On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD.
Text · 17
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2018-0965; AD 2019-07-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6002c27f11a3982a9507eb57b9fc1ad4897843b322872c2a224e66fc58c2319c' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6002c27f11a3982a9507eb57b9fc1ad4897843b322872c2a224e66fc58c2319c' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SPECIAL CHECK/MODIFICATION - MAIN-GEAR RETRACTION ACTUATOR -
INSPECTION AND REPLACEMENT IF NECESSARY OF THE MLG SIDE BRACE
ACTUATOR SPLIT BALL BEARING The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME Refer to Paragraph 1.D.
EFFECTIVITY: A/C Serial No. 20501 to 20665 MANPOWER: PART A: 0.5 man−hour, PART B: Up to 8 man−hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO
TOOLING/GSE YES NO PLANNING INFORMATION: See important information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO PREREQUISITE SERVICE BULLETINS: N/A NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make it necessary to implement this Service Bulletin.
To place an order for parts, please call Bombardier Aerospace Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL BD−100−1A10 (CH−350) ATA 32−32
LANDING GEAR Basic Issue: Dec 18/2017 350−32−006 Page 1 of 1 This Service Bulletin is available at:
SPECIAL CHECK/MODIFICATION - MAIN-GEAR RETRACTION ACTUATOR -
INSPECTION AND REPLACEMENT IF NECESSARY OF THE MLG SIDE BRACE
ACTUATOR SPLIT BALL BEARING
1. PLANNING INFORMATION NOTES:1 . Before you do this bulletin, examine all STC, STA or equivalent action changes to make sure that this bulletin can be completed.
2. This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.
For more information on dedicated schedules, refer to SB 350−00−002.
3. A completed Certificate of Scrap, for the removed split ball bearing, Part No. 104467672, must be submitted within six weeks of the incorporation of this Service Bulletin to Triumph Actuation Systems − Yakima.
Send a scanned copy of the completed Certificate of Scrap by e−mail to:
JLRoybal@triumphgroup.com and RFarabee@triumphgroup.com. Make sure to include the Part Number and the Serial Number of the top assembly in the subject line of the e−mail.
If the Certificate of Scrap is not received within six weeks of the incorporation of this Service Bulletin, the operator will be charged, by Triumph Actuation Systems − Yakima, for the replacement split ball bearing.
SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL BD−100−1A10 (CH−350) ATA 32−32
LANDING GEAR Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
2017 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 18/2017 350−32−006 Page 1 of 14 This Service Bulletin is available at:
A. Effectivity BD−100−1A10 aircraft, Serial No. 20501 to 20665.
NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aerospace Service Bulletin(s).
B. Reason Bombardier Aerospace was informed by its supplier that some MLG side stay actuators were supplied with a non conforming split ball bearing, Part No.
104467672. Material properties of the non conforming split ball bearing do not meet the requirements of AMS4640H.
This Service Bulletin introduces a Special Check/Modification, that gives instructions to verify the serial number of both side stay actuators installed on the aircraft, and replace any non conforming split ball bearing if necessary. The replacement of the discrepant split ball bearings will greatly reduce the risk of bearing seizure.The benefits to the customer are improved reliability and reduced maintenance costs.
C. Description This Service Bulletin gives instructions in PART A to:
− Verify the serial number of the LEFT and RIGHT side brace actuator, and − Take the appropriate action.
This Service Bulletin gives instructions in PART B to:
− Remove the existing discrepant split ball bearing, − Install a new split ball bearing, and − Do the necessary tests to make sure the system operates correctly.
D. Compliance Recommended at or before 3750 flight cycles (since new) or within 48 months from Service Bulletin release date (Basic Issue), whichever comes first.
NOTES: 1. For units with more than 3350 flight cycles (since new) at the time of Service Bulletin release date (Basic Issue), comply within 12 months or 400 flight cycles, whichever comes first.
2. If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 2 of 14
E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.
For more information related to the manpower, refer to SB 350−00−002.
2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.
0.5 man−hour is necessary to do PART A of this Special Check/Modification.
Bombardier Aerospace does not pay for the labor to do PART A of this Special Check/Modification.
Up to 8 man−hours are necessary to do PART B of this Special Check/Modification and are divided as follows:
− 2.5 man−hours per side, − 2 man−hours for the testing, and − 1 man−hour for the Close−Out.
The labor required to do PART B of this Special Check/Modification is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and − this Service Bulletin is scheduled before 3750 flight cycles (since new) or within 48 months from its release date (Basic Issue) whichever comes first.
