Service bulletin · Bombardier

No revision named605-28-012 Basic · 28 pages · 3.0 MB

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0725; AD 2021-26-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0725 (document 0006) · AD 2021-26-23

Manufacturer
Bombardier
Type
Service Bulletin
Number
605-28-012

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 28Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0725; AD 2021-26-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '9c88d16a1f2ece884f344e900544b3a9ddeac99640e753d248b6a12b1a5e8244'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

MODIFICATION – FUEL SYSTEM –

ENGINE AND APU FUEL BOOST PUMP SEALING IMPROVEMENT The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.

RECOMMENDED

SPECIFIED TIME COMPLIANCE

COMPLIANCE TIME Within 5 years from Service Bulletin release (Basic Issue) EFFECTIVITY: A/C Serial No 5701 to 5988 MANPOWER: Refer to Paragraph 1.F

CONTINUED AIRWORTHINESS (CAW)

FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO

TOOLING/GSE YES NO PLANNING INFORMATION: See important information at the start of Paragraph 1. YES NO

DEDICATED SCHEDULE YES NO PREREQUISITE SERVICE BULLETINS: N/A NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make it necessary to implement this Service Bulletin.

To place an order for parts or kits, please call Bombardier Aviation Parts Services at:

514−855−2999 or 1−866−538−1247

SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 28−00 FUEL Basic Issue: Jun 16/2020 605−28−012 Page 1 of 1 This Service Bulletin is available at:

MODIFICATION – FUEL SYSTEM –

ENGINE AND APU FUEL BOOST PUMP SEALING IMPROVEMENT

1. PLANNING INFORMATION NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or equivalent action changes to make sure that this Service Bulletin can be completed.

2. This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.

For more information on dedicated schedules, refer to Service Bulletin 605−00−002.

A. Effectivity CL−600−2B16 aircraft, Serial No. 5701 to 5988.

NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aviation Service Bulletin(s).

B. Reason Evidence:

SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 28−00 FUEL Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.

This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.

 2020 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.

Basic Issue: Jun 16/2020 605−28−012 Page 1 of 25 This Service Bulletin is available at:

There were reports on several electric fuel boost pump (fuel boost pump) leakages that were found during inspection in service and production aircraft. Fuel leakage at the APU and engine electric fuel boost pump wiring harness conduit were located on the front spar and in the connector cavity of the boost pump. The fuel leakage is caused either by low pinch of the o−ring at the cartridge connector location, the same O−ring rolling onto itself during insertion or by a protective sleeve interference at the connector harness conduit B−nut interface with the boost pump canister.

Objective/Benefit:

The Service Bulletin gives instructions to replace the existing O−rings with the new O−rings and a custom made O−ring on the cartridges. Removal of the protective sleeve on each of the connector harness assemblies or replacement of the damaged connector harness assemblies in the canister.

C. Description This Service Bulletin gives instructions in PART A, to inspect the fuel boost pump canister (601R62181−1):

− Get access to the LH engine fuel boost pump, RH engine fuel boost pump and the APU fuel boost pump canisters, − Remove and discard the protective sleeve from the connector harness assy and remove sealant (if applicable) from the cover of the connector cavity. Inspect the connector harness assy for damage after sleeve removal and sealant removal (if applicable), and − Replace the O−ring, Part No. MS29513−027, on the cover of the connector cavity after sleeve removal, sealant removal (if applicable) and wiring harness inspection.

This Service Bulletin gives instructions in PART B, to modify the fuel boost pump canister (601R62181−1) after inspection:

− Install new connector harness assy if deemed necessary after inspection, − Replace the O−ring, Part No. MS29513−027, on the cover of the connector cavity if the connector harness assy was replaced, and − Update the canister amendment plate as “B”.

