On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD.
Text · 17
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0186; AD 2019-15-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'c7bdb68a7d52c0aa2fb3d3bc2a06c45297ae6e1544f2e76b81a149295989fe30' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'c7bdb68a7d52c0aa2fb3d3bc2a06c45297ae6e1544f2e76b81a149295989fe30' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Discard the Revision 01 of this Service Bulletin dated Feb 05/2018, and replace in its entirety with this Revision 02.
Service Bulletin No. 605−32−006 Date of Basic Issue Dec 18/2017 Revision No. 01 Dated Feb 05/2018 Revision No. 02 Dated May 10/2018 This revision has no effect for aircraft on which the Basic Issue or Revision 01 of this Service Bulletin was done thus no other action is necessary. Do not sign the log book if you have not done this revision. Keep the previous log book entry. You may make an entry as "Not Applicable" for this revision.
This revision is issued to:
1. Change, in Paragraph 2.A.(5), the AMM reference to, AMM 12−00−04−862−804.
2. Change, in Paragraph 2.C.(1), the AMM reference to, AMM 07−10−01−581−801.
3. Change, in Paragraph 2.C.(3), the AMM reference to, AMM 12−20−04−640−802.
4. Make miscellaneous minor changes, as necessary, with no change of context.
SERVICE BULLETIN MODEL CL−600−2B16 605−32−006 Page 1 of 1
REVISION TRANSMITTAL SHEET
SPECIAL CHECK/MODIFICATION - EXTENSION AND RETRACTION, MAIN GEAR -
INSPECTION AND REPLACEMENT IF NECESSARY OF THE SIDE STAY ACTUATOR
SPLIT BALL BEARING The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME Refer to Paragraph 1.D.
EFFECTIVITY: AC Serial No.5701 to 5988 MANPOWER: PART A: 0.5 man−hour, PART B: Up to 6.5 man−hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO
TOOLING/GSE YES NO PLANNING INFORMATION: See important information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO PREREQUISITE SERVICE BULLETINS: N/A.
NOTE: This Service Bulletin may be subject to an Airworthiness Directive which will make it necessary to implement this Service Bulletin.
To place an order for parts or kits, please call Bombardier Aerospace Parts Services at: 514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 32−32
LANDING GEAR Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 1 of 1 This Service Bulletin is available at:
SPECIAL CHECK/MODIFICATION - EXTENSION AND RETRACTION, MAIN GEAR -
INSPECTION AND REPLACEMENT IF NECESSARY OF THE SIDE STAY ACTUATOR
SPLIT BALL BEARING
1. PLANNING INFORMATION NOTES:1 . Before you do this bulletin, examine all STC, STA or equivalent action changes to make sure that this bulletin can be completed.
2. This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.
For more information on dedicated schedules, refer to SB 605−00−002.
3. A completed Certificate of Scrap, for the removed split ball bearing, Part No. 104467672, must be submitted within six weeks of the incorporation of this Service Bulletin to Triumph Actuation Systems − Yakima.
Send a scanned copy of the completed Certificate of Scrap by e−mail to:
JLRoybal@triumphgroup.com and RFarabee@triumphgroup.com. Make sure to include the Part Number and Serial Number of the top assembly in the subject line of the e−mail.
If the Certificate of Scrap is not received within six weeks of the incorporation of this Service Bulletin, the operator will be charged, by Triumph Actuation Systems − Yakima, for the replacement split ball bearing.
SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 32−32
LANDING GEAR Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
2017−2018 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 1 of 13 This Service Bulletin is available at:
A. Effectivity CL−600−2B16 aircraft Serial No. 5701 to 5988 NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aerospace Service Bulletin(s).
B. Reason Bombardier Aerospace was informed by its supplier that some MLG side stay actuators were supplied with a non conforming split ball bearing, Part No.
104467672. Material properties of the non conforming split ball bearings do not meet the requirements of AMS4640H.
This Service Bulletin introduces a Special Check/Modification, that gives instructions to verify the serial number of both side stay actuators installed on the aircraft, and replace any non conforming split ball bearing if necessary. The replacement of the discrepant split ball bearings will greatly reduce the risk of bearing seizure.The benefits to the operator are improved reliability or reduced maintenance costs.
