Service bulletin · Bombardier

Revision 3650_28_001R3 · 15 pages · 3.7 MB

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0725; AD 2021-26-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0725 (document 0006) · AD 2021-26-23

Manufacturer
Bombardier
Type
Service Bulletin
Number
650-28-001
Latest revision known
650-28-001, Revision 3, dated January 3, 2019

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 15Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0725; AD 2021-26-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '24dbf286d63d830053cbe2bcdf8d4bb9dcf2c06fd72bdd3b990dc83383e83ea2'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Discard the Revision 02 of this Service Bulletin dated Aug. 31/2018 and replace in its entirety with this Revision 03.

Service Bulletin No. 650−28−001 Date of Basic Issue Nov 03/2017 Revision No. 01 Dated May 14/2018 Revision No. 02 Dated Aug 31/2018 Revision No. 03 Dated Jan 03/2019 This Service Bulletin contains special check instructions and must be repeated every 600 flight hours or 12 months, whichever comes first.

This revision has no effect for aircraft on which the Basic Issue, Revision 01 or Revision 02 of this Service Bulletin was done thus no other action is necessary. Do not sign the log book if you have not done this revision. Keep the previous log book entry. You may make an entry as "Not Applicable" for this revision.

This revision is issued to update the compliance time applicable for this Service Bulletin. The changes are as follows:

1. Revise in Paragraph 1.D., the compliance time.

2. Change in Paragraph 1.K., the revision of the Restriction and/or Special Instruction (RSI), C−4127, to Rev. G.

3. Make miscellaneous minor changes, as necessary, with no change of context.

SERVICE BULLETIN MODEL CL−600−2B16 650−28−001 Page 1 of 1

REVISION TRANSMITTAL SHEET

SPECIAL CHECK - STANDBY FUEL FEED SYSTEM AND AUXILIARY POWER UNIT (APU) FUEL FEED SYSTEM - ENGINE AND APU ELECTRICAL FUEL PUMP

CARTRIDGE/CANISTER FUEL LEAKAGE The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.

RECOMMENDED

SPECIFIED TIME COMPLIANCE

COMPLIANCE TIME Refer to Paragraph 1. D.

EFFECTIVITY: AC Serial No. 6050 to 6999 MANPOWER: 5 man−hours.

CONTINUED AIRWORTHINESS (CAW)

FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO

TOOLING/GSE NOYES PLANNING INFORMATION: See important information at the start of Paragraph 1. YES NO

DEDICATED SCHEDULE NOYES PREREQUISITE SERVICE BULLETINS: N/A To place an order for parts or kits, please call Bombardier Aerospace Parts Services at:

514−855−2999 or 1−866−538−1247

SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 28−23, 28−24 FUEL Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 1 of 1 This Service Bulletin is available at:

SPECIAL CHECK - STANDBY FUEL FEED SYSTEM AND AUXILIARY POWER UNIT (APU) FUEL FEED SYSTEM - ENGINE AND APU ELECTRICAL FUEL PUMP

CARTRIDGE/CANISTER FUEL LEAKAGE

1. PLANNING INFORMATION NOTES:1 . Before you do this bulletin, examine all STC, STA or equivalent action changes to make sure that this bulletin can be completed.

2. In order to incorporate this Service Bulletin, you must order the following O−rings: Part No’s MS29513−034, MS29513−118 and MS29513−142 (for cartridge Part No. 226114−3). And Part No’s M25988/3−034, M25988/3−118 and M25988/3−142 (for cartridge Part No. P99C25−603).

Refer to Paragraph 3.B.

3. Make sure to complete and submit Appendix 1.

A. Effectivity CL−600−2B16 aircraft, Serial No. 6050 to 6999.

NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aerospace Service Bulletin(s).

B. Reason There have been reported fuel leaks in engine and APU electrical fuel pump cartridge/canister electrical connectors and conduits.

SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL CL−600−2B16 ATA 28−23, 28−24 FUEL Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.

This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.

 2017−2019 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.

Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 1 of 11 This Service Bulletin is available at:

This Service Bulletin gives instructions to verify if there is any possible fuel leakage from LHS or RHS electrical engine pump cartridge/canister at the location of the one belly fairing screw, FS412, BL0.0 (approx.). And verify if there is any possible fuel leakage in the right landing lights compartment or at the location of the one belly fairing screw, FS412, BL0.0 (approx.), from the APU electrical fuel pump.

