Copy · TR 2A-73 · 2 pages

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2023-0167; AD 2023-09-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'cf859fcec75782082a3e3c681b4325e42954269dd9ea17f5da1817c4f377545b'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

AIRWORTHINESS REQUIREMENTS TEMPORARY REVISION 2A−73 C Airworthiness Requirements Part 2 of Maintenance Requirements Manual Appendix A − Certification Maintenance Requirements 1 of 2Page The contents of this Temporary Revision have been approved by the Chief, Engineering (or designate), National Aircraft Certification Branch, Transport Canada FILING INSTRUCTIONS: Insert this Temporary Revision (TR) 2A−73 facing page 2A−3, in Part 2 of the Maintenance Requirements Manual (MRM).

Record the incorporation of this Temporary Revision on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of the MRM Part 2.

Keep this Temporary Revision until normal revision service incorporates this information into the Maintenance Requirements Manual.

DESCRIPTION: This Temporary Revision is issued to add CMR TASK NUMBER C26−20−131−04.

CL 600 2B19 Jun 5/20 TR# 2A−73 Date 5 June 2020 Signed P. Ngassam

AIRWORTHINESS REQUIREMENTS TEMPORARY REVISION 2A−73 C Airworthiness Requirements Part 2 of Maintenance Requirements Manual Appendix A − Certification Maintenance Requirements 2 of 2Page

CERTIFICATION MAINTENANCE REQUIREMENTS TASK NO. TASK DESCRIPTION TASKINTERVAL CMR Category(*) or (**) C26−20−131−04 Restoration (Pressure Switch test) of Engine and APU fire extinguisher bottles 120 Months (**) CL 600 2B19 Jun 5/20 TR# 2A−73 Phase−In:

Fire extinguisher bottles which had the last hydrostatic test performed on or before Jun/05/14, do the next inspection within 48 months from the issue date of TR 2A−73 (Jun 05/20).