Copy · SB-777-28-0083-01 · 72 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0920; AD 2015-07-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'ed893b87acb44593deda97a6154177fca74f623768a08ae521a7fad4295030de'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 777 Service Bulletin

SPECIAL ATTENTION Number: 777-28-0083 Original Issue: September 08, 2014 Revision 1: March 06, 2015 ATA System: 2822 2831 2409 2623 1120 SUBJECT: FUEL - Engine Fuel Feed System - Control of the Center Fuel Tank Fuel Scavenge System, Wiring and Software Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2014 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 1 of 72

5.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 2 of 72 BOEING SERVICE BULLETIN 777-28-0083

BLANK PAGE

Table of Contents

Revision Transmittal Sheet5

Summary9

1. PLANNING INFORMATION ........................................ 1 3 A. Effectivity ............................................... 1 3

1. Airplanes ............................................ 1 3

2. Spares Affected ........................................ 1 6 B. Concurrent Requirements ...................................... 1 6 C. Reason ................................................ 1 6 D. Description .............................................. 1 7 E. Compliance .............................................. 1 8 F. Approval ............................................... 1 9 G. Manpower .............................................. 1 9 H. Weight and Balance Changes .................................... 2 1 I. Electrical Load Data ......................................... 2 2 J. References .............................................. 2 2

1. Existing Data: ......................................... 2 2

2. Data Supplied with this Service Bulletin: ........................... 2 3

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 3 K. Publications Affected ........................................ 2 3 L. Interchangeability and Intermixability of Parts ........................... 2 4 M. Software Accomplishment Summary ................................ 2 4

2. MATERIAL INFORMATION ........................................ 2 5 A. Material - Price and Availability ................................... 2 5 B. Industry Support Information .................................... 2 7 C. Parts Necessary for Each Airplane ................................. 2 7

1. Kits/Parts ............................................ 2 7

2. Parts and Materials Supplied by the Operator ........................ 3 0

3. Parts Modified and Reidentified ................................ 3 1

4. Parts Removed and Not Replaced .............................. 3 1 D. Parts Necessary to Change Spares ................................. 3 2 E. Special Tooling - Price and Availability ............................... 3 2 F. Special Tooling Necessary to do this Service Bulletin ....................... 3 2

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 3 A. GENERAL INFORMATION ..................................... 3 3 B. WORK INSTRUCTIONS ....................................... 3 4 FIGURE 1: LEFT WING REAR SPAR IN THE LEFT MAIN LANDING GEAR BAY - PLACARD - REMOVAL [Group 1-2] ........................................... 3 7 FIGURE 2: RIGHT WING REAR SPAR IN THE RIGHT MAIN LANDING GEAR BAY - PLACARD - REMOVAL [Group 1-2] ........................................... 3 9 FIGURE 3: MAIN EQUIPMENT CENTER - WIRE BUNDLE W5732 - WIRE ROUTING [Group 1, 3] . 41 FIGURE 4: MAIN EQUIPMENT CENTER - WIRE BUNDLE W5732 - WIRING CHANGE [Group 1, 3] . 45 FIGURE 5: MAIN EQUIPMENT CENTER - WIRE BUNDLE W8327 - WIRE ROUTING [Group 2, 4] . 48 FIGURE 6: MAIN EQUIPMENT CENTER - WIRE BUNDLE W8327 - WIRING CHANGE [Group 2, 4] . 52 FIGURE 7: MAIN EQUIPMENT CENTER - WIRE BUNDLE W5829 - WIRE ROUTING [Group 1-4] . . 55 FIGURE 8: MAIN EQUIPMENT CENTER - WIRE BUNDLE W5829 - WIRING CHANGE [Group 2, 4] . 60 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 3 of 72 BOEING SERVICE BULLETIN 777-28-0083

FIGURE 9: MAIN EQUIPMENT CENTER - WIRE BUNDLE W5829 - WIRING CHANGE [Group 1, 3] . 62 APPENDIX A: ELECTRICAL LOAD MANAGEMENT SYSTEM 2 (ELMS2) SOFTWARE INSTALLATION . 64 APPENDIX B: FUNCTIONAL TEST ...................................... 6 6 APPENDIX C: PART DEMAND INTENT ................................... 7 2 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 4 of 72 BOEING SERVICE BULLETIN 777-28-0083

Commercial Airplanes 777 Service Bulletin

SPECIAL ATTENTION Revision Transmittal SheetNumber: 777-28-0083Original Issue: September 08, 2014 Revision 1: March 06, 2015 ATA System: 2822 2831 2409 2623 1120 SUBJECT: FUEL - Engine Fuel Feed System - Control of the Center Fuel Tank Fuel Scavenge System, Wiring and Software Change This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2014-NM-192-AD, is related to this service bulletin.