C. Description This Service Bulletin gives instructions in PART A to:
− Verify the serial number of the LEFT and RIGHT side stay actuator, and − Take the appropriate action.
This Service Bulletin gives instructions in PART B to:
− Remove the existing discrepant split ball bearing, − Install a new split ball bearing, and − Do the necessary tests to make sure the system operates correctly.
D. Compliance Recommended at or before 3750 flight cycles or within 48 months from Service Bulletin release date (Basic Issue).
NOTES: 1. For units with more than 3350 flight cycles (since new) at the time of Service Bulletin release date (Basic Issue), comply within 12 months or 400 flight cycles, whichever comes first.
2. If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and get an approved disposition to complete this Service Bulletin.
MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 2 of 13
E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.
For more information related to the manpower, refer to SB 605−00−002.
2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.
0.5 man−hour is necessary to do PART A of this Special Check/Modification.
Bombardier Aerospace does not pay for the labor to do PART A of this Special Check/Modification.
Up to 6.5 man−hours are necessary to do PART B of this Special Check/Modification and are divided as follows:
− 2.5 man−hours per side, and − 1.5 man−hours for the testing.
The labor required to do PART B of this Special Check/Modification is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and − this Service Bulletin is scheduled at or before 3750 flight cycles or within 48 months from Service Bulletin release date (Basic Issue).
NOTE: For units with more than 3350 flight cycles (since new) at the time of Service Bulletin release date (Basic Issue), schedule within 12 months or 400 flight cycles, whichever comes first.
MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 3 of 13
G. Material − Cost and Availability No kit is necessary to do PART B of this. For material data, refer to Paragraph 3.
For the part necessary to do PART B of this Special Check/Modification, refer to Paragraph 3.B.
This part is available at no cost if:
− a no−charge purchase order is sent to Bombardier Aerospace in less than 48 months from this Service Bulletin release date (Basic Issue).
NOTE: For units with more than 3350 flight cycles (since new) at the time of Service Bulletin release date (Basic Issue), purchase order must be sent within 12 months from this Service Bulletin release date (Basic Issue).
This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.
A completed Certificate of Scrap, for the removed split ball bearing, Part No.
104467672, must be submitted within six weeks of the incorporation of this Service Bulletin to Triumph Actuation Systems − Yakima.
Send a scanned copy of the completed Certificate of Scrap by e−mail to:
JLRoybal@triumphgroup.com and RFarabee@triumphgroup.com. Make sure to include the Part Number and Serial Number of the top assembly in the subject line of the e−mail.
If the Certificate of Scrap is not received within six weeks of the incorporation of this Service Bulletin, the operator will be charged, by Triumph Actuation Systems − Yakima, for the replacement split ball bearing.
For all parts transactions, Bombardier Aerospace’s current Spare Parts and Component Repair Price Catalogue General Terms and Conditions apply. These terms and conditions are found on the Bombardier Customer Portal at:
my.businessaircraft.bombardier.com During or after the above free period, Smart Parts Plus does not pay for the parts.
MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 4 of 13
H. Tooling The equipment and tools listed below are necessary to do this Special Check/Modification:
GSE REFERENCE NO. PART NO. DESCRIPTION 07−10−01 G600−070001−1 Pad, Jacking 07−10−02 02−1036−0111 Jack, Main Wing 07−10−03 02−1032−0111 Jack, Fwd Fuselage 07−10−06 03−5800−8000 Support, Rear Fuselage 10−10−09 W88F36 Wheel Chocks, Rubber 24−00−24 S4933959−501 Tag, Circuit Breaker Commercially Available − Wrench, Torque Refer to the Standard Practices Manual (SPM), Wiring Manual (WM), Chapter 20, and the table that follows for the tools applicable to the wiring modification:
NOTES: 1. Refer to the CH 605 Illustrated Tool and Equipment Manual (ITEM) to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for acceptable GSE equivalents.
I. Weight and Balance No change.
J. Electrical Load Data No change.
K. References − Bombardier Aerospace, Restriction and/or Special Instruction (RSI), C−4230, Rev. A−1.
− Bombardier Aerospace, Standard Practices Manual (SPM), Chapter 20.