NOTE: For units with more than 3350 flight cycles (since new) at the time of Service Bulletin release date (Basic Issue), schedule within 12 months or 400 flight cycles, whichever comes first.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 3 of 14
G. Material − Cost and Availability No kit is necessary to do PART B of this. For material data, refer to Paragraph 3.
For the part necessary to do PART B of this Special Check/Modification, refer to Paragraph 3.B.
This part is available at no cost if:
− a no−charge purchase order is sent to Bombardier Aerospace in less than 48 months from this Service Bulletin release date (Basic Issue).
NOTE: For units with more than 3350 flight cycles (since new) at the time of Service Bulletin release date (Basic Issue), purchase order must be sent within 12 months from this Service Bulletin release date (Basic Issue).
This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.
For more information on dedicated schedules, refer to SB 350−00−002.
A completed Certificate of Scrap, for the removed split ball bearing, Part No.
104467672, must be submitted within six weeks of the incorporation of this Service Bulletin to Triumph Actuation Systems − Yakima.
Send a scanned copy of the completed Certificate of Scrap by e−mail to:
JLRoybal@triumphgroup.com and RFarabee@triumphgroup.com. Make sure to include the Part Number and the Serial Number of the top assembly in the subject line of the e−mail.
If the Certificate of Scrap is not received within six weeks of the incorporation of this Service Bulletin, the operator will be charged, by Triumph Actuation Systems − Yakima, for the replacement split ball bearing.
For all parts transactions, Bombardier Aerospace’s current Spare Parts and Component Repair Price Catalogue General Terms and Conditions apply. These terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com During or after the above free period, Smart Parts Plus does not pay for the parts.
H. Tooling The equipment and tools listed below are necessary to do this Special Check/Modification:
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 4 of 14
GSE REFERENCE NO. PART NO. DESCRIPTION 07−10−01 − Pad, Jacking 07−10−02 − Jack, Tripod Wing 07−10−03 − Jack, Forward Fuse 07C−10−04 − Axle Jack, MLG/NLG 07C−10−06 − Support, Rear Fuselage 10−10−10 − Wheel Chocks, Rubber 12−20−03 − Strut Servicing Kit(Air/Nitrogen) 12−30−01 − Nitrogen Charging Adapter 24−00−24 S4933959−501 Tag, Circuit Breaker 29C−00−01 Hydraulic Power Unit Commercially Available − Gauge Digital, Nitrogen Pressure 938 to 3943−psi (6467 to 27186−kPa) Commercially Available − Wrench, Torque Refer to the Standard Practices Manual (SPM), Wiring Manual (WM), Chapter 20, and the table that follows for the tools applicable to the wiring modification:
NOTES: 1. Refer to the CH 350 Illustrated Tool and Equipment Manual (ITEM) to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for acceptable GSE equivalents.
I. Weight and Balance No change.
J. Electrical Load Data No change.
K. References − Bombardier Aerospace, Restriction and/or Special Instruction (RSI), C−100−000−32−0168, Rev. −−2.
− Bombardier Aerospace, Standard Practices Manual (SPM), Chapter 20.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 5 of 14
− Bombardier Aerospace, SB 100−00−02, Service Bulletin Description and Policy.
− Safran Landing Systems, Service Bulletin SB100−32−023 − Triumph Actuation Systems − Yakima, Service Bulletin 2−8554−32−1 − Triumph Actuation Systems − Yakima, Certificate of Scrap (attached).
− CH 350 Aircraft Maintenance Manual (AMM), Chapters 6, 7, 24, 29 and 32.
− CH 350 Illustrated Tool and Equipment Manual (ITEM), Chapters 7, 10 and 24.
L. Other Publications Affected None.
M. Equivalent Service Bulletin For the Challenger 300, refer to Service Bulletin 100−32−30.
2. ACCOMPLISHMENT INSTRUCTIONS NOTE: All references made to zones, access panels and/or doors, are from the CH 350 AMM, Chapter 6.
A. Aircraft Setup NOTE: The steps in the Aircraft Setup section of this Service Bulletin are recommended steps. The steps give a recommendation to get access to the work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator’s discretion.
(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.
(2) Obey all hydraulic safety precautions. Refer to AMM 29−00−00−910−801.
(3) Obey all hydraulic technical precautions. Refer to AMM 29−00−00−910−802.
(4) Obey all landing−gear safety precautions. Refer to AMM 32−00−00−910−801.
(5) Release the hydraulic pressure from the left and right hydraulic systems. Refer to AMM 29−10−00−862−802.
(6) Open and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE LCBP C13 WOW A/RET/EXT 211 LCBP C14 WOW B 211 RCBP C13 WOW B/RET 212 RCBP C14 WOW A/RET 212 MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 6 of 14
B. PART A − Special Check
(1) Examine the serial number of the LEFT and RIGHT MLG side brace actuator assembly, Part No. 2−8554−2, for applicability.
