On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD.
Text · 13
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-1480; AD 2023-03-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd607e42a249493bf7531bd4bd035c43a25baccff8e85042cebf6aaaaa17dcb18' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd607e42a249493bf7531bd4bd035c43a25baccff8e85042cebf6aaaaa17dcb18' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SPECIAL CHECK/REWORK - FUSELAGE - REPLACEMENT OF THE AUXILIARY
POWER UNIT (APU) MUFFLER ELECTRICAL BONDING STRAP The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME Refer to Paragraph 1.D.
EFFECTIVITY: A/C Serial No. 20501 to 20916 MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN YES NO TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION NOYES
DEDICATED SCHEDULE NOYES PREREQUISITE SERVICE BULLETINS: N/A NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make it necessary to implement this Service Bulletin.
To place an order for parts or kits, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL BD−100−1A10 (CH−350) ATA 53−00
FUSELAGE Basic Issue: Dec 06/2021 350−53−004 Page 1 of 1 This Service Bulletin is available at:
SPECIAL CHECK/REWORK - FUSELAGE - REPLACEMENT OF THE AUXILIARY
POWER UNIT (APU) MUFFLER ELECTRICAL BONDING STRAP
1. PLANNING INFORMATION NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or equivalent action changes to make sure that this Service Bulletin can be completed.
A. Effectivity BD−100−1A10 aircraft, Serial No. 20501 to 20916.
NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aviation Service Bulletin(s).
B. Reason A few aircraft have been found to have cracks in the tailcone upper firewall where the APU muffler electrical bonding strap is attached. This can possibly cause a breach of the firewall, reduced lightning strike protection and increased radio interference.
This Service Bulletin introduces a special check/rework to replace the rigid electrical bonding strap with a flexible jumper cable assembly. The benefits to the operator are improved reliability/dispatchability/cost avoidance.
C. Description This Service Bulletin gives instructions in PART A, to:
− Inspect the tailcone upper firewall for cracks or other defects, and − If necessary, repair the tailcone upper firewall.
SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL BD−100−1A10 (CH−350) ATA 53−00
FUSELAGE Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
2021 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 06/2021 350−53−004 Page 1 of 10 This Service Bulletin is available at:
This Service Bulletin gives instructions in PART B, to:
− Remove the APU electrical bonding strap, − Install the new flexible APU muffler jumper cable assembly, and − Do the necessary tests to make sure that the system operates correctly.
This Service Bulletin gives instructions in PART C, to:
− Do the necessary repairs if cracks or other defects are found at the tailcone upper firewall, − Install the new flexible APU muffler jumper cable assembly, and − Do the necessary tests to make sure that the system operates correctly.
D. Compliance Recommended within 48 months of this Service Bulletin release date (Basic Issue).
NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the aircraft configuration, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.Standard SRPSA fees may apply. Refer to the Services section of the Bombardier customer portal for the latest prices, rates and fees.
E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU bilateral Aviation Safety Agreement.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 06/2021 350−53−004 Page 2 of 10
F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this Service Bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.
For more information related to the manpower, refer to SB 350−00−002.
2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at the next scheduled maintenance task or inspection (e.g. 48 month or 96 month inspection, etc.). Therefore no man−hours are allotted to prepare the aircraft for maintenance or to prepare for this Service Bulletin.
Up to 1 man−hour is necessary to do Part A and Part B of this Special Check/Rework.
Up to 24 man−hours are necessary to do Part C of this Special Check/Rework.
Bombardier Aerospace does not pay for the labour required to do Part A and Part B of this Special Check/Rework.
Bombardier Aerospace pays a maximum of 16 man−hours labour required to do Part C of this Special Check/Rework if:
(1) The aircraft is in new aircraft warranty, and
(2) The work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and
(3) This Service Bulletin is scheduled in less than 48 months from its release date (Basic Issue).
G. Material − Cost and Availability KIT NO. PRICE 100K53−35 Please contact Bombardier Aviation Parts Services, in Montreal, for delivery lead times and confirmation of prices.
