TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a2cb973a26e6b3a7cd263f691001a8a301979cd400375f7c07248f9794d77c7e' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a2cb973a26e6b3a7cd263f691001a8a301979cd400375f7c07248f9794d77c7e' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 777 Service Bulletin Number: 777-78-0082 Original Issue: November 09, 2011 Revision 1: June 15, 2015 ATA System: 7831 SUBJECT: EXHAUST (Trent 800 Engines) - Thrust Reverser System - Thrust Reverser Aft Cowl Modification and Thermal Protection System Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2011 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 1 of 265
5.0
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 2 of 265 BOEING SERVICE BULLETIN 777-78-0082
BLANK PAGE
Table of Contents
Revision Transmittal Sheet7
S u m m a r y ..................................................... 1 1
1. PLANNING INFORMATION ........................................ 1 9 A . E f f e c t i v i t y ............................................... 1 9
1. Airplanes ............................................ 1 9 2 . S p a r e s A f f e c t e d ........................................ 2 2 B. Concurrent Requirements ...................................... 2 2 C. Reason ................................................ 2 3 D. Description .............................................. 2 7 E. Compliance .............................................. 2 9 F . A p p r o v a l ............................................... 3 4 G. Manpower .............................................. 3 5 H. Weight and Balance Changes .................................... 4 0 I. Electrical Load Data ......................................... 4 0 J . R e f e r e n c e s .............................................. 4 0
1. Existing Data: ......................................... 4 0
2. Data Supplied with this Service Bulletin: ........................... 4 1
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 4 2 K. Publications Affected ........................................ 4 2 L. Interchangeability and Intermixability of Parts ........................... 4 2 M. Software Accomplishment Summary ................................ 4 3
2. MATERIAL INFORMATION ........................................ 4 5 A. Material - Price and Availability ................................... 4 5 B. Industry Support Information .................................... 4 6 C. Parts Necessary for Each Airplane ................................. 4 6 1 . K i t s / P a r t s ............................................ 4 6
2. Parts and Materials Supplied by the Operator ........................ 5 5
3. Parts Modified and Reidentified ................................ 5 5
4. Parts Removed and Not Replaced .............................. 5 7 D. Parts Necessary to Change Spares ................................. 5 8 E. Special Tooling - Price and Availability ............................... 5 8 F. Special Tooling Necessary to do this Service Bulletin ....................... 5 8
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 5 9 A. GENERAL INFORMATION ..................................... 5 9 B. WORK INSTRUCTIONS ....................................... 6 1 FIGURE 1: LEFT THRUST REVERSER STIFFENER REMOVAL [Group 1, Configuration 3] ..... 8 2 FIGURE 2: LEFT THRUST REVERSER LOWER AFT COWL REMOVAL AND DISASSEMBLY [Group 1, Configuration 3] ......................................... 8 5 FIGURE 3: LEFT THRUST REVERSER UPPER AFT COWL REMOVAL AND DISASSEMBLY [Group 1, Configuration 3] ......................................... 8 8 FIGURE 4: RIGHT THRUST REVERSER STIFFENER REMOVAL [Group 1, Configuration 3] .... 9 1 FIGURE 5: RIGHT THRUST REVERSER LOWER AFT COWL REMOVAL AND DISASSEMBLY [Group 1, Configuration 3] ......................................... 9 4 FIGURE 6: RIGHT THRUST REVERSER UPPER AFT COWL REMOVAL AND DISASSEMBLY [Group 1, Configuration 3] ......................................... 9 7 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 3 of 265 BOEING SERVICE BULLETIN 777-78-0082