This Service Bulletin gives instructions in PART C, to modify the fuel boost pump cartridges (601R62181−5) and/or (601R62181−7):

− Get access to the LH engine fuel boost pump, RH engine fuel boost pump and the APU fuel boost pump cartridges, − Remove and discard the cartridges O−rings, − Install the new O−ring kit, Part No. KP99−1546, − For the LH and RH engine fuel boost pumps, the existing O−rings MS29513−118, MS29513−034, MS29513−142 are replaced with new O−rings CJ0074, M25988−3−034 and M25988−3−142. The new custom made O−ring (CJ0074) is introduced at the connector cavity interface on the cartridge, MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 2 of 25

− For the APU fuel boost pump, O−ring M25988−3−118 is replaced by the new custom made O−ring CJ0074 at the connector cavity interface on the cartridge.

O−rings M25988−3−034 and M25988−3−142 on the cartridge remain the same, and − Reidentify the cartridge as 601R62181−11 (Engine fuel boost pump cartridge) and/or 601R62181−13 (APU fuel boost pump cartridge).

After PART A, PART B and PART C:

− Do the necessary tests to make sure that the system operates correctly.

D. Compliance Recommended within 5 years from this Service Bulletin release date (Basic Issue).

E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.

NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.

2. The technical content of this Service Bulletin is accepted by the EASA under the Canada/EU bilateral Aviation Safety Agreement.

F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this Service Bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.

For more information related to the manpower, refer to SB 605−00−002.

2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.

3. Labor hours are based on the fact that the modification will be done at the next scheduled maintenance task or inspection. Therefore no man−hours are allotted to prepare the aircraft for maintenance or to prepare for this Service Bulletin.

4 to 10 man−hours are necessary to do this modification.

− 3 man−hours are necessary to do PART A of this modification.

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 3 of 25

− 2 man−hours are necessary to do PART B for each canister modification as needed.

− 1 man−hours are necessary to do PART C of this modification.

The labor required to do this Service Bulletin is at no cost if:

1. the work is done during new aircraft warranty period,

2. the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and

3. this Service Bulletin is accomplished in less than 60 months from its release date (Basic Issue).

G. Material − Cost and Availability No kit is necessary to do this modification.

The parts in Paragraph 3.B. are necessary to do this modification.

This parts are available at no cost if:

− ordered during new aircraft warranty period, and − a no−charge purchase order is sent to Bombardier Aviation in less than 60 months from this Service Bulletin release date (Basic Issue).

This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.

For more information on dedicated schedules, refer to Service Bulletin 605−00−002.

For all parts transactions, Bombardier Aviation’s current Spare Parts and Component Repair Price Catalogue General Terms and Conditions apply. These terms and conditions are found on the Bombardier Customer Portal at:

my.businessaircraft.bombardier.com For those aircraft in new aircraft warranty at the time of Service Bulletin distribution, Smart Parts does not pay for the parts at any time.

For those aircraft out of new aircraft warranty at the time of Service Bulletin distribution, Smart Parts pays for the parts up to 60 months from this Service Bulletin release date (Basic Issue).

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 4 of 25

H. Tooling The equipment and tools listed below are necessary to do this modification:

NOTES: 1. Refer to the CL−605 Illustrated Tool and Equipment Manual (ITEM) to make sure that you use the correct equipment configuration.

2. Refer to the Liability Statement in the ITEM for the CL−605, for acceptable GSE equivalents.

3. This list is provided for quick reference. In case of discrepancy between this list and the tools called in the SPM, WM, Chapter 20, then the tools called in the SPM−WM prevail. Other approved alternative tools are acceptable and can also be used.

I. Weight and Balance No change.

J. Electrical Load Data No change.

K. References − TCCA Airworthiness Directive (Pending).

− Bombardier Aviation, Modification Summary, 600−6632, Rev. B.

− Bombardier Aviation, Restriction and/or Special Instruction (RSI), C−4257, Rev. A−1.

− Bombardier Aviation, Kit Drawing K604−62252, Rev. A.

− CL−605 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 28 and 53.

− CL−605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.

− CL−605 Standard Practice Manual (SPM), Chapters 20 and 51.

− CL−605 Structural Repair Manual (SRM), Chapter 51.

