TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '29d3387d92aaa207ccdc880af44c5f12ba6b7dc73e027fec1da6d7a061fab8cb' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '29d3387d92aaa207ccdc880af44c5f12ba6b7dc73e027fec1da6d7a061fab8cb' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 777 Service Bulletin Number: 777-54-0030 Original Issue: May 27, 2014 ATA System: 5452 SUBJECT: NACELLES/PYLONS - Aft Fairing - Strut Aft Fairing Lower Spar Heat Shield Insulation Blankets Replacement Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2014 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: May 27, 2014 777-54-0030 1 of 72
5.0
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 2 of 72 BOEING SERVICE BULLETIN 777-54-0030
BLANK PAGE
Table of Contents
Summary5
1. PLANNING INFORMATION9
A. Effectivity9
1. Airplanes9
2. Spares Affected ........................................ 1 0 B. Concurrent Requirements ...................................... 1 0 C. Reason ................................................ 1 1 D. Description .............................................. 1 2 E. Compliance .............................................. 1 2 F. Approval ............................................... 1 2 G. Manpower .............................................. 1 2 H. Weight and Balance Changes .................................... 1 4 I. Electrical Load Data ......................................... 1 4 J. References .............................................. 1 4
1. Existing Data: ......................................... 1 4
2. Data Supplied with this Service Bulletin: ........................... 1 4
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 5 K. Publications Affected ........................................ 1 5 L. Interchangeability and Intermixability of Parts ........................... 1 5 M. Software Accomplishment Summary ................................ 1 5
2. MATERIAL INFORMATION ........................................ 1 7 A. Material - Price and Availability ................................... 1 7 B. Industry Support Information .................................... 1 8 C. Parts Necessary for Each Airplane ................................. 1 8
1. Kits/Parts ............................................ 1 8
2. Parts and Materials Supplied by the Operator ........................ 2 1
3. Parts Modified and Reidentified ................................ 2 2
4. Parts Removed and Not Replaced .............................. 2 2 D. Parts Necessary to Change Spares ................................. 2 2 E. Special Tooling - Price and Availability ............................... 2 2 F. Special Tooling Necessary to do this Service Bulletin ....................... 2 2
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 3 A. GENERAL INFORMATION ..................................... 2 3 B. WORK INSTRUCTIONS ....................................... 2 4 FIGURE 1: LEFT STRUT - HEAT SHIELD INSULATION BLANKET REMOVAL ............ 2 6 FIGURE 2: RIGHT STRUT - HEAT SHIELD INSULATION BLANKET REMOVAL ........... 3 1 FIGURE 3: LEFT STRUT - VELCRO STRIPS REPLACEMENT ..................... 3 6 FIGURE 4: RIGHT STRUT - VELCRO STRIPS REPLACEMENT .................... 3 9 FIGURE 5: LEFT STRUT - DRAIN SUMP REPLACEMENT [Group 1] .................. 4 2 FIGURE 6: RIGHT STRUT - DRAIN SUMP REPLACEMENT [Group 1] ................. 5 0 FIGURE 7: LEFT STRUT - HEAT SHIELD INSULATION BLANKET INSTALLATION ......... 5 8 FIGURE 8: RIGHT STRUT - HEAT SHIELD INSULATION BLANKET INSTALLATION ......... 6 5 APPENDIX A: MASTER FASTENER CODE TABLE ............................. 7 2 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 3 of 72 BOEING SERVICE BULLETIN 777-54-0030
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 4 of 72 BOEING SERVICE BULLETIN 777-54-0030
BLANK PAGE
Commercial Airplanes 777 Service Bulletin SummaryNumber: 777-54-0030Original Issue: May 27, 2014 ATA System: 5452 SUBJECT: NACELLES/PYLONS - Aft Fairing - Strut Aft Fairing Lower Spar Heat Shield Insulation Blankets Replacement
CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND Accomplishment of this service bulletin will increase the thermal capability and improve the durability of the strut aft fairing lower spar heat shield insulation blankets. Airflow into the cavity between the strut and strut aft fairing heat shield is forced upon the forward blanket face and through the heat shield cavity, which results in accelerated wear damage to the heat shield insulation blankets. Wear damage to insulation blankets could lead to damage of the aft fairing lower spar web, which could result in unscheduled airplane maintenance and downtime for repair.
Multiple operators have reported multiple cases of damage to strut aft fairing high temperature seals and heat shield insulation blankets. Boeing performed a root cause evaluation and found that continuous exposure to turbulent air can cause a degradation of the front face of the #1 heat shield insulation blanket and heat shield primary seal. The degradation exposes the strut aft fairing lower spar web structure and heat shield insulation blankets to high temperature air. New insulation blankets will provide improved durability and thermal protection.