FIGURE 7: LEFT THRUST REVERSER LOWER AFT COWL MODIFICATION AND REASSEMBLY [Group 1, Configuration 3] ....................................... 1 0 0 FIGURE 8: LEFT THRUST REVERSER UPPER AFT COWL MODIFICATION AND REASSEMBLY [Group 1, Configuration 3] ....................................... 1 0 4 FIGURE 9: LEFT THRUST REVERSER LOWER STIFFENER INSTALLATION [Group 1, Configuration 3] ................................................. 1 1 0 FIGURE 10: LEFT THRUST REVERSER UPPER STIFFENER INSTALLATION [Group 1, Configuration 3] ................................................. 1 1 5 FIGURE 11: LEFT THRUST REVERSER AFT COWL DOUBLER ASSEMBLY INSTALLATION [Group 1, Configuration 3] ........................................ 1 1 9 FIGURE 12: RIGHT THRUST REVERSER LOWER AFT COWL MODIFICATION AND REASSEMBLY [Group 1, Configuration 3] ....................................... 1 2 6 FIGURE 13: RIGHT THRUST REVERSER UPPER AFT COWL MODIFICATION AND REASSEMBLY [Group 1, Configuration 3] ....................................... 1 3 0 FIGURE 14: RIGHT THRUST REVERSER LOWER STIFFENER INSTALLATION [Group 1, Configuration 3 ] ................................................ 1 3 6 FIGURE 15: RIGHT THRUST REVERSER UPPER STIFFENER INSTALLATION [Group 1, Configuration 3] ................................................. 1 4 1 FIGURE 16: RIGHT THRUST REVERSER AFT COWL DOUBLER ASSEMBLY INSTALLATION [Group 1, Configuration 3] ........................................ 1 4 5 FIGURE 17: LEFT THRUST REVERSER - INSULATION BLANKET INSTALLATION [Group 1, Configuration 3 ] ................................................ 1 5 2 FIGURE 18: RIGHT THRUST REVERSER - INSULATION BLANKET INSTALLATION [Group 1, Configuration 3 ] ................................................ 1 5 9 FIGURE 19: EEC WIRE BUNDLE INSPECTIONS [Group 1, Configuration 4-15] ............ 1 6 6 FIGURE 20: LEFT THRUST REVERSER LOWER AFT COWL FASTENER INSPECTION [Group 1, Configuration 4-5] ....................................... 1 7 1 FIGURE 21: LEFT THRUST REVERSER UPPER AFT COWL FASTENER INSPECTION [Group 1, Configuration 4-5] ....................................... 1 7 4 FIGURE 22: LEFT THRUST REVERSER LOWER AFT COWL BRACKET INSTALLATION [Group 1, Configuration 3-5] ....................................... 1 7 7 FIGURE 23: LEFT THRUST REVERSER UPPER STIFFENER FASTENER INSPECTION [Group 1, Configuration 4-5] ....................................... 1 8 0 FIGURE 24: RIGHT THRUST REVERSER LOWER AFT COWL FASTENER INSPECTION [Group 1, Configuration 4-5] ....................................... 1 8 3 FIGURE 25: RIGHT THRUST REVERSER UPPER AFT COWL FASTENER INSPECTION [Group 1, Configuration 4-5] ....................................... 1 8 6 FIGURE 26: RIGHT THRUST REVERSER LOWER AFT COWL BRACKET INSTALLATION [Group 1, Configuration 3-5] ....................................... 1 8 9 FIGURE 27: RIGHT THRUST REVERSER UPPER STIFFENER FASTENER INSPECTION [Group 1, Configuration 4-5] ....................................... 1 9 2 FIGURE 28: LEFT THRUST REVERSER - RECONTOURED INSULATION BLANKET INSTALLATION [Group 1, Configuration 4-6, 8] .................................... 1 9 5 FIGURE 29: RIGHT THRUST REVERSER - RECONTOURED INSULATION BLANKET INSTALLATION [Group 1, Configuration 4-6, 8] ................................ 1 9 9 FIGURE 30: LEFT T/R HALF SPLICE PLATE FASTENER HOLE DETAILED INSPECTION [Group 1, Configuration 3] ........................................ 2 0 3 FIGURE 31: RIGHT T/R HALF SPLICE PLATE FASTENER HOLE DETAILED INSPECTION [Group 1, Configuration 3] ........................................ 2 0 7 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 4 of 265 BOEING SERVICE BULLETIN 777-78-0082
