Service bulletin · Bombardier

No revision namedSB 350-24-003 · 12 pages · 943 KB

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2017-0481; AD 2017-17-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2017-0481 (document 0004) · AD 2017-17-13

Manufacturer
Bombardier
Type
Service Bulletin
Number
350-24-003

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 12

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2017-0481; AD 2017-17-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'ed646f3e7db570f4ed64bb129b93e2a7c5cd9737d72585ce687a946ecf0d24ba'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SPECIAL CHECK/MODIFICATION - PRIMARY DC-POWER SYSTEM - MODIFICATION

OF THE ROUTING OF THE AUXILIARY POWER UNIT (APU) GENERATOR POWER CABLES The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.

RECOMMENDED

SPECIFIED TIME COMPLIANCE

COMPLIANCE TIME within 24 months from the release of this Service Bulletin (Basic Issue) EFFECTIVITY: A/C Serial No. 20501 to 20635 MANPOWER: 1 man−hour. Additional man−hours can be required for repair. Refer toParagraph 1.F. for details.

CONTINUED AIRWORTHINESS (CAW)

FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO

TOOLING/GSE YES NO

PLANNING INFORMATION NOYES

DEDICATED SCHEDULE NOYES PREREQUISITE SERVICE BULLETINS: N/A NOTE: This Service Bulletin is expected to be the subject of an Airworthiness Directive which will make it necessary to implement this Service Bulletin.

To place an order for parts or kits, please call Bombardier Aerospace Parts Services at:

514−855−2999 or 1−866−538−1247

SERVICE BULLETIN SUMMARY www.cic.bombardier.com MODEL BD−100−1A10 (CH−350) ATA 24−31

ELECTRICAL POWER Basic Issue: Jul 27/2016 350−24−003 Page 1 of 1 This Service Bulletin is available at:

SPECIAL CHECK/MODIFICATION - PRIMARY DC-POWER SYSTEM - MODIFICATION

OF THE ROUTING OF THE AUXILIARY POWER UNIT (APU) GENERATOR POWER CABLES

1. PLANNING INFORMATION A. Effectivity BD−100−1A10 aircraft, Serial No. 20501 to 20635.

NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aerospace Service Bulletin(s).

Before you do this bulletin, examine all STC, STA or equivalent action changes to make sure that this bulletin can be completed.

B. Reason Low clearance between the APU generator power cables and a hydraulic line was found in the aft equipment bay on some aircraft in service. This can cause damage to the insulation of the wire, which can lead to a fault in the APU electrical system or arcing with the metallic hydraulic line. The arcing, if there is flammable fluid in the area, could cause a fire in the aft equipment area.

This Service Bulletin does an inspection of the APU generator power cables and the hydraulic line and modifies the clamp arrangement to give sufficient clearance between the APU generator power cables and the hydraulic lines.

C. Description This Service Bulletin gives instructions to:

− Get access to the aft equipment compartment,

SERVICE BULLETIN www.cic.bombardier.com MODEL BD−100−1A10 (CH−350) ATA 24−31

ELECTRICAL POWER Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.

This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.

 2016 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.

Basic Issue: Jul 27/2016 350−24−003 Page 1 of 9 This Service Bulletin is available at:

− Remove the clamps from the APU generator power cables, − Do an inspection of the APU generator power cables and the hydraulic line for damage, − Do a repair of the APU generator power cables and/or hydraulic line, if necessary, and − Install the APU generator power cables with a new clamps.

D. Compliance Recommended within 24 months from this Service Bulletin release date (Basic Issue).

E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.

NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.

2. The technical content of this Service Bulletin is accepted by EASA in accordance with established procedures.

F. Manpower NOTE: The man−hours given are to help you schedule the tasks given in this bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.

For more information related to the manpower, refer to SB 350−00−002.

0.25 man−hour is necessary to do this special check.

0.75 man−hour is necessary to do this modification.

If damage is found during this special check, to the APU power cable:

− Up to 1 man−hour is necessary if the recommendation of the SRPSA is to repair the APU power cable insulation.

− Up to 5 man−hours are necessary if the recommendation of the SRPSA is to replace the APU power cable.

If damage is found during the special check, to the hydraulic line (refer to SPM−MM 20−22−00−910−805 for repair descriptions):

− Up to 1 man−hour is necessary for a surface repair of the hydraulic tube.

− Up to 2 man−hours are necessary for a Type 1 repair of the hydraulic tube.

− Up to 2.5 man−hours are necessary for Type 2 repair of the hydraulic tube.

MODEL BD−100−1A10 (CH−350) Basic Issue: Jul 27/2016 350−24−003 Page 2 of 9

The labor required to do this Service Bulletin is at no cost if:

− the work is done during new aircraft warranty period, and − the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and − this Service Bulletin is scheduled in less than 24 months from its release date (Basic Issue).

G. Material − Cost and Availability No kit is necessary to do this special check/modification. For parts and material data, refer to Paragraph 3.

These parts are available at no cost if:

NOTE: These conditions also apply to the parts required for an SRPSA for the repair of damage found to the power cable or hydraulic line during the special check.

− ordered during new aircraft warranty period, and − a no−charge purchase order is sent to Bombardier Aerospace in less than 24 months, whichever comes first, from this Service Bulletin release date.

For those aircraft in new aircraft warranty at the time of Service Bulletin distribution, Smart Parts Plus does not pay for the parts at any time.

For those aircraft out of new aircraft warranty at the time of Service Bulletin distribution, Smart Parts Plus pays for the parts for up to 24 months from the Service Bulletin distribution date (Basic Issue).

H. Tooling The equipment and tools listed below are necessary to do this Special Check/Modification:

GSE REFERENCE NO. PART NO. DESCRIPTION − Commercially Available Torque Wrench NOTES: 1. Refer to the CH 350 Illustrated Tool and Equipment Manual (ITEM) to make sure that you use the correct equipment configuration.

2. Refer to the Liability Statement in the ITEM for acceptable GSE equivalents.

I. Weight and Balance No change.

J. Electrical Load Data No change.

MODEL BD−100−1A10 (CH−350) Basic Issue: Jul 27/2016 350−24−003 Page 3 of 9

K. References − Bombardier Aerospace, Modification Summary, BB100T010864, Rev. B.

− Bombardier Aerospace, Restriction and/or Special Instruction (RSI), C−100−000−24−0096, Rev. −−.

− Bombardier Aerospace, Kit Drawing K1000070340, Rev. −−.

− Bombardier Aerospace, Standard Practices Manual (SPM), Chapter 20.

− Bombardier Aerospace, SB 350−00−002, Service Bulletin Description and Policy.

− CH 350 Aircraft Maintenance Manual (AMM), Chapters 6, 24 and 52.

L. Other Publications Affected None.

M. Equivalent Service Bulletin For Challenger 300, use SB 100−24−028.

2. ACCOMPLISHMENT INSTRUCTIONS NOTE: All references made to zones, access panels and/or doors, are from the CH 350 AMM, Chapter 6.

A. Aircraft Setup

(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.

(2) Remove the electrical power from the aircraft. Refer to AMM 24−00−00−861−802.

(3) Open the aft equipment compartment door 182GL. Refer to AMM 52−41−00−010−801.

B. Special Check

(1) Remove the bolt, Part No. NAS1801−3−14, the spacer, Part No.

NAS43DD3−18FC, the washer, Part No. NAS1149D0332J, and the clamps, Part No. B0305090A9S04, B0305090A9S07, and B0305090A9S16, as shown in View B−B, Pre−Mod, of Kit Drawing K1000070340. Discard the bolt, the spacer and the clamps, and keep the washer. Refer to the Figure 1.

NOTE: Some aircraft can have a different configuration with two clamps.

Remove and discard all clamps and/or spacer and/or bolt and keep the washer.

MODEL BD−100−1A10 (CH−350) Basic Issue: Jul 27/2016 350−24−003 Page 4 of 9

(2) Do an inspection of the power cables SAD0001, SAD0002, and SAF0001 in the area of FS688.45 as follows. Refer to the Figure 1.

(a) Make sure that there is no damage to the insulation of the power cables.

(b) If there are signs of damages, send a Service Request for Product Support Action (SRPSA) and the necessary detail by e−mail at SRPSA@aero.bombardier.com.

NOTE: The SRPSA will be at no−charge for aircraft in−warranty.

(3) Do an inspection of the hydraulic line, Part No. 1005354244−007 in the area of FS688.45 as follows. Refer to Figure 1.

(a) Make sure that there is no damage to the hydraulic line.

(b) If there is damage to the hydraulic line, make sure it is not more than the limits. Refer to SPM−MM 20−22−00−910−805.

(c) If the damage is more than the limits, repair the damaged area of the hydraulic line. Refer to SPM−MM 20−22−00−910−805.

(4) Complete any repairs/replacement of the power cables and hydraulic line.

C. Modification

(1) Do the modification of the routing of the power cables as follow. Refer to Kit Drawing K1000070340.

