On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Text · 12
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0603; AD 2022-20-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'db25b5c9f7e22a1edc09f9466214e3c1a8dd60b1a1eac14b35e0b6b7b548cdb0' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'db25b5c9f7e22a1edc09f9466214e3c1a8dd60b1a1eac14b35e0b6b7b548cdb0' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SPECIAL CHECK/MODIFICATION – RUDDER CONTROL SYSTEM –
INSPECTION OF RUDDER LOAD LIMITER The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME Refer to Paragraph 1.D.
EFFECTIVITY: A/C Serial No. 5701 to 5988 MANPOWER: Refer to Paragraph 1.F.
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO
TOOLING/GSE YES NO PLANNING INFORMATION: See important information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE NOYES PREREQUISITE SERVICE BULLETINS: N/A NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make it necessary to implement this Service Bulletin.
To place an order for parts, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 27−21
FLIGHT CONTROLS Basic Issue: Dec 07/2020 605−27−010 Page 1 of 1 This Service Bulletin is available at:
SPECIAL CHECK/MODIFICATION – RUDDER CONTROL SYSTEM –
INSPECTION OF RUDDER LOAD LIMITER
1. PLANNING INFORMATION NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or equivalent action changes to make sure that this Service Bulletin can be completed.
2. AMM 27−21−34−400−801 Revision 57 is a prerequisite and must be incorporated into the AMM before doing inspection of rudder PCU load limiter for correct crimping.
A. Effectivity CL−600−2B16 aircraft, Serial No. 5701 to 5988.
NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aviation Service Bulletin(s).
B. Reason Objective/Benefit:
The Service Bulletin introduces a periodic test to detect and replace possible defective load limiters in conjunction with an existing 800 FH CMR task and perform one−time visual inspection in conjunction with an existing 3200 FH CMR of rudder PCU load limiters for correct crimping.
C. Description This Service Bulletin gives instructions in PART A to:
− Do the temporary periodic test of the rudder PCU load limiters, and
SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 27−21
FLIGHT CONTROLS Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
2020 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 07/2020 605−27−010 Page 1 of 9 This Service Bulletin is available at:
− If the test produces at least one failed condition, do PART B of this Service Bulletin.
This Service Bulletin gives instructions in PART B to:
− Do the visual inspection of nut and end cap of the rudder PCU load limiter for correct crimping, and − If the nut and end cap of the rudder PCU load limiter are not crimped properly, do PART C of this Service Bulletin.
This Service Bulletin gives instructions in PART C to:
− Replace the rudder PCU load limiter.
After PART B and/or PART C, as applicable:
− Do the applicable test(s) as required per AMM.
D. Compliance
SB PART & ACTION INITIAL ACTION INSTRUCTION PART A Periodic Testing Within 1000 FH from this SB release (Basic Issue) Recommended in conjunction with TLMC 5−10−40 (27−21−00−101) Repeat every 800 FH until one−time visual inspection is performed PART B One−time Visual Inspection Within 3400 FH from this SB release (Basic Issue) Recommended in conjunction with TLMC 5−10−40 (27−23−00−101) − E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU bilateral Aviation Safety Agreement.
MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 2 of 9
F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this Service Bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.
For more information related to the manpower, refer to SB 605−00−002.
2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.
1 man−hour is necessary to do PART A of this Service Bulletin.
1 man−hour is necessary to do PART B of this Service Bulletin.
10 man−hours are necessary to do PART C of this Service Bulletin.
For PART A and PART B, Bombardier Aviation does not pay for the labor to do this special check.
The labor required to do PART C of this Service Bulletin is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and − this Service Bulletin is scheduled in less than 12 months from its release date (Basic Issue).
G. Material − Cost and Availability No kit is necessary to do this Service Bulletin.
The parts in Paragraph 3.B may be necessary to do this Service Bulletin.
The parts are available at no cost if a no−charge purchase order is sent to Bombardier Aviation in less than 12 months from this Service Bulletin release date (Basic Issue).
For all parts transactions, Bombardier Aviation’s current Spare Parts and Component Repair Price Catalogue General Terms and Conditions apply. These terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com Smart Parts pays for the parts listed in Paragraph 3.B only if replacement is required.
MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 3 of 9
H. Tooling The equipment and tools listed below are necessary to do this Service Bulletin:
GSE REFERENCE NO. PART NO. DESCRIPTION 24−00−24 − Circuit Breaker Tag − Red (Optional) 27−00−02 − Kit − Rigging Pins Commercially Available − Wrench, Torque 25 to 30 lbf in (2.83to 3.38 Nm) NOTES: 1. Refer to the CL−605 Illustrated Tool and Equipment Manual (ITEM) to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the CL –605, for acceptable GSE equivalents.
3. This list is provided for quick reference. In case of discrepancy between this list and the tools called in the SPM, WM, Chapter 20, then the tools called in the SPM−WM prevail. Other approved alternative tools are acceptable and can also be used.
I. Weight and Balance No change.
J. Electrical Load Data No change.
K. References − TCCA Airworthiness Directive (Pending).
− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−4265, Rev. −−.