The new design of the insulation blankets includes changes to the insulation material that improved the insulation blankets to be resistant to higher temperatures and higher velocity air. The #1 heat shield insulation blanket nose piece material was changed from silicone and quartz to nextel fabric, which demonstrates better performance to resist damage from turbulent air during testing. In addition to the changes to the insulation blankets, a Nitronic 60 rub strip will be added to the seal depressor. The Nitronic 60 rub strip has improved friction characteristics that allow for free movement and reduces wear damage to the primary seal.
This service bulletin provides instructions to replace heat shield insulation blankets and install Nitronic 60 rub strips. Due to the new configuration of the insulation blankets, some airplanes will need new aft fairing lower spar web drain sumps when replacing insulation blankets. Replacement of the insulation blankets will reduce blanket wear damage due to turbulent airflow. Installation of the rub strip will provide better seal compression and wear resistance to extend the life of the strut aft fairing lower spar primary seal.
Incorporation of the changes in accordance with this service bulletin, and a final one time inspection and corrective actions in accordance with Service Bulletin (SB) 777-54A0031 is terminating action to the repeat inspections in accordance with SB 777-54A0031. The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to SB 777-54A0031.
Boeing Fleet Team Digest (FTD) 777 FTD 54-11003 is related to this service bulletin.
Boeing Service Related Problem (SRP) 777-SRP-54-0137 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 5 of 72
This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.
ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph
1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION (PRR 62777-92S) Group 1:
Get access to the upper and lower aft fairing structure. Replace insulation blankets, drain sump, and velcro.
Install new rub strips to seal depressor. Close access to the upper and lower aft fairing structure.
Group 2:
Get access to the upper and lower aft fairing structure. Replace insulation blankets and velcro. Install new rub strips to seal depressor. Close access to the upper and lower aft fairing structure.
EFFECTIVITY 777-200, -300 Airplanes with Rolls Royce Engines. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin.
No compliance time is given.
Boeing recommends this service bulletin be done to introduce improvements.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 6 of 72 BOEING SERVICE BULLETIN 777-54-0030
INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of June 8, 2011. Please refer to Paragraph
2.B., Industry Support Information. The warranty remedies will expire eight years from the original issue date of this service bulletin.
MANPOWER Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 7 of 72 BOEING SERVICE BULLETIN 777-54-0030
BOEING SERVICE BULLETIN 777-54-0030
LEFT ENGINE SHOWN
RIGHT ENGINE OPPOSITE AFT
FAIRING
AFT FAIRING
DRAIN INLET GROUP 1:
GET ACCESS TO THE UPPER AND LOWER AFT FAIRING STRUCTURE.
REPLACE INSULATION BLANKETS, DRAIN SUMP, AND VELCRO.
INSTALL NEW RUB STRIPS TO SEAL DEPRESSOR. CLOSE ACCESS TO THE UPPER AND LOWER AFT FAIRING STRUCTURE.
AFT FAIRING HEATSHIELD GROUP 2:
SEAL GET ACCESS TO THE UPPER AND LOWER AFT FAIRING STRUCTURE.
REPLACE INSULATION BLANKETS AND VELCRO. INSTALL NEW RUB STRIPS TO SEAL DEPRESSOR. CLOSE ACCESS TO THE UPPER AND LOWER AFT FAIRING STRUCTURE.
AFT FAIRING 2289670 Original Issue: May 27, 2014 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 777-54-0030 Work - See page 1 for details. 8 of 72
Commercial Airplanes 777 Service Bulletin Number: 777-54-0030 Original Issue: May 27, 2014 ATA System: 5452 SUBJECT: NACELLES/PYLONS - Aft Fairing - Strut Aft Fairing Lower Spar Heat Shield Insulation Blankets Replacement
1. PLANNING INFORMATION A. Effectivity
1. Airplanes This service bulletin is for the airplane(s) shown below. An equivalent change is on subsequent production airplanes. Refer to PRR 62777-92S for data about this change.