− Bombardier Aerospace, SB 605−00−02, Service Bulletin Description and Policy.
− Safran Landing Systems, Service Bulletin SB19010−32−003.
− Triumph Actuation Systems − Yakima, Service Bulletin 19011−32−1.
− Triumph Actuation Systems − Yakima, Certificate of Scrap (attached).
− CH 605 Aircraft Maintenance Manual (AMM), Chapters 6, 7, 24, 29 and 32.
MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 5 of 13
L. Other Publications Affected None.
M. Equivalent Service Bulletin For the Challenger 604, refer to Service Bulletin 604−32−029.
For the Challenger 650, refer to Service Bulletin 650−32−002.
2. ACCOMPLISHMENT INSTRUCTIONS NOTE: All references made to zones, access panels and/or doors, are from the CH 605 AMM, Chapter 6.
A. Aircraft Setup NOTE: The steps in the Aircraft Setup section of this Service Bulletin are recommended steps. The steps give a recommendation to get access to the work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator’s discretion.
(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.
(2) Obey all hydraulic safety precautions. Refer to AMM 29−00−00−910−801.
(3) Obey all hydraulic technical precautions. Refer to AMM 29−00−00−910−802.
(4) Obey all landing−gear safety precautions. Refer to AMM 32−00−00−910−801.
(5) Release the hydraulic pressure from system No. 3. Refer to AMM 12−00−04−862−804.
(6) On A/C 5701 to 5774 Pre SB 605−34−012.
Open and tag the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE CBP−1 A2 HYD PUMP 3B 221 CBP−2 P2 HYD SYS AC PUMP CONT3B 222 CBP−2 A2 HYD PUMP 3A 222 CBP−2 G4 HYD SYS AC PUMP CONT3A 222 On A/C 5775 and Subs and 5701 to 5774 Post SB 605−34−012.
(7) Open and tag the circuit breakers that follow:
MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 6 of 13
CB PANEL CB NO. NAME ZONE CBP−1 B8 HYD PUMP 3B 221 CBP−2 P2 HYD SYS AC PUMP CONT3B 222 CBP−2 A2 HYD PUMP 3A 222 CBP−2 G4 HYD SYS AC PUMP CONT3A 222 B. PART A − Special Check
(1) Verify the serial number of the LEFT and RIGHT MLG side stay actuator assemblies, Messier Bugatti Dowty (M−B−DT) Part No. 19010−103 and 19010−105 (Triumph Actuation Systems − Yakima (TASY), Part No.
19011−103 and 19011−105) for applicability.
(2) If the serial number is not listed in Table 1 or Table 2, no further action is required.
(3) If the serial number is listed in Table 1 or Table 2, continue to Paragraph 2.C.
TABLE 1 - SIDE STAY ACTUATOR ASSEMBLY M-B-DT, PART NO.
19010-103 (TASY PART NO. 19011-103) IMPACTED SERIAL NO.
00113, 00120, 00177, 00183, 00184, 00203, 00204, 00226, 00263, 00274, 00297, 00314, 00315, 00322, 00323, 00541 TABLE 2 - SIDE STAY ACTUATOR ASSEMBLY M-B-DT, PART NO.
19010-105 (TASY PART NO. 19011-105) IMPACTED SERIAL NO.
00222, 00312G, 00620, 00688, 00693G, 00755, 00766, 00857, 00882, 01092, 01341, 01344, 01354, 01359, 001361 to 01363, 01367, 01368, 01370, 01371, 01373 to 01376, 01382 to 01384, 01387, 01388, 01393, 01397, 01401, 01403 to 01406, 01409 to 01411, 01413 to 01421, 01423 to 01425, 01429, 01430, 01435, 01440,01442, 01446 C. PART B− Modification − Replacement of the Split Ball Bearing NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and get an approved disposition to complete this Service Bulletin.
(1) Lift the complete aircraft with jacks. Refer to AMM 07−10−01−581−801.
MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 7 of 13
(2) Replace the split ball bearing as follows, refer to Figure 1:
(a) Remove and discard the cotter pin (1). Refer to SPM−MM 20−50−00−000−802.
(b) Remove and discard the nut (2).