C. Description This Service Bulletin gives instructions to:

− Do an inspection for any possible fuel leak from LHS or RHS electrical engine pumps at the location of the one belly fairing screw, FS412, BL0.0 (approx.).

− Do an inspection for any possible fuel leak in the right landing lights compartment or at the location of the one belly fairing screw, FS412, BL0.0 (approx.), from the APU electrical fuel pump conduit outlet, − Do the necessary testing to make sure that there are no fuel leaks and that the system operates correctly, − If there are any fuel leaks, contact Bombardier Aerospace Service Engineering for further instructions by submitting a Service Request for Product Support Action (SRPSA) by e−mail at: SRPSA@aero.bombardier.com.

D. Compliance Recommended within 600 flight hours or 12 months, whichever comes first:

− For A/C delivered on or before November 3, 2017, from Service Bulletin release date (Basic Issue), or − For A/C delivered after November 3, 2017, from Entry in Service.

This inspection must be repeated every 600 flight hours or 12 months, whichever comes first.

NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.

E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.

NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.

2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU bilateral Aviation Safety Agreement.

MODEL CL−600−2B16 Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 2 of 11

F. Manpower NOTES: 1. The man−hours given are estimates to help you schedule the tasks given in this bulletin. The estimates are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.

For more information related to the manpower estimates, refer to SB 650−00−002.

2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the labor estimates and should be considered for planning purposes before you schedule this Service Bulletin.

5 man−hours are necessary for the Special Check.

The labor required to do this special Check is at no cost for aircraft that were in new aircraft warranty at the time of release of this Service Bulletin (Basic Issue) if:

− the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and − this Service Bulletin is scheduled in less than 12 months from its release date (Basic Issue).

The labor required to do the repetitive Special Check are at no cost for aircraft that are in aircraft warranty at the time of incorporation of the repetitive Special Check until a permanent solution is provided and if the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF).

G. Material − Cost and Availability No kit is necessary to do this Special Check.

The parts listed in Paragraph 3.B are necessary to replace the O−rings for the special check.

The parts are available at no cost for aircraft that were in new aircraft warranty at the time of release of this Service Bulletin (Revision 01) if:

− a no−charge purchase order is sent to Bombardier Aerospace in less than 12 months, from this Service Bulletin release date (Revision 01).

The parts required to do the repetitive Special Check are at no cost for aircraft that are in aircraft warranty at the time of incorporation of the repetitive Special Check until a permanent solution is provided and if the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF).

For those aircraft in new aircraft warranty at the time of Service Bulletin distribution, Smart Parts Plus does not pay for the parts at any time.

MODEL CL−600−2B16 Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 3 of 11

For those aircraft out of new aircraft warranty at the time of Service Bulletin distribution, Smart Parts Plus pays for the parts for up to one year from the Service Bulletin distribution date (Revision 01).

H. Tooling No equipment or special tools are necessary.

I. Weight and Balance No change.

J. Electrical Load Data No change.

K. References − Bombardier Aerospace, Restriction and/or Special Instruction (RSI), C−4127, Rev. G.

− CL−650 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 28, 51 and 53.

− CL−650 Aircraft Illustrated Parts Catalog (AIPC), Chapters 20 and 51.

− Bombardier Aerospace, Standard Practices Manual (SPM), Chapter 20.

L. Other Publications Affected None.

M. Equivalent Service Bulletins − For the Challenger 604 aircraft, use SB 604−28−022.

− For the Challenger 605 aircraft, use SB 605−28−010.

2. ACCOMPLISHMENT INSTRUCTIONS NOTES: 1. All TASKs given in the procedures that follow are from the CL−650 Aircraft Maintenance Manual (AMM) unless otherwise specified.

2. All references made to zones, access panels and/or doors, are from the CL−650 AMM, Chapter 6.

A. Aircraft Setup NOTE: The steps in the Aircraft Set−Up section of this Service Bulletin are recommended steps. The steps give a recommendation to get access to the work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator discretion.

(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.

MODEL CL−600−2B16 Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 4 of 11

(2) Obey the fuel system safety precautions. Refer to AMM 28−00−00−910−801.

(3) Remove one belly fairing screw located at FS412.00, BL0.0 (approximately).

Keep the screw to re−install later. Refer to Figure 1.

B. Special Check − Inspection of the Engines and APU Electric Fuel Pumps Cartridges/Canisters conduit area without removing the fairing NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.

(1) For Aircraft that have replaced the canister connector Part No. KITC93−440 via an SRPSA or SNIEO, and aircraft that replaced the canister assembly Part No.

226115−2 from the time of delivery, inspect canister connector cavities and wiring conduits for fuel leakage as follows: For all other aircraft, proceed to Paragraph 2.B. (2).

(a) Refuel the LH, RH and Auxiliary tank to a minimum of 3,200 lbs in each tank.

(b) Please use Appendix 1 of this Service Bulletin to record your data from this Special Inspection and send it via email:

BAG_BBAD_CL600_Program@aero.bombardier.com.

(c) Install the wheel chocks at the nose and main landing gear wheels.

(d) Remove the RHS, LHS and APU fuel pump cartridges. Disregard any fuel found in canister connector during cartridge removal. It is normal that the fuel will splash into the canister connector during removal when aircraft is fueled. Clean canister connector with approved contact cleaner. Refer to the table below for applicable AMM references.

AMM REFERENCES

CARTRIDGE REMOVAL CARTRIDGE INSTALLATION LH Engine Pump AMM 28−23−02−000−801 AMM 28−23−02−400−801 RH Engine Pump AMM 28−23−02−000−801 AMM 28−23−02−400−801 APU Pump AMM 28−24−02−000−801 AMM 28−24−02−400−801 Wait a minimum of four hours, then visually inspect the canister connector cavities and wiring conduits for fuel leakage.

(e) During the four hour wait time, continuously check the canister connectors for leaks. This will provide data for the Information Feedback Sheet (Appendix 1).

NOTE: It is sometimes difficult to detect a small leak. For a quick check, place a colored paper shop towel inside the canister to help identify a leak (color of paper towel will become darker when it is wet).

MODEL CL−600−2B16 Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 5 of 11

(f) If there is evidence of a leak at the canister connector, the conduit must be purged of fuel by blowing shop air into the outlet of the conduit in the locations that follow:

(i) For APU boost pump, gain access to the conduit MPE1KD as follows:

a For Aircraft S/N 6050 to 6124, gain access to the conduit MPE1KD at the front spar by removing the RH landing light lens.

b For Aircraft S/N 6125 to 6999, gain access to the conduit MPE1KD at the front spar by removing the RH wing−to−fuselage, fwd fairing (192BB).

(ii) For LH engine boost pump, gain access to the conduit MPE1QA at the front spar by removing the LH wing−to−fuselage, fwd fairing (191BB).

(iii) For RH engine boost pump, gain access to the conduit MPE2QA at the front spar by removing the RH wing−to−fuselage, fwd fairing (192BB).

(g) Once you feel that the fuel is purged, clean the canister connector and repeat the four hour leak check (Steps (e) and (f)).

(h) Visually inspect for any traces of fuel.

(i) If any fuel leakage reoccurs in the inspected areas, submit a Service Request for Product Support Action (SRPSA) by e−mail at:

SRPSA@aero.bombardier.com for further instructions.

(j) If no fuel leakage is detected in the inspected areas do the steps that follow:

(i) Remove the existing O−rings from the cartridges and install the new O−rings.

(ii) The aircraft can continue to operate for up to 600 flight hours or 12 months, whichever comes first from the Service Bulletin release date (Basic Issue). This inspection must be repeated every 600 flight hours or 12 months, whichever comes first.

(k) Re−install the cartridges. Refer to the table in step 1.(c) for AMM references.

(l) Make sure you use the Appendix 1 of this Service Bulletin to record your data from the fuel leak inspections, and send it via email:

BAG_BBAD_CL600_Program@aero.bombardier.com.

(2) For Aircraft S/N: 6050 to 6999. Inspect the wiring conduits for fuel leakage after operating the boost pumps as per the Steps that follow:

(a) Operate the RHS engine electric fuel pump for 15 minutes before inspecting.

NOTE: Make sure the minimum fuel quantity in the applicable tank for boost pump operation is 500 lbs.

MODEL CL−600−2B16 Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 6 of 11

(b) Visually inspect for traces of fuel coming from the RHS engine boost pump at location of belly fairing screw (FS412, BL0.0). Refer to Figure 1.

NOTE: If there’s any fuel leakage from the RHS engine boost pump, clean it before you operate the LHS engine boost pump.

(c) Operate the LHS engine electric fuel pump for 15 minutes before inspecting.