Effects of this Revision on airplanes on which the original issue was previously done:

– None.

REASON FOR REVISION This revision is sent to provide clarifications, and to correct wire length and part errors in the wire-kits. In the wire-kits, some of the wires were too short and some wrong parts or part quantities were included. The wire-kit numbers are changed for the corrected wire-kits, and thus some parts in the wire-kits that were correct now just have their part numbers updated.

These sections are changed:

1. Summary Background:

– Clarified.

2. Summary Action:

– Clarified.

3. Summary Compliance:

– Updated.

4. Summary Illustration:

– Clarified.

5. Paragraph 1.A., Effectivity:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 5 of 72

– Group/Configuration table: Clarified (a revision bar or vertical line is not applied).

6. Paragraph 1.B., Concurrent Requirements:

– Clarified.

7. Paragraph 1.C., Reason:

– Clarified.

8. Paragraph 1.D., Description:

– Clarified.

9. Paragraph 1.E., Compliance:

– Updated.

10. Paragraph 1.G., Manpower:

– The statement regarding the General Electric service bulletins is added;

– The estimates are updated.

11. Paragraph 1.J., References:

– Updated and clarified.

12. Paragraph 1.K., Publications Affected:

– Corrected: A row is deleted and thus a revision bar or vertical line is not applied.

13. Paragraph 1.M., Software Accomplishment Summary:

– Clarified.

14. Paragraph 2.A., Material - Price and Availability:

– Updated and clarified.

15. Paragraph 2.C.1., Kits/Parts:

– Corrected, updated and clarified.

16. Paragraph 2.C.2., Parts and Materials Supplied by the Operator:

– Removed a part and thus a revision bar or vertical line is not applied.

17. Paragraph 3.A., General Information:

– Note 17: Clarified.

18. Paragraph 3.B., Work Instructions:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 6 of 72 BOEING SERVICE BULLETIN 777-28-0083

– Step 2: Clarified;

– Step 4: Clarified.

19. FIGURE 1:

– Step 1: Clarified;

– Footnote (b): Clarified.

20. FIGURE 2:

– Step 1: Clarified;

– Footnote (b): Clarified.

21. FIGURE 3:

– Note added;

– Step 1: Changed part number.

22. FIGURE 4:

– Changed wire-kit number;

– Flagnotes 4 and 5: Changed part number.

23. FIGURE 5:

– Note added;

– Step 1: Changed part number.

24. FIGURE 6:

– Changed wire-kit number;

– Flagnotes 4 and 5: Changed part number.

25. FIGURE 7:

– Note added;

– Step 1: Changed part number.

26. FIGURE 8:

– Corrected illustration;

– Changed wire-kit number;

– Flagnote 2: Corrected quantity;

– Flagnote 4: Changed part number.

27. FIGURE 9:

– Corrected illustration;

– Changed wire-kit number;

– Flagnote 2: Corrected quantity;

– Flagnote 4: Changed part number.

28. APPENDIX A:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 7 of 72 BOEING SERVICE BULLETIN 777-28-0083

– Clarified.

29. APPENDIX B:

– Step 5: Substeps added; A substep is removed.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes, to show the location of all content changes.

Pages with no vertical lines have no changes.

REVISION HISTORY September 08, 2014Original Issue:

March 06, 2015Revision 1:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 8 of 72 BOEING SERVICE BULLETIN 777-28-0083

Commercial Airplanes 777 Service Bulletin

SPECIAL ATTENTION SummaryNumber: 777-28-0083Original Issue: September 08, 2014 Revision 1: March 06, 2015 ATA System: 2822 2831 2409 2623 1120 SUBJECT: FUEL - Engine Fuel Feed System - Control of the Center Fuel Tank Fuel Scavenge System, Wiring and Software Change BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND This service bulletin is sent to make additional wiring changes and install updated Electrical Load Management System 2 (ELMS2) software, for the fuel scavenge system. If this service bulletin is not done then with a single latent failure of the auto shut off circuit there can be potential for extended dry-running of the jettison pumps as they provide motive flow to the fuel scavenge jet pumps. The potential for extended dry-running of the jettison pumps does not meet enhanced safety requirements which require that latent failures be addressed in the design. For those airplanes that fly short missions of 4 hours or less, the existing design continues to control the jettison pump(s) after the fuel level is lower than the pump inlet level, and uses the low pressure auto shutoff to turn off the pump which results in low pressure warning messages displayed on the Engine Indication and Crew Alerting System (EICAS). Extended dry-running of the jettison pumps can cause a fuel tank explosion in the extremely unlikely event that the jettison pump overheats or has an electrical fault.