(2) If the serial number is not listed in Table 1, no further action is required.
(3) If the serial number is listed in Table 1, continue to Paragraph 2.C.
TABLE 1 - IMPACTED SERIAL NO.
0028, 0033 to 0051, 0053, 0055 to 0072, 0074 to 0077, 0079 to 0092, 0094 to 0097, 0099 to 0111, 0113, 0114, 0116 to 0144, 0147, 0148, 0151, 0152, 0154, 0156 to 0158, 0161, 0162, 0164 to 0174, 0176 to 0182, 0184 to 0187, 0189, 0190, 0192, 0196 to 0200, 0202, 0203, 0205, 0206, 0209 to 0219, 0224, 0226 to 0234, 0236 to 0238, 0240 to 0242, 0244 to 0247, 0249, 0250, 0252 to 0257, 0259 to 0262, 0264, 0265, 0267, 0268, 0270, 0271, 0273 to 0277, 0280 to 0283, 0320, 0322, 0323, 0339, 0342, 0343 and 0347 C. PART B− Modification − Replacement of the Split Ball Bearing NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.
(1) Lift the complete aircraft with jacks. Refer to AMM 07−10−01−582−801.
(2) Release the nitrogen pressure from the MLG strut and compress it enough to facilitate the removal and installation of the side brace pin assembly (11).
(3) Replace the split ball bearing as follows, refer to Figure 1:
(a) Remove and discard the cotter pin (1). Refer to SPM20−50−00−000−802.
(b) Remove and discard the nut (2).
(c) Remove and discard the washer (3).
(d) Move the bell crank (4) away from the side brace pin assembly (11).
(e) Remove and discard the countersunk washer (5).
(f) Remove and discard the tab lock washer (7) and the nut (6). Refer to SPM−MM 20−50−00−000−803.
NOTE: If installed, remove the lockwire between the nut (6) and the lock plate (8). Refer to SPM−MM 20−50−00−000−801.
(g) Support the MLG side brace actuator (10), per best shop practices.
(h) Remove the side brace pin assembly (11).
(i) Remove the split ball bearing (9) from the side brace actuator rod end assembly and scrap.
NOTE: Make sure you fill and submit the Certificat of Scrap. Refer to Paragraph 1.G.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 7 of 14
(j) Install new split ball bearing, Part No. 104467672 (9) in the side brace actuator rod end assembly. Make sure that the witness marks on the bearing faces are matched together.
(k) Apply a layer of grease on the side brace pin assembly (11).
(l) Install the side brace pin assembly (11) through the side brace actuator
(10) and the main fitting (12).
NOTE: Make sure the flat area on the side brace pin assembly (11) is aligned with the flat area in the lock plate (8).
(m) Install the new tab washer, Part No. 32228−1 (7).
NOTE: Make sure the tab is in the slot in the lock plate.
(n) Install the new nut, Part No. NAS509−18 (6).
(o) Tighten the new nut (6) by hand, and make sure the flat area on the side brace pin assembly (11) is aligned with the flat area in the lock plate (8).
Make sure the tab on the tab washer (7) stays in the slot in the lock plate
(8).
(p) Hold the head of the side brace pin assembly (11) in position to prevent rotation and forward −and−aft movement.
(q) Torque the new nut (6) from 83.34 to 100 lb ft (113 to 135.58 Nm). Refer to SPM−MM 20−21−00−910−801.
NOTE: Make sure that the tab washer (7) did not turn when you applied the torque.
(r) Bend the tabs of the tab washer (7) on the nut (6). Refer to SPM−MM 20−50−00−400−803.
(s) If previously removed, install lockwire between the nut (6) and the lock plate (8). Refer to SPM−MM 20−50−00−400−801.
(t) Install the new countersunk washer, Part No. MS20002C12 (5) on the side brace pin assembly (11).
(u) Move the bell crank (4) back in position on the side brace pin assembly (11).
(v) Install the new washer, Part No. NAS1149E0963P (3).
(w) Install the new nut, Part No. MS14145L9 (2).
(x) Torque the nut (2) from 60 to 100 lb in (6.78 to 11.30 Nm). Refer to SPM−MM 20−21−00−910−801.
(y) Install the new cotter pin, Part No. MS24665−304 (1). Refer to SPM−MM 20−50−00−400−802.
(4) Lubricate the spherical bearing and the bell crank. Refer to AMM 12−22−00−640−802.
(5) Identify the reworked Side Stay Actuator with the Service Bulletin identifier number (2−8554−32−1) with permanent ink per best shop practices. Refer to Figure 2.