(c) Remove and discard the washers (3) and (4).
(d) Support the MLG side brace actuator (7), per best shop practices.
(e) Remove the side brace pin assembly (6).
(f) Remove the split ball bearing, Part No. 104467672, from the rod end assembly and discard.
(g) Install the new split ball bearing, Part No. 104467672, in the rod end assembly. Make sure that the witness marks on the bearing faces are matched together.
(h) Apply a layer of grease on the side brace pin assembly (6).
(i) Install the side brace pin assembly (6) through the main fitting.
NOTE: Make sure the flat areas on the side brace pin assembly (6) line up with the flat areas in the lock plate (5).
(j) Hold the head of the side brace pin assembly (6) in position to prevent rotation and forward −and−aft movement.
(k) Install the new washers (3) and (4).
(l) Install the new nut (2).
(m) Torque the nut (2) from 20 to 40 lb ft (27.12 to 54.23 Nm). Refer to SPM−MM 20−21−00−910−801.
(n) Install the cotter pin (1). Refer to SPM−MM 20−50−00−400−802.
(3) Lubricate the spherical bearing. Refer to AMM 12−20−04−640−802.
(4) Identify the reworked Side Stay Actuator with the Service Bulletin identifier number (19011−32−1) with permanent ink per best shop practices. Refer to Figure 2.
(5) Apply one coat of polyurethane clear coat over the ink marking per best shop practices. Refer to Figure 2.
D. Testing
(1) On A/C 5701 to 5774 Pre SB 605−34−012.
Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE CBP−1 A2 HYD PUMP 3B 221 CBP−2 P2 HYD SYS AC PUMP CONT3B 222 MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 8 of 13
CB PANEL CB NO. NAME ZONE CBP−2 A2 HYD PUMP 3A 222 CBP−2 G4 HYD SYS AC PUMP CONT3A 222 On A/C 5775 and Subs and 5701 to 5774 Post SB 605−34−012.
(2) Remove the tags and close the circuit breakers that follow:
CB PANEL CB NO. NAME ZONE CBP−1 B8 HYD PUMP 3B 221 CBP−2 P2 HYD SYS AC PUMP CONT3B 222 CBP−2 A2 HYD PUMP 3A 222 CBP−2 G4 HYD SYS AC PUMP CONT3A 222
(3) Do the Functional Test of the landing gear Extension and Retraction System.
Refer to AMM 32−30−00−720−801.
(4) Do the operational test of the Landing−Gear Emergency Extension. Refer to AMM 32−34−00−710−801.
E. Close−out NOTE: The steps in the Close−out section of this Service Bulletin, except for the return−to−service tests, are recommended steps. The steps give a recommendation to install components removed during the Aircraft Setup.
This recommendation is to make sure that the aircraft is safe and ready to return to service. Alternative steps can be used at the operator’s discretion.
(1) Remove all tools, equipment and unwanted materials from the aircraft.
(2) Lower the complete aircraft. Refer to AMM 07−10−01−586−801.
F. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).
In an effort to improve the quality of our technical communications, we are requesting your feedback. Please take a moment to fill out our easy on−line Service Bulletin survey:
http://csefeedback.aero.bombardier.com MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 9 of 13
3. MATERIAL INFORMATION A. Kits No kit required.
B. Parts The part(s) that follow(s) may be necessary to do this Special Check/Modification and is/are available from Bombardier Aerospace Parts Services, Montreal:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION DMK379−101 Up to2 Kit, MessierDowty − − NOTE: The part number(s) for the item(s) listed above are/is subject to change without revision to this Service Bulletin. In case of discrepancy between this list and any other list, the Illustrated Parts Catalog prevails and shall be used to determine the latest part number.
C. Material The materials that follow, or equivalent, may be necessary to do this Special Check/Modification. They can be purchased from a local supplier. Bombardier Aerospace does not pay for these consumable.
DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY
SUPPLIER (SEE NOTE) Clear Coat, Polyurethane CT: 4 hours PF−6 Series PH36 or PG−6 Series − As Necessary Code: A MODEL CL−600−2B16 Basic Issue: Dec 18/2017 Revision 02: May 10/2018 605−32−006 Page 10 of 13