L. Other Publications Affected − CL−605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.

M. Equivalent Service Bulletins − For the Challenger 604 aircraft, use the Service Bulletin 604−28−024.

− For the Challenger 650 aircraft, use the Service Bulletin 650−28−002.

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 5 of 25

2. ACCOMPLISHMENT INSTRUCTIONS NOTES: 1. All TASKs given in the procedures that follow are from the CL−605 Aircraft Maintenance Manual unless otherwise specified.

2. All references made to zones, access panels and/or doors, are from the CL−605 Aircraft Maintenance Manual, Chapter 6.

A. Aircraft Setup NOTE: The steps in the Aircraft Setup section of this Service Bulletin are recommended steps. The steps give a recommendation to get access to the work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator’s discretion.

(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.

(2) Obey the fuel system safety precautions. Refer to AMM 28−00−00−910−801.

(3) Defuel the aircraft fuel tanks. Refer to AMM 12−11−28−650−803 or AMM 12−11−28−650−804.

(4) Lift the aircraft on jacks. Refer to AMM 07−10−01−581−801.

(5) Vent out the fuel tanks. Refer to AMM 28−10−00−840−802.

(6) For the left engine fuel boost pump, open and tag the circuit breakers that follow:

LOCATION CB NO. NAME ZONE CBP−1 M9 FUEL L PUMPCONT 221 CBP−1 M10 FUEL L PUMP 221

(7) For the right engine fuel boost pump, open and tag the circuit breakers that follow:

LOCATION CB NO. NAME ZONE CBP−2 G7 R FUEL PUMPCONT 222 CBP−2 G8 R FUEL PUMP 221

(8) For the APU fuel boost pump, open and tag the circuit breakers that follow:

LOCATION CB NO. NAME ZONE CBP−2 P4 APU FUELPUMP 222 MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 6 of 25

LOCATION CB NO. NAME ZONE CBP−1 L1 APU CONTROL 222

(9) Remove the fuel pump cartridge access covers Part No. 601R62182−9 or Part No. 604−62182−1 for LH, RH engine and APU boost pumps. Refer to AMM 28−11−01−000−801 and Figures 1 and 2.

B. PART A — Harness Inspection and Sleeve Removal on the Fuel Boost Pump Canister, Part No. 601R62181−1.

NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and get an approved disposition to complete this Service Bulletin.

(1) For inspection of the connector harness assy within the LH and/or RH engine fuel boost−pump canister, remove the fuel tank access panels (510BB and 610BB) and leave the harness conduit in place. Refer to AMM 28−11−01−000−801.

Access the left or right canister without removing it from aircraft. Do not remove the canister from the fuel tank access panel 510BB (610BB). Refer to Figures 3 and 4.

(2) For inspection of the connector harness assy within the APU fuel boost−pump canister, remove the fuel tank access panel (640BB) and leave the harness conduit in place. Refer to AMM 28−11−01−000−801.

Access the canister without removing it from aircraft. Do not remove the canister from the fuel tank access panel (640BB). Refer to Figures 3 and 4.

(3) Hold the canister/panel assy on the support device allowing for the inspection directly underneath the access hole. Refer to Figures 3 and 4.

NOTE: If necessary, remove the clamps which hold the fuel hoses to allow the assembly to be moved out from the wing access holes.

(4) Loosen completely the B−nut from the harness conduit and slide the conduit to expose cables to allow inspection of the sleeve area. Refer to Figures 3 and 4.

(5) Do not remove the cover Part No. 246045.

(6) Disconnect the B−nut from the fuel hose to allow a better access to the sleeve area of the wiring harness. Refer to Figures 3 and 4.

(a) For LH and RH engine fuel boost−pump canister, remove the fuel hose assembly, Part No. AE713510−1.

(b) Remove the pressure sensing line from the side of the LH, RH and APU canister.

(c) For APU fuel boost−pump canister, remove the fuel hose assembly, Part No. AE1014208K0132.