This kit is available at no cost if:
− ordered during new aircraft warranty period, and MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 06/2021 350−53−004 Page 3 of 10
− a no−charge purchase order is sent to Bombardier Aviation in less than 48 months, from this Service Bulletin release date (Basic Issue).
Distribution Centre Frankfurt − Core Returns Bombardier Aviation Germany Gmb H Hans−Boeckler−Strasse 9 GROSS−GERAU Hesse 64521 Germany For all parts transactions, Bombardier Aviation’s current Spare Parts and Component Repair Price Catalogue General Terms and Conditions apply. These terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com During or after the above free period, Smart Parts Plus does not pay for the kits.
H. Tooling The equipment and tools listed below are necessary to do this Special Check/Rework:
GSE REFERENCE NO. PART NO. DESCRIPTION 20X−00−04 M1−G−Kit Portable Bonding Tester 24−00−24 S4933959−501 Tag, Circuit Breaker 49C−00−01 (for PART C) − APU Fishpole Hoist 49C−00−02 (for PART C) − Protective Sleeve 49C−00−03 (for PART C) − APU Stand and Adapter Commercially Available − Flashlight Commercially Available − Magnifying Glass (10xminimum) Commercially Available − Torque, Wrench 150 to200 lbf in (15 to 25 Nm) NOTES: 1. Refer to the BD−100 Illustrated Tool and Equipment Manual (ITEM) to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for acceptable GSE equivalents.
I. Weight and Balance No change.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 06/2021 350−53−004 Page 4 of 10
J. Electrical Load Data No change.
K. References − Bombardier Aviation, Modification Summary BB100T011103, Rev. B.
− Bombardier Aviation, Kit Drawing K1000070318, Rev. −−.
− CH 350 Aircraft Maintenance Manual (AMM), Chapter 6, 10, 24, 28, 49 and 52.
− CH 350 Structural Repair Manual (SRM), Chapter 51 and 53.
− Bombardier Aerospace, SB 350−00−002, Service Bulletin Description and Policy.
− TCCA Airworthiness Directive (pending) L. Other Publications Affected − CH 350 Aircraft Illustrated Parts Catalog (AIPC), Chapter 49.
M. Equivalent Service Bulletins For the Challenger 300 aircraft, use SB 100−53−35.
2. ACCOMPLISHMENT INSTRUCTIONS NOTE: All references made to zones, access panels and/or doors, are from the CH 300 AMM, Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.
(2) Open and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE LCBP B8 APU PRI 211 RCBP B8 APU SEC 212
(3) Remove APU access panel (320AB). Refer to AMM 52−43−01−000−801.
B. PART A − Special Check − Inspection of the Tail Cone Upper Firewall NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 06/2021 350−53−004 Page 5 of 10
(1) With a flashlight and a magnifying glass (10x, minimum), do a detailed visual inspection of the upper firewall for cracks and any other defects especially around the APU muffler electrical bonding strap clip. Make sure that the lighting and magnification is sufficient to see even the smallest cracks or defects. Refer to Kit Drawing K1000070318.
(a) If no cracks or other defects are found, do PART B of this Service Bulletin.
(b) If cracks or other defects are found, do Part C of this Service Bulletin.
C. PART B − Rework − Installation of the Flexible Jumper Cable Assembly
(1) Remove and discard nut Part No. MS21043−6, spring washer Part No.
MS35338−160 and washer Part No. NAS1587−6 from the APU exhaust muffler.
(2) Remove and discard the nut Part No. MS21043−6, spring washer Part No.
MS35338−160, washer Part No. NAS1587−6, bolt Part No. AS21715 and bonding strap Part No. 1004984050 from the upper firewall clip.
(3) Install the jumper cable assembly Part No. M83413/8−H012NN on the upper firewall clip as follows:
(a) Install screw Part No. MS35207−311, two washers Part No.
NAS1149D0632J, spring washer Part No. MS35338−46 and nut Part No.
MS35650−3382. Torque the nut 160 to 190 lbf in (18.08 to 21.46 Nm).