(d) Visually inspect for traces of fuel coming from the LHS engine boost pump at location of belly fairing screw (FS412, BL0.0). Refer to Figure 1.

NOTE: If there’s any fuel leakage from the LHS engine boost pump, clean it before you operate the APU boost pump.

(e) For Aircraft S/N: 6050 to 6124. Visually inspect for traces of fuel coming from the transparent wiring conduit at the APU Boost Pump conduit outlet by looking through the RHS landing light compartment glass window.

Refer to Figure 2.

(i) If fuel leakage is found make sure you record this data and submit the data in a Service Request for Product Support Action (SRPSA) by e−mail at: SRPSA@aero.bombardier.com.

(f) Operate the APU electric fuel pump for 15 minutes minimum before continuing the inspection.

(g) For Aircraft S/N: 6050 to 6124. Visually inspect for traces of fuel coming from the transparent wiring conduit at the APU Boost Pump conduit outlet by looking through the RHS landing light compartment glass window.

Refer to Figure 2.

(h) For Aircraft S/N: 6125 to 6999. Visually inspect for traces of fuel coming from the APU boost pump at location of belly fairing screw (FS412, BL0.0).

Refer to Figure 1.

(i) If no fuel leakage is detected in the inspected areas proceed to the Close−Out.

(j) If any fuel leakage reoccurs in the inspected areas, submit a Service Request for Product Support Action (SRPSA) by e−mail at:

SRPSA@aero.bombardier.com for further instructions.

MODEL CL−600−2B16 Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 7 of 11

Page 10OCROpen in PDF

CHALLENGER 650 MODEL CL-600-2B16

SCREW TO

BE REMOVED VIEW A SB604_2822_001 Location of Belly Fairing gurn Hole, FS 412.00, BL 0.0 Basic Issue: Nov 03/2017 650-28-001 I Revision 03: Jan 03/2019 Page 8 of 11

Page 11OCROpen in PDF

CHALLENGER 650 MODEL CL-600-2B16

RIGHT LANDING

LIGHTS COMPARTMENT

FUEL LEAKAGE

LOCATION MPE 1KD

APU BOOST PUMP

CONDUIT OUTLET DSB2808_001 RHS Landing Lights Compartment - APU Electrical Pump Conduit Figure 2 Basic Issue: Nov 03/2017 650-28-001 I Revision 03: Jan 03/2019 Page 9 of 11

C. Testing − Engines and/or APU Electric Fuel Pumps

(1) Test the re−installed LH and RH engine electric fuel pumps. Refer to AMM 28−23−01−710−801.

(2) Test the re−installed APU electric fuel pump. Refer to AMM 28−24−01−710−801.

D. Close−out NOTE: The steps in the Close−Out section of this Service Bulletin, except for the return−to−service tests, are recommended steps. The steps give a recommendation to install components removed during the Aircraft Set−up. This recommendation is to make sure that the aircraft is safe and ready to return to service. Alternative steps can be used at the operator discretion.

WARNING: FUEL IMBALANCE BETWEEN MAIN WING TANKS MUST BE CORRECTED AT THE END OF THIS CHECK. MOVING, TAXIING

OR TOWING THE AIRCRAFT WITH FUEL IMBALANCE EXCEEDING 400 LBS IS PROHIBITED. IF YOU DO NOT DO THIS,

YOU CAN CAUSE INJURIES TO PERSONS AND/OR DAMAGE TO EQUIPMENT.

WARNING: FUEL DISTRIBUTION MUST BE RESTORED PER AFM FUEL LIMITATIONS (CHAPTER, 02-05). IF YOU DO NOT DO THIS, YOU

CAN CAUSE INJURIES TO PERSONS AND/OR DAMAGE TO EQUIPMENT.

(1) Redistribute the fuel or refuel tanks to correct any fuel imbalance in the tanks, per AFM fuel limitations.

(2) Install the belly fairing screw at FS412.00, BL0.0 location.

(3) Remove all tools, equipment and unwanted materials from the aircraft.

E. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).

In an effort to improve the quality of our technical communications, we are requesting your feedback. Please take a moment to fill out our easy on−line Service Bulletin survey:

http://csefeedback.aero.bombardier.com

3. MATERIAL INFORMATION A. Kits No kit required.

MODEL CL−600−2B16 Basic Issue: Nov 03/2017 Revision 03: Jan 03/2019 650−28−001 Page 10 of 11