Refer to Service Bulletin Index D624W001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP 777-200, 777-300 Airplanes with Rolls Royce Engines, line number 14-126, delivered with Drain Sump Assembly, Part Number 313W5816-1 -1 777-200, 777-300 Airplanes with Rolls Royce Engines, line number 1, 128 through 796, delivered with Drain Sump Assembly, Part Number 313W5816-5 or 313W5816-7 -2 Airplane Models:
777-200, 777-300 GroupVariable Number 2WA001 1WA086 - WA093 1WA101 - WA104 1WA196 - WA198 2WB031 - WB046 1WB101 - WB104 2WB105 - WB106 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 9 of 72
GroupVariable Number 1WB161 - WB165 2WB166 - WB177 1WB181 - WB186 2WB187 - WB194 2WB201 - WB215 2WB231 - WB247 2WB416 - WB439 2WB446 - WB453 1WB501 - WB503 2WB504 - WB512 2WB601 - WB606 2WB611 - WB622 2WB631 - WB638 2WB646 - WB649 2WC051 - WC073 2WC101 - WC104 2WC456 - WC459 2WC486 - WC493 2WC531 - WC536 2WC566 - WC567 2WC571 - WC574
2. Spares Affected None.
B. Concurrent Requirements The service bulletin listed below must be done before or at the same time as this service bulletin:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 10 of 72 BOEING SERVICE BULLETIN 777-54-0030
DescriptionService BulletinCompany Inspects the strut aft fairing lower spar web structure and heat shield primary seal for heat damage. Corrective actions for inspections include replacement of damaged parts and repeat inspections. Accomplishment of Service Bulletin (SB) 777-54-0030, at the same time as SB 777-54A0031, is terminating action to the repeat inspections in accordance with SB 777-54A0031.
777-54A0031 Original IssueThe Boeing Company C. Reason Accomplishment of this service bulletin will increase the thermal capability and improve the durability of the strut aft fairing lower spar heat shield insulation blankets. Airflow into the cavity between the strut and strut aft fairing heat shield is forced upon the forward blanket face and through the heat shield cavity, which results in accelerated wear damage to the heat shield insulation blankets. Wear damage to insulation blankets could lead to damage of the aft fairing lower spar web, which could result in unscheduled airplane maintenance and downtime for repair.
Multiple operators have reported multiple cases of damage to strut aft fairing high temperature seals and heat shield insulation blankets. Boeing performed a root cause evaluation and found that continuous exposure to turbulent air can cause a degradation of the front face of the #1 heat shield insulation blanket and heat shield primary seal. The degradation exposes the strut aft fairing lower spar web structure and heat shield insulation blankets to high temperature air. New insulation blankets will provide improved durability and thermal protection.
The new design of the insulation blankets includes changes to the insulation material that improved the insulation blankets to be resistant to higher temperatures and higher velocity air. The #1 heat shield insulation blanket nose piece material was changed from silicone and quartz to nextel fabric, which demonstrates better performance to resist damage from turbulent air during testing. In addition to the changes to the insulation blankets, a Nitronic 60 rub strip will be added to the seal depressor. The Nitronic 60 rub strip has improved friction characteristics that allow for free movement and reduces wear damage to the primary seal.
This service bulletin provides instructions to replace heat shield insulation blankets and install Nitronic 60 rub strips. Due to the new configuration of the insulation blankets, some airplanes will need new aft fairing lower spar web drain sumps when replacing insulation blankets. Replacement of the insulation blankets will reduce blanket wear damage due to turbulent airflow. Installation of the rub strip will provide better seal compression and wear resistance to extend the life of the strut aft fairing lower spar primary seal.
Incorporation of the changes in accordance with this service bulletin, and a final one time inspection and corrective actions in accordance with Service Bulletin (SB) 777-54A0031 is terminating action to the repeat inspections in accordance with SB 777-54A0031. The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to SB 777-54A0031.
Boeing Fleet Team Digest (FTD) 777 FTD 54-11003 is related to this service bulletin.
Boeing Service Related Problem (SRP) 777-SRP-54-0137 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 27, 2014 777-54-0030 11 of 72 BOEING SERVICE BULLETIN 777-54-0030
D. Description Group 1:
Get access to the upper and lower aft fairing structure. Replace insulation blankets, drain sump, and velcro. Install new rub strips to seal depressor. Close access to the upper and lower aft fairing structure.
Group 2:
Get access to the upper and lower aft fairing structure. Replace insulation blankets and velcro. Install new rub strips to seal depressor. Close access to the upper and lower aft fairing structure.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones ZoneModel 434, 444777-200, 777-300 E. Compliance The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin.
No compliance time is given.
Boeing recommends this service bulletin be done to introduce improvements.
F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.
G. Manpower The table below shows an estimate of the task hours necessary to do this replacement for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour data if necessary. The estimate does not include lost time. These are some examples of lost time:
Time to adjust to the workplace Time to schedule the work Time to inspect the work Time to cure the materials Time to make the parts Time to find the tools.