The airplanes in this service bulletin had the new fuel scavenge system installed in production. The ELMS2 software controls each main fuel tank jettison pump in driving each center fuel tank fuel scavenge jet pump. For fuel scavenge, the jettison pumps will operate 45 minutes after the center fuel tank override/jettison pumps are shut down and continue to operate for 4 hours. On short flights of less than 4 hours, not enough fuel is loaded in the main fuel tanks to keep the jettison pump inlets covered for the full fuel scavenge cycle. This can result in the potential for extended dry-running of the jettison pumps. A minimum of approximately 2000 gallons of fuel is needed in each main fuel tank to keep the fuel tank jettison pump inlet covered.

This service bulletin installs updated ELMS2 software, which will shut-off both main fuel tank jettison pumps (when in fuel scavenge mode) when both the main tanks fuel quantity reduces to approximately 2500 gallons each. Some additional wiring changes are also made in the main equipment center to improve the jettison pump auto shut-off control.

The updated ELMS2 software also includes changes to prevent one known cause of inadvertent discharge of the Cargo Fire Suppression System (CFSS) metered bottles (there have been two reports of an inadvertent CFSS discharge related to the ELMS discharge control logic).

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 9 of 72

Group 1-2:

It is also necessary to remove unwanted placards at the old location of the fuel scavenge jet pumps, because the fuel scavenge jet pumps are now located in the body center fuel tank.

Group 5:

The updated ELMS2 software is the only change that is necessary. The additional wiring changes were done in production.

Boeing Fleet Team Digest (FTD) 777 FTD 28-07002, 777 FTD 28-09001 and 777 FTD 28-09004 are related to this service bulletin.

The related Boeing service bulletin is 777-28-0078. SB 777-28-0078 installs the new fuel scavenge system in ELMS2 airplanes with body center fuel tanks before line number 1099.

Boeing Service Related Problem (SRP) 777-SRP-28-0125 is related to this service bulletin.

This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.

ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph

1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION (PRR 62777-79S) Group 1-2:

At the left and right wing rear spar in the main landing gear bays, remove the unwanted placard at the old location of the fuel scavenge jet pump (can be done before, at the same time, or after the work in the main equipment center).

Group 1-4:

In the main equipment center, do some wiring changes between the P110 and P301 panels, and between the P210 and P302 panels. Do some wiring changes in the P110 and P210 panels.

Install new ELMS2 software. Do a functional test.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 10 of 72 BOEING SERVICE BULLETIN 777-28-0083

EFFECTIVITY 777-200/-200LR/-300ER/F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.

COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2014-NM-192-AD, is related to this service bulletin.

Group 1-4:

Boeing recommends that the change given in this service bulletin be done within 36 months after the original issue date of this service bulletin.

Group 5:

Boeing recommends that the change given in this service bulletin be done within 12 months after the original issue date of this service bulletin.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of August 23, 2007. Please refer to Paragraph

2.B., Industry Support Information. The warranty remedies will expire eight years from the original issue date of this service bulletin.

MANPOWER Refer to Paragraph 1.G., Manpower.

MATERIAL INFORMATION Boeing Supplied Kits/Parts. Refer to Paragraph 2.A., Material - Price and Availability.

Operators are encouraged to complete the survey provided in APPENDIX C of this service bulletin to help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 08, 2014 777-28-0083Revision 1: March 06, 2015 11 of 72 BOEING SERVICE BULLETIN 777-28-0083

Page 12OCROpen in PDF

BOEING SERVICE BULLETIN 777-28-0083 GROUP 1-2:

REMOVE UNWANTED

PLACARD

LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE GROUP 1-4:

DO SOME WIRING CHANGES BETWEEN THE P110 AND P301 PANELS, AND BETWEEN THE P210 AND P302 PANELS.

DO SOME WIRING CHANGES IN THE P110 AND P210 PANELS.

P210 P302

- P110 P301

MAIN EQUIPMENT CENTER GROUP 1-5:

INSTALL NEW ELMS2 SOFTWARE. DO A FUNCTIONAL TEST.

Original Issue: September 08, 2014 Revision 1: March 06, 2015 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 777-28-0083 Work - See page 1 for details. 12 of 72

Pages 13–24 of 72