Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '35a33b4a3d064204e5cc36b24e31a5658b763fdb923701d3ee74439695b7eb5e' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '35a33b4a3d064204e5cc36b24e31a5658b763fdb923701d3ee74439695b7eb5e' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
AIRWORTHINESS REQUIREMENTS TEMPORARY REVISION 2A−69 C Airworthiness Requirements Part 2 of Maintenance Requirements Manual Appendix A − Certification Maintenance Requirements FILING INSTRUCTIONS: Insert this Temporary Revision (TR) 2A−69 facing page 2A−3, in Part 2 of the Maintenance Requirements Manual (MRM).
Record the incorporation of this Temporary Revision on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of the MRM Part 2.
Keep this Temporary Revision until normal revision service incorporates this information into the Maintenance Requirements Manual.
DESCRIPTION: This Temporary Revision is issued to add CMR TASK NUMBER C26−25−115−01.
CL 600 2B19 The contents of this Temporary Revision have been approved by the Chief, Engineering (or designate), National Aircraft Certification Branch, Transport Canada Date August 30, 2018 Signed P. Ngassam Page 1 of 2 Aug 30/18 TR# 2A−69
AIRWORTHINESS REQUIREMENTS TEMPORARY REVISION 2A−69 C Airworthiness Requirements Part 2 of Maintenance Requirements Manual Appendix A − Certification Maintenance Requirements
CERTIFICATION MAINTENANCE REQUIREMENTS TASK NO. TASK DESCRIPTION TASKINTERVAL CMR Category(*) or (**) C26−25−115−01 Detailed Inspection of the Window Louver Panel Assembly (WLPA) in Aft Cabin/Cargo Compartment Bulkhead NOTE:
Airworthiness directive issued.
PHASE−IN:
1. If Bombardier SB 601R−25−201 has not been incorporated and/or MRB 26−25−00−09 has not been performed:
− For aircrafts that have accumulated 780 FH or more as of the effective date of the original issue of AD CF−2015−28 (21 October 2015), accomplish this inspection within 100 FH from the effective date of the original issue of AD CF−2015−28 (21 October 2015).
− For aircrafts that have accumulated less than 780 FH as of the effective date of the original issue of AD CF−2015−28 (21 October 2015), accomplish this inspection prior to accumulating 880 FH.
2. If WLPA has been inspected using Bombardier SB 601R−25−201 and/or MRB 26−25−00−09, accomplish this inspection within 880 FH since last inspection.
880 Flight Hours (**) CL 600 2B19 Page 2 of 2 Aug 30/18 TR# 2A−69