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 7 of 25

(d) Do not remove adaptor, Part No. MS24398D16−12 from the APU fuel boost−pump canister assy.

(7) Cut and remove the protective sleeve protruding from the canister cover Part No. 246045 as follows:

(a) Slide the protective sleeve on connector harness, and remove and discard the protective sleeve without damaging the wires. Refer to Figure 5.

NOTE: If unable to remove sleeve by the top of the cover, the sleeve could be removed at next steps.

(8) Remove the cover Part No. 246045 from the canister as follows:

(a) Remove screws from the cover Part No. 246045.

(b) Lift the cover Part No. 246045 to access the connector cavity area.

(c) Slide and remove the protective sleeve from the connector harness assy (if not already removed).

(d) Remove and discard the O−ring Part No. MS29513−027 from the cover.

(9) The canister and access panel assy can be moved away from below the access panel holes area.

(10) For aircraft Serial No. 5956, 5958, 5959, 5967, 5972 to 5980, and 5982 to 5988, verify if there is sealant present inside the connector cavity of the canister, cover and around seams of the cover.

(11) Inspect the internal cavity of the cover for presence of sealant.

(12) Remove the sealant carefully if any is found in the cover internal cavity, connector cavity of the canister, around the cover seam, outside the connector cover, and spring washer.

(13) Inspect carefully the external surface and internal cavity of the cover and the spring washer for any deformation and/or damage. If any deformation and/or damage is found the cover and/or spring washer must be replaced with a new cover and/or spring washer at installation in Para 2.C., PART B.

(14) For all aircraft, inspect the wires for damage and make sure there are no cuts.

For aircraft Serial No. 5933, 5936 to 5938, 5943 to 5947, 5949, 5950, 5952, 5953, 5955, and 5960 to 5962, make sure you inspect the wires for damage and cuts in the proximity to the canister’s harness connector. Refer to Figure 7.

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 8 of 25

Inspection of the Connector Wires Figure 7

(15) If the wires are not found damaged, reinstall cover Part No. 246045 with the wires and connector still in the cover as follows:

(a) Lubricate the new O−ring and install O−ring, Part No. MS29513−027 or alternate on the cover.

(b) Install the cover on the canister with the screws, Part No. MS24693−C27.

NOTES: 1. Ensure the cover seats flat with no gaps around it.

2. Apply a light drop of loctite 242 to the threads of the screws, Part No. MS24693−C27.

3. Torque the screw, Part No. MS24693−C27 to 15 lbf in

(1.69 Nm). Refer to SPM−MM 20−21−00−910−801.

(c) Reinstall the conduit B−nut of the connector harness assy carefully. Make sure the B−nut is installed and torqued per AMM 28−11−01−400−801 and reidentify canister per Para 2.C., PART B., steps 18 and 19.

(d) Install the fuel hoses and pressure sensing lines on the engine and APU fuel boost−pump canisters per AMM 28−11−01−400−801.

(e) For the LH/RH engine fuel boost−pump canister, install the fuel boost canister mounted on its access panel assembly into the fuel tank. Refer to AMM 28−11−01−400−801 and Figure 3, Detail A.

(f) For the APU fuel boost−pump canister, install the fuel boost canister mounted on its access panel assembly into the fuel tank. Refer to AMM 28−11−01−400−801 and Figure 3, Detail B.

(g) Do the electrical bonding test between the re−installed access panels and the aircraft primary structure. The electrical bonding value must not be more than the maximum resistance value of 2.5 mΩ. Refer to SPM−MM 51−80−00−760−801.

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 9 of 25

(16) If wires are found damaged during inspection, do Para 2.C., PART B for modification of connector harness assy.

C. PART B−Modification of the Electric Fuel Boost Pump Canister Part No.

601R62181−1 or −951 after inspection (LH, RH and APU)

(1) For all canisters inspected in PART A that require harness replacement, do the following steps.