(b) Install the jumper cable assembly Part No. M83413/8−H012NN, washer Part No. NAS1149D0632J, spring washer Part No. MS35338−46 and nut Part No. MS35650−3382. Torque the nut 160 to 190 lbf in (18.08 to
21.46 Nm).
(4) Attach the jumper cable assembly to the APU exhaust muffler with washer Part No. NAS1587−6, spring washer Part No. MS35338−160 and nut Part No.
MS21043−6. Torque the nut 160 to 190 lbf in (18.08 to 21.46 Nm).
(5) Do the electrical bonding test of the APU muffler between the APU muffler and the upper firewall. Refer to SPMM51−80−00−760−801.
NOTE: Make sure that the resistance value is not more than 0.010 ohm.
D. PART C − Repair − Repair of the Tail Cone Upper Firewall
(1) If any cracks are found around the APU muffler electrical bonding strap clip in PART A, Inspection, before you do PART B, submit an SRPSA with photographs for repair disposition by email to:
SRPSA@aero.bombardier.com
(2) If any other defects are found in the upper firewall in Part A, Inspection, before you do Part B, contact Bombardier Aircraft, Customer Support for repair disposition.
(3) Remove the APU. Refer to AMM 52−43−09−000−801.
(4) When all the repairs have been completed, do PART B of this Service Bulletin.
(5) Install the APU. Refer to AMM 52−43−09−400−801.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 06/2021 350−53−004 Page 6 of 10
E. Close−out
(1) Close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE LCBP B8 APU PRI 211 RCBP B8 APU SEC 212
(2) Install the APU access panel (320AB). Refer to AMM 52−43−01−400−801.
(3) Remove all tools, equipment and unwanted materials from the aircraft.
F. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).
For information, correction(s), comments(s) and/or feedback regarding Service Bulletins released on the Customer Portal, please contact the Service Bulletin Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION A. Kits Kit 100K53−35 is necessary to do PART B and contains the parts that follow:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION M83413/ 8−H012NN 1 Jumper Cable Assembly 1004984050 Discard MS21043−6 1 Nut, SelfLocking MS21043−6 Discard MS35207−311 1 Screw, Machine, Pan Head AS21715 Discard MS35338−46 2 Washer,Spring MS35338−160 Discard MS35338−160 1 Washer,Spring MS35338−160 Discard MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 06/2021 350−53−004 Page 7 of 10
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION MS35650−3382 2 Nut, Hex MS21043−6 Discard NAS1587−6 1 Washer NAS1587−6 Discard NAS1149D0632J 3 Washer, Flat NAS1587−6 Discard NOTES: 1. In case of discrepancy between this list and the Service Bulletin Kit Parts List contained in the respective kit, then the later list prevails.
2. The actual quantity for some of the hardware contained in the kit can be greater than the amount shown in the table as these items are supplied in prepackaged quantities.
B. Parts No parts required.
C. Material No materials required.
D. Publications No publications required.
MODEL BD−100−1A10 (CH−350) Basic Issue: Dec 06/2021 350−53−004 Page 8 of 10
SB350−53−004−70318−NC−S1−PL MODEL BD−100−1A10 (CH−350) PL K1000070318 − Kit − Bonding Jumper Upgrade, APU Muffler (Sheet 1 of 1, Rev. ) Basic Issue: Dec 06/2021 350−53−004 Page 9 of 10
SB350−53−004−70318−NC−S1 Kit − Bonding Jumper Upgrade, APU Muffler Basic Issue: Dec 06/2021 350−53−004 Page 10 of 10
350−53−004 Basic Dec 06/2021 SPECIAL CHECK/REWORK − FUSELAGE − REPLACEMENT OF THE
AUXILIARY POWER UNIT (APU) MUFFLER ELECTRICAL BONDING STRAP bbad_SBgroup@aero.bombardier.com NOTE: Please use Salesforce only for troubleshooting issues or when Engineering deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM (Your ideas will help us provide better bulletins) SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service Bulletins released on the Customer Portal, please contact the Service Bulletin Group at the following email address: