On this page
Copies · 2
Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.
© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0684; AD 2022-27-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0684; AD 2022-27-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Manufacturer
- Bombardier
- Type
- Service Bulletin
- Number
- 700-34-7521
- Latest revision known
- 700-34-7521, Revision 04, dated December 6, 2021
- Copies
- 2 files of 2 revisions
A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD.
Text · 76Partly OCR
Revision 04, the newest copy. Some pages are OCR from a scan. OCR can misread letters and numbers. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0684; AD 2022-27-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'dff6ed87196b045c159795fed459f7c96dbbcbdd30634a6e0779514300e5ddcd' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'dff6ed87196b045c159795fed459f7c96dbbcbdd30634a6e0779514300e5ddcd' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Discard Revision 03 of this Service Bulletin dated Jul 27/2021, and replace in its entirety with Revision 04.
Service Bulletin No. 700−34−7521 Date of Basic Issue Apr 01/2021 Revision No. 01 Dated Apr 30/2021 Revision No. 02 Dated Jul 12/2021 Revision No. 03 Dated Jul 27/2021 Revision No. 04 Dated Dec 06/2021 For action applicable to aircraft on which the Basic Issue, Revision 01, or Revision 02 of this Service Bulletin was done, refer to the retroactive action box on Page 1 of this Service Bulletin.
This revision is issued to:
1. Revise, in the Pilots Information Sheet, the AFM revision.
2. Revise, in the Service Bulletin Summary Sheet, the compliance time and manpower. Add a note regarding the Airworthiness Directive (AD).
3. Update, in the retroactive action, the statement for Revision 4.
4. Update Paragraph 1 to clarify Notes 7 and 8 statements. Add note regarding the Airworthiness Directive (AD).
5. Delete, in Paragraphs 1., 1.C., 2.A., 2.B.(5), the instructions to remove the windshield and the requirement for evidence #4.
6. Add, in Paragraph 1.A., notes regarding the retroactive action.
7. Revise Paragraph 1.B. to clarify the root cause #3.
SERVICE BULLETIN MODEL BD−700−2A12 (BD−700) 700−34−7521 Page 1 of 3
REVISION TRANSMITTAL SHEET
8. Revise Paragraph 1.C. to change the quantity of evidences to seven.
9. Revise, in Paragraph 1.D., the compliance date. Add note regarding the Airworthiness Directive (AD).
10.Revise, in Paragraph 1.F., the manpower.
11.Change, in Paragraph 1.H., the External Target Board Assembly to GSE 34X78K−33−11, Part No G05318500−001−SFIX02 and add a NOTE.
12.Update, in Paragraph 1.K., 2.B.(1), and 2.B.(5), the Report Number RAE−BA700−229 to Rev. D, and Rockwell Collins, document 946−9118−001, to Rev. E.
13.Update, in Paragraph 1.L., the AFM revision.
14.Add, in Paragraphs 2.B.(1)(a) and 2.B.(1)(c), the Z values for the golden rivets location.
15.Updated illustrations to reflect the new External Target Board Assembly design and revised per document 946−9118−001 Rev. E.
16.Add, in Paragraph 2.B.(2)(b), a NOTE.
17.Add, in Paragraph 2.B.(4)(i), an information to clarify the caution statement.
18.Add, in Paragraph 2.B.(5)(j), a NOTE.
19.Add, in Paragraph 2.B.(5)(l), an information to clarify the step.
20.Add, in Paragraph 2.B.(6), a CAUTION statement.
21.Change, in Paragraph 2.B.(6)(e), to clarify the step with the telescope.
22.Remove Paragraph 2.B.(7) with the instructions to reinstall the windshield.
23.Add, in Paragraph 2.B.(7), two caution statements.
24.Remove Paragraph 2.B.(8), the windshield verification target procedure and the requirement for evidence #4.
25.Revise, in Paragraph 2.B.(14), the caution statement.
26.Add, in Paragraph 2.B.(14)(b)(iii), an instruction for the IRS circuit breakers.
27.Change, in Paragraph 2.B.(14)(e)(ii) and in Table 2, item #6, the “System Error Circle” nomenclature to “HUD System Verification Target”.
28.Revise, in Paragraph 2.B.(16), the statement for the evidences required.
29.Add Paragraph 2.C.(3), to inform the evidences shall be reviewed.
30.Add, Paragraph 2.D.(2), to reinstall the golden rivets.
MODEL BD−700−2A12 (BD−700) 700−34−7521 Page 2 of 3
31.Revise, in Paragraph 2.D.(3), to clarify the step.
32.Update, in Paragraph 3.D., the AFM revision.
33.Make miscellaneous minor changes, as necessary, with no change of context.
MODEL BD−700−2A12 (BD−700) 700−34−7521 Page 3 of 3
MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –
HUD CALIBRATION PROCEDURES A. Objective It has been reported the Heads Up Display (HUD) may not be sufficiently aligned for Enhanced Flight Vision System (EFVS) or Steep Approach operations. Installation of the HUD requires an angular accuracy to within 5.0 mrad (0.286°). It has been discovered on several aircraft, that the installation had a misalignment greater than 5.0 mrad (0.286°).
The Steep Approach or EFVS operations are not permitted until the accuracy of the HUD has been verified and corrected if necessary.
This Service Bulletin is issued to correct the HUD installation and alignment.
B. Systems Impacted Enhanced Flight Vision System (EFVS) or Steep Approach operations.
C. Flight Compartment Procedure Impacted Not applicable.
D. Passenger Compartment Procedure Impacted Not applicable.
E. Pilot Training Not applicable.
F. AFM References − Airplane Flight Manual (AFM), CSP 700−7000−1, Revision 14 dated Oct 21/2021.
G. Additional Information Not applicable.
MODEL BD−700−2A12 (BD−700) ATA 34−32
NAVIGATION Basic Issue: Apr 01/2021 Revision 04: Dec 03/2021 700−34−7521 Page 1 of 2
PILOTS INFORMATION SHEET
I. Recording After Service Bulletin 700−34−7521 is incorporated, make sure to update the aircraft logbook to show that Service Bulletin 700−34−7521 (Rev. 04) as incorporated and if applicable provide a copy of the Pilot Information Sheet to the flight crew and revise AFM 01−00−General to include this Service Bulletin.
MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 04: Dec 03/2021 700−34−7521 Page 2 of 2
MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –
HUD CALIBRATION PROCEDURES The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME Recommended before February/2024 EFFECTIVITY: A/C Serial No. 70006 to 70084 MANPOWER: 39 man−hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN YES NO
AIRWORTHINESS LIMITATIONS (AWL) NOYES KITS and/or PARTS YES NO
TOOLING/GSE YES NO PLANNING INFORMATION: See important information at the start of Paragraph 1. YES NO
DEDICATED SCHEDULE YES NO PREREQUISITE SERVICE BULLETINS: N/A NOTES: 1. If the RHS HUD is installed on the aircraft, Bombardier recommends that the Service Bulletin 700−34−7523 be done at the same as Service Bulletin 700−34−7521.
2. This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA, AD CF−2021−36.
To place an order for parts or kits, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL BD−700−2A12 (BD−700) ATA 34−32
NAVIGATION Basic Issue: Apr 01/2021 Revision 04: Dec 06/2021 700−34−7521 Page 1 of 1 This Service Bulletin is available at:
MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –
HUD CALIBRATION PROCEDURES
RETROACTIVE ACTION
THE ACTION THAT FOLLOWS IS RECOMMENDED FOR AIRCRAFT ON WHICH THE BASIC ISSUE, REVISION 01, OR REVISION 02 OF THIS SERVICE BULLETIN WAS DONE:
A typographical error on the metric values on the External Target Board table has been corrected in Revisions 03 and 04 of Service Bulletin 700−34−7521. If the operator has used the imperial values, then no action is required.
If the operator has used the metric values, then review the collected Evidence #1, the Laser Tracker Report, to verify if the target was aligned in accordance to the values listed on Service Bulletin 700−34−7521 Revision 04, step 2.B.(1)(c). If the Evidence #1, the Laser Tracker Report shows the target board alignment outside the tolerances from the Service Bulletin 700−34−7521 Revision 04, step 2.B.(1)(c), then perform the Service Bulletin 700−34−7521 Revision 04 to ensure correct HUD alignment.
1. PLANNING INFORMATION NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or equivalent action changes to make sure that this Service Bulletin can be completed.
2. For any technical issues, contact CSE, Technical Support, Global Express by e−mail at SRPSA@aero.bombardier.com .
SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL BD−700−2A12 (BD−700) ATA 34−32
NAVIGATION Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
2021 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Apr 01/2021 Revision 04: Dec 06/2021 700−34−7521 Page 1 of 63 This Service Bulletin is available at:
3. Due to complexity, this Service Bulletin needs to be performed at specific Bombardier Aviation Service Centers due to limited specialized tooling.
Contact the In−Service Implementation Team (ISIT) prior to scheduling your aircraft to confirm availability during your down time.
4. Bombardier Aviation Service Centers may contract a third party entity to Set−Up the Target Board in front of the aircraft using laser tracking device or a theodolite. The third party entity will use their own laser equipment or theodolite and will supply the laser tracker report of the aircraft leveling and Target Board placement.
5. This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.
For more information on dedicated schedules, refer to SB 700−00−7502.
6. If the RHS HUD is installed on the aircraft, Bombardier recommends that the Service Bulletin 700−34−7523 be done at the same as Service Bulletin 700−34−7521.
7. Make sure there is enough space in front of the aircraft to place the Target Board. The distance from the nose landing gear wheel center to target:
431 in (10.95 m). The target board area must be clear of any condition that could cause movement. A barrier tape can be installed around it to avoid accidental impact to of the target board.
8. After the Target Board has been aligned in front of the aircraft with laser tracker, the access to AFT of the aircraft, behind FS727 (inside the cabin or outside the aircraft) should be avoided. No moving of flaps either. This is to ensure that the alignment of the Target Board in reference to the aircraft remains undisturbed until the collection of the all evidences (Tables 2 and 3).
9. All the steps to collect Evidences #5 and #6, including the proper Collins’s technique for PUSH, PULL and RELEASE of the Combiner, are documented in the attached video (Appendix 1) titled "How to record HUD Combiner image (evidences #5 and #6) per Strategia TT−237.mp4".
Review this training video before starting the procedure.
10.This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA, AD CF−2021−36.
MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 04: Dec 06/2021 700−34−7521 Page 2 of 63
A. Effectivity BD−700−2A12 aircraft, Serial No. 70006 to 70084.
NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aviation Service Bulletin(s).
The intent of this Service Bulletin was met on the aircraft that follow with the Non−Conformance Report (NCR), or Service Requests for Product Support Action (SRPSA) listed in the table that follows:
AIRCRAFT SERIAL NO. NCR NO. SRPSA NO.
70016 − 000445211 70040 − 000447866 70047 B321002257 − 70049 B321000506 − 70053 B321001912 − 70059 B321001657 − 70063 B321002038 − 70064 B321003969 − 70065 B321000895 − 70066 B321002888 − 70070 B321004307 − 70072 B321004308 − 70073 B321003782 − NOTE: No retroactive action is required against any of the aircraft listed on this table as they were completed using the imperial values for target board alignment.
The intent of this Service Bulletin was met on the aircraft that follow with the Pre−Published Service Bulletin 700−34−7521 Revision 02 listed below:
AIRCRAFT SERIAL NO. PRE-PUBLISHED DATE 70026 Jul 06/2021 70034 Jul 06/2021 MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 04: Dec 06/2021 700−34−7521 Page 3 of 63
AIRCRAFT SERIAL NO. PRE-PUBLISHED DATE 70037 Jun 18/2021 NOTE: No retroactive action is required against any of the aircraft listed on this table as they were completed using the imperial values for target board alignment.
B. Reason
1. Condition:
It has been reported the Heads Up Display (HUD) may not be sufficiently aligned for Enhanced Flight Vision System (EFVS) or Steep Approach operations.
Installation of the HUD requires an angular accuracy to within 5.0 mrad (0.286°). It has been discovered on several aircraft, that the installation had a misalignment greater than 5.0 mrad (0.286°).
The Steep Approach or EFVS operations are not permitted until the accuracy of the HUD has been verified and corrected if necessary.
2. Evidence:
The root causes of HUD misalignment have been identified as follows:
Source #1 − AMAT mishandling and workmanship issues.
Performing HUD alignment using an out of calibration AMAT causes HUD image misalignment.
Note that an AMAT metrology report or a HUD Combiner picture (taken properly using the ERP tool) can show that this kind of misalignment has been introduced.
The current procedure has been updated with additional AMAT instructions to help prevent AMAT mishandling and workmanship issues causing the tool to become out of calibration.
Source #2 − epoxy curing time too short.
It has been demonstrated that a HUD Combiner installation performed when the epoxy has not cured for long enough, will cause the Combiner hard mounting point to become misaligned. Therefore, it is now requested 48 hours curing time before installation of the Combiner (i.e. before torqueing of the Combiner Channel fasteners). The current procedure has been updated to account for the new epoxy curing time. Furthermore, it has also been demonstrated that an AMAT telescope picture cannot capture to its full extent deviations of the Combiner hard mounting point caused by this epoxy/torqueing issue. This is an AMAT limitation that was previously unknown. Only a HUD Combiner picture taken properly using the ERP tool can show that this kind of misalignment has been introduced.
MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 04: Dec 06/2021 700−34−7521 Page 4 of 63
The current procedure has been updated to collect the HUD Combiner picture and use it as additional PASS/FAIL criteria.
Source #3 − optical issues with the windshield.
For the HUD Model 6600 to meet the required angular accuracy, the total HUD system display boresight accuracy error budget must be less than or equal to 5.0 mrad. To achieve the goal of staying within that budget, track must be kept of the contributing error of each component in the HUD system and its installation. This is done along both the horizontal and the vertical axis.
HUD installation is one component of that error budget, where the AMAT telescope is pointing to the external Target Board looking through the windshield. The Global 7500 windshield is also a source of error. The magnitude of the windshield refraction offsets had never been measured until November 2020. The results of the windshield sampling measured were more scattered than anticipated for the windshields manufactured initially. It was known that some windshields did not meet the error limit allocated to the windshield. Consequently, a new HUD alignment method had to be developed and the windshield manufacturing control process had to be looked at. The new method continues to enable the HUD system to meet the requirement on boresight accuracy.
To increase the tolerance for windshield error:
− Perform the HUD alignment with the windshield installed.
− Perform the HUD alignment closer to the center of the Target Circle.
3. Objective/Benefit:
This Service Bulletin is issued to correct the HUD installation and alignment.
C. Description This Service Bulletin gives instructions to:
− Set−up the External Target Board, − Remove Overhead Unit (OHU) and Combiner, − Align the HUD mounting hard points, − Remove the AMAT, install OHU and combiner, − Do the “HUD system error verification” procedure, − Collect all seven evidences (listed in Tables 2 and 3) and store them, along with page 5 of the Appendix 1, in the location specified in Appendix 1, and − Realign the EVS with the new HUD alignment position.
MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 04: Dec 06/2021 700−34−7521 Page 5 of 63
D. Compliance Specified Time Compliance NOTES: 1. Bombardier Aviation recommends that this Service Bulletin be done before February/2024.
2. If it is not possible to complete all the instructions in this Service Bulletin because of the aircraft configuration, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.
3. This Service Bulletin is in reference to Advisory Wire AW700−34−0797.
4. This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA, AD CF−2021−36.
E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU Bilateral Aviation Safety Agreement.
F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this Service Bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.
For more information related to the manpower, refer to SB 700−00−7502.
2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at the next scheduled maintenance task or inspection. Therefore no man−hours are allotted to prepare the aircraft for maintenance or to prepare for this Service Bulletin.
39 man−hours are necessary to do this modification.
MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 04: Dec 06/2021 700−34−7521 Page 6 of 63