING [Group 9] ....................... 1 1 9 FIGURE 14: CHANGE THE AIRPLANE WIRING [Group 10] ....................... 1 2 3 FIGURE 15: P101 PANEL WIRE ROUTING [Group 10] ......................... 1 2 8 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 4 of 129 BOEING SERVICE BULLETIN 777-24-0075

Commercial Airplanes 777 Service Bulletin Revision Transmittal SheetNumber: 777-24-0075Original Issue: August 21, 2003 Revision 4: January 08, 2014 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches (Complete) This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Notice of Proposed Rule Making (NPRM) 2012-NM-058-AD, is related to this service bulletin.

No more work is necessary on the airplane(s) changed in accordance with the original issue, Revision 1, Revision 2 or Revision 3 of this service bulletin.

REASON FOR REVISION This revision is sent to add a Boeing Service Bulletin reference in the Concurrent Requirements table and to change some GE Aviation service bulletin revision data.

These sections were changed:

1. In Summary, Action, Paragraph 1.B., Concurrent Requirements, Paragraph 1.D., Description and Paragraph 3.B., Work Instructions, step 3, changed the GE Aviation service bulletin revision data.

2. In Summary, Compliance and Paragraph 1.E., Compliance, changed the FAA compliance data.

3. In Summary, Background, added a Summary Evaluation Table.

4. In Paragraph 1.B., Concurrent Requirements:

a. Changed the Boeing Service Bulletins 777-23-0175 and 777-24-0074 revision data.

b. Added the Boeing Service Bulletin 777-28A0039 data.

5. In Paragraph 1.H., Weight and Balance Changes, changed the weight and balance data.

6. In Paragraph 1.I., Electrical Load Data, changed the circuit breaker data.

7. In Paragraph 1.J.1., Existing Data:

a. Added the Boeing Service Bulletin 777-28A0039 reference.

b. Added the FAA NPRM 2012-NM-058-AD reference.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 5 of 129

8. In Paragraph 1.K., Publications Affected, changed the publications affected data.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes, to show the location of all content changes.

Pages with no vertical lines have no changes.

REVISION HISTORY August 21, 2003Original Issue:

December 11, 2003Revision 1:

October 05, 2006Revision 2:

August 26, 2010Revision 3:

January 08, 2014Revision 4:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 6 of 129 BOEING SERVICE BULLETIN 777-24-0075

Commercial Airplanes 777 Service Bulletin SummaryNumber: 777-24-0075Original Issue: August 21, 2003 Revision 4: January 08, 2014 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches (Complete)

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND The change described in this service bulletin will provide new switches on the flight deck than can remove power from the cabin systems if smoke or flames occur. Smoke and flames in the passenger cabin can cause injury to the passenger and damage the safety critical cabin equipments.

We have received numerous reports of smoke or flames in the passenger cabin related to the wiring for the passenger cabin in-flight entertainment system, cabin lighting and passenger seats. It is not easy to remove the electrical power to these systems to stop the smoke or flames.

Two switches can be installed to remove power from some of the passenger cabin electrical systems. When selected OFF, the IFE/PASS SEATS switch will remove power from all the components of the IFE (in-flight entertainment) system and the passenger seats (seat motor power, personal computer power outlets and telephones).

When selected OFF, the CABIN/UTILITY switch will remove power from all the galleys, the ground service bus (except the main and APU battery chargers and left forward fuel pump), the utility busses, the gasper air fan, the fluorescent cabin lighting and the beacon, wing and logo lights. While the switch is off, the nights lights, the supplemental nights lights, the reading lights, the attendant work lights and some of the galley and crew rest lights will be turned on.

Boeing Service Related Problem (SRP) 777-SRP-24-0091 is related to this service bulletin.

This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.

ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph

1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataYesElectrical Load Changed Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 7 of 129

ReferenceAffectedPlanning Data Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedYesAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION (PRR 61887) In the main equipment center, 15 new wires are routed from the P110 panel to the P210 panel. Three new wires are routed from the P210 panel to the P320 panel. One new wire is routed from the P110 panel aft and up to the P101 panel. For Group 6 and 10 airplanes only, one new relay and four new wires are installed in the P101 panel. For Group 7 airplanes only, two new relays and 10 new wires are installed in the P101 panel. The hardware and software is changed in the P110 panel, P210 panel and P320 panel as specified in the GE Aviation service bulletins. A test of the IFE/PASS SEATS and the CABIN UTILITY switches is done.

Refer to these GE Aviation service bulletins to determine specific applicability of the concurrent required GE Aviation service bulletins. Use the revision level of the dated service bulletins or a later FAA approved revision.