− CL−605 Aircraft Maintenance Manual (AMM), Chapters 6, 12, 24, 27 and 55.
− CL−605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 27.
L. Other Publications Affected None.
M. Equivalent Service Bulletins − For the Challenger 600 aircraft, use Service Bulletin 600−0776.
− For the Challenger 601 aircraft, use Service Bulletin 601−0648.
− For the Challenger 604 aircraft, use Service Bulletin 604−27−039.
− For the Challenger 650 aircraft, use Service Bulletin 650−27−003.
MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 4 of 9
2. ACCOMPLISHMENT INSTRUCTIONS NOTES: 1. All TASKs given in the procedures that follow are from the CL−605 Aircraft Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the CL−605 Aircraft Maintenance Manual (AMM), Chapter 6.
A. Aircraft Setup NOTE: The steps in the Aircraft Setup section of this Service Bulletin are recommended steps. The steps give a recommendation to get access to work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator’s discretion.
(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.
(2) Obey all the flight control safety precautions. Refer to AMM 27−00−00−910−801.
(3) Install the warning tags on the pilot and copilot rudder pedals and on the AIL/RUD TRIM control panel.
(4) Open and tag the circuit breakers that follow:
LOCATION CB NUMBER CB NAME ZONE CBP−1 B8 HYD PUMP 3B 221 CBP−1 B11 HYD PUMP 2B 221 CBP−2 A2 HYD PUMP 3A 222 CBP−2 A5 HYD PUMP 1B 222 B. PART A — Special Check — Temporary Periodic Testing of the Rudder PCU Load Limiters — Initial inspection to be carried out within 1000 FH from this Service Bulletin release date (Repeat inspection(s) to be carried out at 800 FH) NOTES: 1. If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.
2. This test can be done in conjunction with TLMC Task Functional Test of the Rudder Backlash. Refer to TLMC 5−10−40 (Chapter 5 Task No. 27−21−00−101 – Functional Test of the Rudder Backlash, refer to AMM 27−21−00−720−805).
MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 5 of 9
(1) Pressurize the hydraulic systems No. 1. Refer to AMM 12−00−04−862−801.
NOTES: 1. Ensure there is no residual pressure in the other two hydraulic systems.
2. To release hydraulic pressure − systems No. 1 and No. 2, refer to AMM 12−00−04−862−802.
3. To release hydraulic pressure − system No. 3, refer to AMM 12−00−04−862−804.
(a) Trim rudder surface full trailing edge to right.
(b) Record the rudder angle Trim Position (TP) as indicated by the MDC in the below table.
NOTE: Make sure that Right Rudder trim is within 8.8°±0.5°.
(c) Push pilot left pedal to hit mechanical stop to move rudder trailing edge to left.
(d) Record Rudder Position (RP) as indicated on the MDC in the below table (Trial 1).
(e) Release rudder pedal back to zero degrees and repeat pilot left rudder pedal push to stop (step d).
(f) Record RP as indicated on the MDC in the below table (Trial 2).
(g) Perform steps (a) through (f) for each of the other Hydraulic systems No. 2 and No. 3 in turn. Record values in the table below.
LOAD LIMITER TEST Hydraulic System MDC Trim Position (TP) MDC Rudder Position (RP) Trial 1 2 1 2 3 NOTE: For a load limiter to be acceptable, the lowest of the two RP measurements must be larger than (24 minus TP reading).
MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 6 of 9
(2) If step 1 produces a pass condition for all three Rudder Load Limiters, no further action is required until:
(a) The next scheduled temporary periodic testing (800 FH) as given above in step 1 (a) through (g) shall be done at the same interval and in conjunction with TLMC 5−10−40 (Chapter 5 Task No. 27−21−00−101 – Functional Test of the Rudder Backlash, refer to AMM 27−21−00−720−805).
(b) The one−time visual inspection given in PART B must be carried out within 3400 FH from this Service Bulletin release date. It can be done in conjunction with TLMC 5−10−40 (Chapter 5 Task No. 27−23−00−101 – Operational test of the PCU load limiters. Refer to AMM 27−21−25−710−801).
(3) If step 1 produces a failed condition for any one of the three load limiters, do PART B of this Service Bulletin prior to the next flight.
C. PART B — Special Check — One−time Visual Inspection of the Rudder PCU Load Limiters — The one−time visual Inspection must be carried out at the next scheduled 3400 FH from this Service Bulletin release date. If the nut and end cap of the rudder PCU load limiter is not crimped properly, replace the load limiter prior to the next flight NOTES: 1. If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.
2. The visual inspection can be done in conjunction with TLMC 5−10−40 (Chapter 5 Task No. 27−23−00−101 – Operational test of the PCU load limiters, refer to AMM 27−21−25−710−801).
3. When the one−time visual inspection in PART B is carried out, the next temporary periodic test as per PART A is no longer required.
(1) Do the visual inspection of the rudder PCU load limiter Part No. 600−91302−43 and 600−91302−53 for correct crimping. Refer to AMM 27−21−34−400−801.
NOTE: Make sure that the nut and end cap are properly crimped.