(a) Install the new clamp, Part No. M85052/2−20 on the power cables SBM3553, SBX0001, SAD0001, SAD0002, and SAF0001.

(b) Install the clamp to the standoff with bolt, Part No. NAS1801−3−10 and washer, Part No. NAS1149D0332J. Make sure you have a minimum clearance of 0.5 in (12.5 mm) with the hydraulic line. Refer to Figure 1.

(c) Torque the bolt from 12 to 15 lbf in (1.36 to 1.69 Nm). Refer to SPM−MM 20−21−00−01.

D. Close−out

(1) Remove all tools, equipment and unwanted materials from the aircraft.

(2) Close the aft equipment compartment door 182GL. Refer to AMM 52−41−00−410−801.

E. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).

In an effort to improve the quality of our technical communications, we are requesting your feedback. Please take a moment to fill out our easy on−line Service Bulletin survey:

http://csefeedback.aero.bombardier.com MODEL BD−100−1A10 (CH−350) Basic Issue: Jul 27/2016 350−24−003 Page 5 of 9

3. MATERIAL INFORMATION A. Kits No kits required.

B. Parts The parts that follow are necessary to do this Service Bulletin and are available from Bombardier Aerospace Parts Services, Montreal:

NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION M85052/2−20 1 Clamp B0305090A9S04 B0305090A9S07 B0305090A9S16 Discard NAS1801−3−10 1 Bolt NAS1801−3−14 Discard NOTE: The part numbers for the items listed above are subject to change without revision to this Service Bulletin. In case of discrepancy between this list and any other list, the Illustrated Parts Catalog prevails and shall be used to determine the latest part number.

C. Material No material required.

D. Publications No publications required.

MODEL BD−100−1A10 (CH−350) Basic Issue: Jul 27/2016 350−24−003 Page 6 of 9

CSB2428_001 A A B FS688.45 FS707.15 B

FOULING AREA

APU GENERATOR

HYDRAULIC LINE

POWER CABLE PART NO.1005354244−007 MODEL BD−100−1A10 (CH−350) Inspection of the APU Generator Power Cables Figure 1 Basic Issue: Jul 27/2016 350−24−003 Page 7 of 9

K1000070340−S1−PL MODEL BD−100−1A10 (CH−350) K1000070340 − Kit − APU Power Feeders − Routing Change (Sheet 1 of 1, Rev. −−) Basic Issue: Jul 27/2016 350−24−003 Page 8 of 9

K1000070340−S1 K1000070340 − Kit − APU Power Feeders − Routing Changes (Sheet 1 of 1, Rev. −−) Basic Issue: Jul 27/2016 350−24−003 Page 9 of 9

350−24−003 Basic Jul 27/2016 SPECIAL CHECK/MODIFICATION − PRIMARY DC−POWER SYSTEM −

MODIFICATION OF THE ROUTING OF THE AUXILIARY POWER UNIT (APU) GENERATOR POWER CABLES In an effort to improve the quality of our technical communications, we are replacing the standard Service Bulletin Evaluation Form with an on−line Service Bulletin Survey and we are requesting your feedback. Please take a moment to fill out our easy on−line Service Bulletin survey at:

http://csefeedback.aero.bombardier.com

SERVICE BULLETIN EVALUATION FORM (Your ideas will help us provide better bulletins) SERVICE BULLETIN: ISSUE: DATED:

TITLE:

SERVICE BULLETIN INCORPORATION SHEET − "350−24−003" Upon completion of the Service Bulletin, please fill−in, fax to

(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com If your aircraft is registered on CAMP and you are reporting to them, please do not send the incorporation sheet to Bombardier. If your aircraft is on another tracking system, please contact Bombardier to make arrangements for automated data submission.

350−24−003 Basic

COMPLIED WITH

YES NO N/A Actual hours to accomplish Service Bulletin:

* NOTES:

Aircraft Serial No. Aircraft Reg. No.

Airframe Hours: Airframe Landings S.B. Incorporation Date Service Order No.

Facility incorporating S.B.

Name Signature Date

BOMBARDIER

SUBMISSION Service Bulletin Number Rev. * Parts Completed Remarks/Reason

1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A, B, C, D, etc.) which can be carried out separately, indicate only those parts completed at this time.

2. For repetitive checks (usually PART A) only the initial check should be reported unless otherwise stated in the Service Bulletin.

3. When more than one part is carried out at the same time, each part should be reported.

(dd/mm/yy) Signature not required if sent by E−Mail (dd/mm/yy)