Power PanelRevision and DateGE Aviation Service Bulletin Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-AAL Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-AAR Reference OnlyRevision 1, Dated February 23, 2004ELMS-24-AFA Reference OnlyRevision 2, Dated January 20, 2006ELMS-24-ANA Reference OnlyRevision 1, Dated February 19, 2004ELMS-24-BAB Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-BEJ Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-CAL Reference OnlyRevision 1, Dated March 01, 2004ELMS-24-CAT Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-DAL Reference OnlyRevision 1, Dated January 16, 2004ELMS-24-EAD Reference OnlyRevision 1, Dated March 01, 2004ELMS-24-EGP Reference OnlyRevision 1, Dated February 19, 2004ELMS-24-EIY Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-ELA Reference OnlyRevision 1, Dated February 19, 2004ELMS-24-ILF Reference OnlyRevision 1, Dated March 01, 2004ELMS-24-JAL Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 8 of 129 BOEING SERVICE BULLETIN 777-24-0075

Power PanelRevision and DateGE Aviation Service Bulletin Reference OnlyRevision 3, Dated May 23, 2005ELMS-24-JAS Reference OnlyRevision 3, Dated December 14, 2009ELMS-24-KAL Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-KUW Reference OnlyRevision 2, Dated March 06, 2006ELMS-24-LAL Reference OnlyRevision 1, Dated February 19, 2004ELMS-24-MAS Reference OnlyOriginal issue, Dated July 04, 2003ELMS-24-S160 Reference OnlyRevision 1, Dated February 23, 2004ELMS-24-SIA Reference OnlyRevision 1, Dated February 19, 2004ELMS-24-SVA Reference OnlyRevision 1, Dated May 24, 2004ELMS-24-SKL Reference OnlyRevision 1, Dated March 01, 2004ELMS-24-TII

EFFECTIVITY 777-200 and 777-300 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.

COMPLIANCE Federal Aviation Administration (FAA) Notice of Proposed Rule Making (NPRM) 2012-NM-058-AD, is related to this service bulletin.

Boeing recommends that this service bulletin be done within 60 months after the effective date of an applicable Airworthiness Directive.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.

MANPOWER Elapsed HoursTotal Task HoursAirplanes

17.034.0Groups 1 and 9

17.7535.5Group 2

17.535.0Group 3

17.535.0Group 4

17.2534.5Group 5

17.7535.5Groups 6 and 10

20.040.0Group 7

17.5035.0Group 8 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 9 of 129 BOEING SERVICE BULLETIN 777-24-0075

The change to the P110, P210 and P320 panels as given in the GE Aviation service bulletins is not included.

Refer to the airplane specific service bulletins to get the man-hours necessary for each panel.

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 10 of 129 BOEING SERVICE BULLETIN 777-24-0075

Page 11OCROpen in PDF

BOEING SERVICE BULLETIN 777-24-0075 P101 PANEL CHANGE THE P210 RIGHT ROUTE THREE NEW WIRES GROUP 6 AND 10 AIRPLANES POWER MANAGEMENT PANEL FROM THE P210 PANEL TO -INSTALL ONE NEW RELAY AND HARDWARE AND SOFTWARE THE P320 PANEL

FOUR NEW WIRES ROUTE ONE GROUP 7 AIRPLANES E1/E2 RACK NEW WIRE -INSTALL TWO NEW RELAYS FROM THE AND 10 NEW WIRES P110 PANEL TO THE P101 PANEL SEE FWD K ROUTE 15 NEW WIRES FROM THE P110 PANEL TO THE P210 PANEL

MAIN EQUIPMENT CENTER ACCESS DOOR, 117AL CHANGE THE P320 GROUND

SERVICE HANDLING POWER DO A TEST OF THE IFE/PASS SEATS PANEL HARDWARE AND CHANGE THE P110 LEFT

AND CABIN UTILITY SWITCHES SOFTWARE POWER MANAGEMENT PANEL

FWD HARDWARE AND SOFTWARE

ELECTRICAL

BATTERY APU

IFE/PASS CABIN ON ON START MAIN EQUIPMENT CENTER

SEATS UTILITY ON ON

OFF OFF FAULT

L BUS TIE R BUS TIE

AUTO AUTO SEE

ISLN SECONDARY PRIMARY ISLN

EXT PWR EXT PWR ON ON

GEN GEN

CTRL CTRL

BACKUP GEN ON ON

OFF OFF FWD OVERHEAD PANEL, P5 -DRIVE DISC FLIGHT COMPARTMENT W14812 Original Issue: August 21, 2003 Revision 4: January 08, 2014 Export Controlled ECCN: 9E991 - BOEING 777-24-0075 PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 129

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 4: January 08, 2014 12 of 129 BOEING SERVICE BULLETIN 777-24-0075

BLANK PAGE

Pages 13–24 of 129