(6) Apply one coat of polyurethane clear coat over the ink marking per best shop practices. Refer to Figure 2.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 8 of 14
(7) Do the Servicing of the MLG Shock−Strut with Nitrogen Only. Refer to AMM 12−17−00−614−803.
D. Testing
(1) Remove the tags and close the circuit breakers that follows:
CB PANEL CB NO. NAME ZONE LCBP C13 WOW A/RET/EXT 211 LCBP C14 WOW B 211 RCBP C13 WOW B/RET 212 RCBP C14 WOW A/RET 212
(2) Connect electrical power to the aircraft. Refer to AMM 24−00−00−861−801.
(3) Make sure that the landing−gear control handle is in the DOWN position.
(4) Set the throttle levers to the CLB position.
(5) Install aluminum tape on the radio altimeter receiver antenna.
(6) Make sure that the flaps are not at the 30 degree position. Refer to AMM 27−52−00−610−801.
(7) Make sure that the indication on the primary page of the engine indication and crew alerting system (EICAS) shows DN (Green).
(8) Remove the lockpin from the nose−landing−gear (NLG). Refer to AMM 10−11−00−941−801.
(9) Remove the lockpins from the main−landing−gear (MLG). Refer to AMM 10−11−00−941−803.
WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE NOT NEAR THE LANDING GEAR. EXTENSION/RETRACTION OF THE
LANDING GEAR CAN CAUSE INJURY TO PERSONS AND DAMAGE TO THE EQUIPMENT.
(10) Pressurize the Left and Right Hydraulic Systems. Refer to AMM 29−10−00−862−801.
(11) Do three retraction/extension cycles.
NOTE: Make sure that all the parts move freely.
(12) On the EICAS primary page, make sure that the message that follows is not shown:
EICAS NMESSAGE LEVEL (COLOR) GEAR DISAGREE Caution (amber) MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 9 of 14
(13) Do one landing−gear emergency−extension cycle as follows:
(a) Move the landing−gear control−handle to the UP position.
(b) When the landing gear is up and locked, make sure that the gear indication on the EICAS primary page shows UP (white).
(c) Release pressure from the Right hydraulic systems. Refer to AMM 29−10−00−862−802.
(d) Pull the landing−gear manual−release handle until the landing gears extend.
(e) Make sure that the NLG and MLG extend smoothly.
(f) Move the landing−gear control−handle to the DOWN position.
(g) Stow the landing−gear manual−release handle.
(14) Pressurize the Left and Right Hydraulic Systems. Refer to AMM 29−10−00−862−801.
(15) Do a final retraction/extension cycle.
(16) Release hydraulic pressure from the Left and Right hydraulic systems. Refer to AMM 29−10−00−862−802.
(17) Install the lockpin in the NLG, and make sure that it goes in freely. Refer to AMM 10−11−00−941−802.
(18) Install the lockpins in the MLG, and make sure that it goes in freely. Refer to AMM 10−11−00−941−804.
(19) Remove the electrical power from the aircraft. Refer to AMM 24−00−00−861−802.
E. Close−out NOTE: The steps in the Close−out section of this Service Bulletin, except for the return−to−service tests, are recommended steps. The steps give a recommendation to install components removed during the Aircraft Setup.
This recommendation is to make sure that the aircraft is safe and ready to return to service. Alternative steps can be used at the operator’s discretion.
(1) Remove all tools, equipment and unwanted materials from the aircraft.
(2) Lower the complete aircraft. Refer to AMM 07−10−01−586−801.
F. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 10 of 14
In an effort to improve the quality of our technical communications, we are requesting your feedback. Please take a moment to fill out our easy on−line Service Bulletin survey:
http://csefeedback.aero.bombardier.com
3. MATERIAL INFORMATION A. Kits No kits required.
B. Parts The part that follows is necessary to do this Service Bulletin and is available from Bombardier Aerospace Parts Services, Montreal:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION DMK378−101 Up to2 Kit, MessierDowty − − NOTE: The part number(s) for the item(s) listed above are/is subject to change without revision to this Service Bulletin. In case of discrepancy between this list and any other list, the Illustrated Parts Catalog prevails and shall be used to determine the latest part number.
C. Material The material that follows, or equivalent, is necessary to do this Service Bulletin. It can be purchased from a local supplier. Bombardier Aerospace does not pay for this consumable.
DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER (SEE NOTE) Clear Coat, Polyurethane CT: 4 hours PF−6 Series/PH36 or PG−6 Series As Necessary Code: A Grease, Aircraft and Instrument, Gear and Actuator Screw Aeroshell 33 MIL−PRF−23827CType I As Necessary Code: B MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 18/2017 350−32−006 Page 11 of 14