(2) If the LH engine fuel boost−pump connector harness assy needs to be replaced, remove the LH forward wing−to−fuselage fairing (191BB). Refer to AMM 53−62−01−000−802.

(3) If the RH engine fuel boost−pump connector harness assy needs to be replaced, remove the RH forward wing−to−fuselage fairing (192BB). Refer to AMM 53−62−01−000−802.

(4) If the APU fuel boost−pump connector harness assy needs to be replaced, remove the Right forward wing−to−fuselage fairing (192BB). Refer to AMM 53−62−01−000−802.

(5) Connector harness assy must be replaced if during the inspection in PART A any of the following was found:

− Harness is found damaged, − The protective sleeve cannot be completely removed as per Para 2B, PART A, step 7(a), − The sealant cannot be completely removed from internal cavity of the cover, or − The sealant cannot be completely removed from the connector cavity of the canister.

(6) Remove and replace the existing connector harness assy with a new connector harness assy, Part No. C93−649 or alternate.

(a) Make sure protective sleeve is removed from new connector harness assy before installation.

(7) Remove the connector harness assy from the canister as follows:

(a) Disconnect the wires (MPE1KD) of the APU canister connector harness assy at terminal block TB442 at FS409 and wire to ground stud N412.

Refer to WM 49−61−00.

(b) Disconnect the wires (MPE1QA) of the LH Engine canister connector harness assy at connector P421 and wire to ground stud N403 and N423.

(c) Disconnect the wires (MPE2QA) of the RH Engine canister connector harness assy at connector P420 and wire to ground stud N404 and N424.

(d) Remove and discard the connector harness assembly.

(8) Remove and clean the sealant if any, from the cover.

(9) Remove and clean the sealant if any, from the connector cavity of the canister and around seam of cover on the canister assembly.

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 10 of 25

CAUTION: Do not use a metallic device to remove sealant, this can damage the cover or the internal of the connector cavity of the canister.

(10) If cover cannot be completely cleaned or damage is found on the cover, replace with new cover. Submit an SRPSA to Technical Support by e−mail to SRPSA@aero.bombardier.com for analysis of damage to possibly reuse the cover. Before ordering a cover, the SRPSA must approve the order of the new part.

(11) Install the new connector harness assy, Part No. C93−649 or alternate into the canister as follows:

(a) Prior to installation of the new connector harness assy, visually inspect the three wires on the canister’s wires harness.

(b) Make sure there are no cuts on the wires.

(c) If any cut is found on the wires, place an order for a new harness assy C93−649 or alternate.

(d) If no cuts are found on the wires, continue the procedure to replace the old connector harness assy with the new connector harness assy.

(e) Slide the wiring harness, Part No. C93−649 or alternate through the spring washer, Part No. 6301.

(i) Make sure the protective sleeve is removed from the connector harness assy before installation.

(f) Lubricate the new O−ring, Part No. MS29513−027 or alternate with petrolatum grease.

(g) Install O−ring, Part No. MS29513−027 or alternate on the cover.

(h) Slide the connector harness assy through the cover.

(i) Make sure the notch on the connector of the connector harness assy is correctly engaged in the pin of the connector cavity of the connector.

(j) Install the cover on the canister with the screws, Part No. MS24693−C27.

NOTES: 1. Ensure the cover seats flat with no gaps around it.

2. Apply a light drop of loctite 242 to the threads of the screws, Part No. MS24693−C27.

3. Torque the screw, Part No. MS24693−C27 to 15 lbf in

(1.69 Nm). Refer to SPM−MM 20−21−00−910−801.

(12) Insert the wire harness in the conduit.

(13) Connect the wires (MPE1KD) of the APU canister connector harness assy at terminal block TB442 at FS409 and wire to ground stud N412. Refer to WM 49−61−00.

(14) Connect the wires (MPE1QA) of the LH Engine canister connector harness assy at connector P421 and wire to ground stud N403 and N423. Refer to WM 28−21−00.

MODEL CL−600−2B16 Basic Issue: Jun 16/2020 605−28−012 Page 11 of 25