FIGURE 32: LEFT SIDE HINGE BEAM AND LATCH BEAM NUTPLATE INSTALLATION [Group 1, Configuration 3] ........................................ 2 1 1 FIGURE 33: RIGHT SIDE HINGE BEAM AND LATCH BEAM NUTPLATE INSTALLATION [Group 1, Configuration 3] ........................................ 2 1 7 FIGURE 34: LEFT T/R HALF INNER WALL FORWARD EDGE INSPECTION AND TRIMMING [Group 1, Configuration 3] ........................................ 2 2 3 FIGURE 35: RIGHT T/R HALF INNER WALL FORWARD EDGE INSPECTION AND TRIMMING [Group 1, Configuration 3] ........................................ 2 2 7 FIGURE 36: LEFT T/R HALF SPLICE PLATE FASTENER INSTALLATION [Group 1, Configuration 3] . 231 FIGURE 37: RIGHT T/R HALF SPLICE PLATE FASTENER INSTALLATION [Group 1, Configuration 3] . 235 APPENDIX A: INSULATION BLANKET INSTALLATION SEQUENCE LEFT THRUST REVERSER . . . 239 APPENDIX B: INSULATION BLANKET INSTALLATION SEQUENCE RIGHT THRUST REVERSER . . 241 APPENDIX C: INNER WALL PANEL PLY BUILDUP AREAS ........................ 2 4 3 APPENDIX D: RE-IDENTIFICATION OF THRUST REVERSERS ..................... 2 4 8 APPENDIX E: TOOLING DIMENSIONS ................................... 2 5 0 APPENDIX F: NUTPLATE RETAINER FABRICATION ........................... 2 6 2 APPENDIX G: HOLES AND DRILLING - CONDITIONS, PROCEDURES, DEFINITIONS AND TOOLS . 263 APPENDIX H: RECONTOURED INSULATION BLANKET INTERCHANGEABILITY [Group 1, Configuration 6 - 1 5 ] .............................................. 2 6 5 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 5 of 265 BOEING SERVICE BULLETIN 777-78-0082
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 6 of 265 BOEING SERVICE BULLETIN 777-78-0082
BLANK PAGE
Commercial Airplanes 777 Service Bulletin Revision Transmittal SheetNumber: 777-78-0082Original Issue: November 09, 2011 Revision 1: June 15, 2015 ATA System: 7831 SUBJECT: EXHAUST (Trent 800 Engines) - Thrust Reverser System - Thrust Reverser Aft Cowl Modification and Thermal Protection System Change This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION More work is necessary on the airplane(s) changed in accordance with the original issue of this service bulletin.
Airplanes changed in accordance with the Original Issue of this service bulletin need to do a detailed inspection of the fasteners common to the inner wall and the aft cowl for sealant and correct fastener types, and replace the fasteners if found to be incorrect. Also, new brackets need to be installed on the lower aft cowl stiffener. To incorporate an Airworthiness Limitation (AWL), operators must update the airplane scheduled maintenance program. This work is identified in Work Package 5 for Group 1, Configuration 3-5 airplanes.
NOTE: In addition, as an option, operators of airplane(s) changed in accordance with the original issue of this service bulletin can choose to replace the T/R inner wall insulation blankets with new re-contoured insulation blankets on the upper and lower bifurcations to improve the clearance with engine components.
REASON FOR REVISION This revision is sent to incorporate changes found during validation and to install new recontoured insulation blankets.
These sections were changed:
1. In Summary, Background:
a. Paragraph was changed.
b. Planing data table was added.
2. In Summary, Action:
a. Paragraphs for Group 1, Configuration 4-15 were added.
b. Service History table was changed.
3. In Summary, Compliance, paragraph for Group 1, Configuration 4-15 was added.
4. In Summary, Manpower, manpower tables were changed.
5. In Summary, illustration was changed.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 7 of 265
6. In Section 1.A., Effectivity, Configuration table was changed.
7. In Section 1.B., Concurrent Requirements, table was changed.
8. In Section 1.D., Description, applicability for Group 1, Configuration 4-15 were added.
9. In Section 1.E., Compliance, compliance tables were changed.
10. In Section 1.F., Approval, paragraph was added.
11. In Section 1.G., Manpower, manpower tables were changed.
12. In Section 1.H., Weight and Balance Changes, weight and balance table was changed.
13. In Section 1.J., References:
a. References were added.
b. Supplied drawings were added.
14. In Section 1.K., Publications Affected, table was changed.
15. In Section 1.M., Software Accomplishment Summary, new section was added.
16. In Section 2.A., Material Price and Availability, new kits 005W3456-3/-4/-5/-6/-7/-8 were added.
17. In Section 2.C., Parts Necessary for Each Airplane, new tables for kits 005W3456-3/-4/-5/-6/-7/-8 were added.
18. In Section 3.A., General Information, Notes were added.
19. In Section 3.B., Work Instructions, Work Packages Parts, and Steps were changed.
a. Work Packages were changed.
b. Steps were changed.