(2) If the nut and end cap of the rudder PCU load limiter Part No. 600−91302−43 and 600−91302−53 are not crimped properly, do PART C of this Service Bulletin, prior to the next flight.
(3) If the nut and end cap of the rudder PCU load limiter Part No. 600−91302−43 and 600−91302−53 are crimped properly, go to Paragraph 2.E (Close−out).
NOTE: If you have disturbed the rudder system then do the required testing as given in the AMM.
MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 7 of 9
D. PART C — Modification — Replacement of the Rudder PCU Load Limiter(s) NOTES: 1. If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.
2. AMM 27−21−34−400−801 Revision 57 is a prerequisite and must be incorporated into the AMM before installing a new PCU load limiter.
(1) Remove the rudder PCU load limiter Part No. 600−91302−43 and/or 600−91302−53. Refer to AMM 27−21−34−000−801.
(2) Install the new rudder PCU load limiter Part No. 600−91302−43 and/or 600−91302−53. Refer to AMM 27−21−34−400−801.
E. Close Out NOTE: The steps in the Close−out section of this Service Bulletin, except for the return−to−service tests, are recommended steps. The steps give a recommendation to install components removed during the Aircraft Setup.
This recommendation is to make sure that the aircraft is safe and ready to return to service. Alternative steps can be used at the operator’s discretion.
(1) Remove the tags and close the circuit breakers that follow:
LOCATION CB NUMBER CB NAME ZONE CBP−1 B8 HYD PUMP 3B 221 CBP−1 B11 HYD PUMP 2B 221 CBP−2 A2 HYD PUMP 3A 222 CBP−2 A5 HYD PUMP 1B 222
(2) Remove all tools, equipment and other unwanted material from the aircraft.
(3) Remove the warning tags from the pilot and copilot rudder pedals and from the AIL/RUD TRIM control panel.
F. Recording You can do each PART of this Service Bulletin independently. When any PART of this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service Bulletins released on the Customer Portal, please contact the Service Bulletin Group at the following email address:
bbad_SBgroup@aero.bombardier.com MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 8 of 9
3. MATERIAL INFORMATION A. Kit No kits required.
B. Parts The parts that follow may be necessary to do this Service Bulletin and are available from Bombardier Aviation Parts Services, Montreal:
NEW PART NO. QTY ITEM USEDPART NO. INSTRUCTIONS -DISPOSITION 600−91302−43 1 Load Limiter − − 600−91302−53 2 Bungee, LoadLimiter − − NOTE: The part number for the item listed above is subject to change without revision to this Service Bulletin. In case of discrepancy between this list and any other list, the Illustrated Parts Catalog prevails and shall be used to determine the latest part number.
C. Material No materials required.
D. Publications No publications required.
MODEL CL−600−2B16 Basic Issue: Dec 07/2020 605−27−010 Page 9 of 9
605−27−010 Basic Dec 07/2020 SPECIAL CHECK/MODIFICATION – RUDDER CONTROL SYSTEM –
INSPECTION OF RUDDER LOAD LIMITER bbad_SBgroup@aero.bombardier.com NOTE: Please use Salesforce only for troubleshooting issues or when Engineering deviation is necessary to accomplish the Service Bulletin modification.
SERVICE BULLETIN EVALUATION FORM (Your ideas will help us provide better bulletins) SERVICE BULLETIN: ISSUE: DATED:
TITLE:
For any information, correction(s), comment(s) and/or feedback regarding Service Bulletins released on the Customer Portal, please contact the Service Bulletin Group at the following email address:
SERVICE BULLETIN INCORPORATION SHEET − "605−27−010" Upon completion of the Service Bulletin, please fill−in, fax to
(514) 855−8798 or e−mail to Fracas at fracas.montreal@aero.bombardier.com If you’re reporting Service Bulletin (SB) Incorporations to CAMP, sending this Incorporation Sheet to Bombardier is not mandatory. If your aircraft is on another tracking system, please contact Bombardier to make arrangements for automated data submission.
605−27−010 Basic
COMPLIED WITH
YES NO N/A PART A PART B PART C Actual hours to accomplish Service Bulletin:
* NOTES:
Aircraft Serial No. Aircraft Reg. No.
Airframe Hours: Airframe Landings S.B. Incorporation Date Service Order No.
Facility incorporating S.B.
Name Signature Date
BOMBARDIER
SUBMISSION Service Bulletin Number Rev. * Parts Completed Remarks/Reason (Mandatory if N/A)
1. Where the Service Bulletin is divided into a number of parts (e.g., PARTS A, B, C, D, etc.) which can be carried out separately, indicate only those parts completed at this time.
2. For repetitive checks (usually PART A) only the initial check should be reported unless otherwise stated in the Service Bulletin.
3. When more than one part is carried out at the same time, each part should be reported.
4. Fill in ’Remark/Reason’ to explain compliance method when N/A is selected.(E.g. Part not installed, N/A by effectivity, N/A by Part Serial Number, etc.
5. PCW means ’Previously Complied With’.
(dd/mm/yy) Signature not required if sent by E−Mail (dd/mm/yy)