20. In Figure 3, step table and illustrations were changed.
21. In Figure 6, step table and illustrations were changed.
22. In Figure 7, step table and illustrations were changed.
23. In Figure 8, step table and illustrations were changed.
24. In Figure 9, step table and illustrations were changed.
25. In Figure 10, step table and illustrations were changed.
26. In Figure 11, step table and illustrations were changed.
27. In Figure 12, step table and illustrations were changed.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 8 of 265 BOEING SERVICE BULLETIN 777-78-0082
28. In Figure 13, step table and illustrations were changed.
29. In Figure 14, step table and illustrations were changed.
30. In Figure 15, step table and illustrations were changed.
31. In Figure 16, step table and illustrations were changed.
32. In Figure 17, step table and illustrations were changed.
33. In Figure 18, step table and illustrations were changed.
34. In Figure 19, illustrations were changed and added.
35. New Figures 20-37 were added.
36. New APPENDIX D through APPENDIX H were added.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY November 09, 2011Original Issue:
June 15, 2015Revision 1:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 9 of 265 BOEING SERVICE BULLETIN 777-78-0082
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 10 of 265 BOEING SERVICE BULLETIN 777-78-0082
BLANK PAGE
Commercial Airplanes 777 Service Bulletin SummaryNumber: 777-78-0082Original Issue: November 09, 2011 Revision 1: June 15, 2015 ATA System: 7831 SUBJECT: EXHAUST (Trent 800 Engines) - Thrust Reverser System - Thrust Reverser Aft Cowl Modification and Thermal Protection System Change
CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND Accomplishment of this service bulletin will improve the thermal protection system (TPS) of the thrust reverser T/R. The current thermal protection system is not sufficient to prevent damage to the inner wall of the thrust reverser. Hot air permeation of the thrust reverser insulation blankets causes disbondments and delaminations in the inner wall and weakens the compression and drag link fittings. Extensive thermal degradation could cause structural pieces of the inner wall to separate from the T/R in flight. A separated piece of the T/R could cause damage to other airplane areas, or cause injury to persons on the ground. A separated T/R piece at departure could cause a runway excursion because of thrust asymmetry from forward thrust on a Refused Take Off (RTO).
Improvements to the TPS include:
1. Changed insulation blanket face sheet material to metal to better strength and resistance to fluid contamination.
2. Better blanket to blanket interface to prevent hot air permeation on the thrust reverser inner wall.
3. Decreased number of blankets to minimize the number of seams that could allow for hot air permeation to the inner wall.
4. Added cooling air to known hot areas of the thrust reverser inner wall, such as around the High Pressure Compressor, Stage 3 (HP3) ducts.
5. Dynamically cooled compression fittings to reduce the in-flight temperatures of the fittings.
6. Changed the upper number 1 compression fitting (Powered Door Opening System fitting) material from aluminum to titanium for improved strength.
7. Pressurized air introduced underneath the insulation blankets to prevent entry of hot zone 3 air.
8. Better seal between the insulation blankets and the HP3 land to prevent hot air permeation under the blankets.
9. Added insulation around the compression fittings to remove the requirement to apply sealant at the compression fitting penetrations.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 11 of 265
Eighteen 777 Rolls-Royce T/R events related to thermal damage of the T/R inner wall have occurred since 2003.
The events have included such things as Air Turn Backs (ATB), In Flight Shut Downs (IFSD), T/R inner wall panel collapse, engine fire loop messages, and T/R inner wall panel sections and parts have departed the airplane. No hull loss or personal injury has occurred from these events.
This service bulletin supplies instructions to replace the current T/R inner wall and install insulation blankets.
The new T/R inner wall will make it possible to install new insulation blankets. The new blankets will prevent hot air permeation to the T/R inner wall and decrease temperatures experienced by the inner wall during flight to prevent inner wall and fitting damage.
NOTE: Thrust Reverser halves modified by this service bulletin must be restricted for use on engines that have incorporated Boeing Service Bulletin 777-75A0002, Revision 1. Boeing recommends also restricting T/R halves modified in accordance with this Service Bulletin to engines that have incorporated Rolls-Royce Service Bulletin RB.211-75-G765 and RB.211-71-H824.
Boeing Service Related Problem (SRP) 777-SRP-78-0076 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.
ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedYesSpares Affected Paragraph 1.E., Compliance and Paragraph
1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin YesSpecial Tooling Required ACTION (PRR 61777-225) For Each T/R half:
Group 1, Configuration 1-2:
1. This TPS solution is not compatible with this configuration and these thrust reversers are addressed in Service Bulletin 777-78-0071.
Group 1, Configuration 3:
1. Remove the insulation blankets from the T/R half.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 09, 2011 777-78-0082Revision 1: June 15, 2015 12 of 265 BOEING SERVICE BULLETIN 777-78-0082