Copy · Global 5000 TLMC TR 5-2-21 · 1 page

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2024-1483; AD 2024-26-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'c8f01886d436d81c3f5785711b30f31f9b371765435e2306667aa5509a74eca0'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

REASON FOR ISSUE: To introduce a Detailed Inspection of the Bearing in the Elevator Torque Tube Assembly.

ACTION: Add the task that follows to the list of tasks in Section 5−10−40:

Source Document Ref. No. Chapter 5 Task No. Task Title Task Interval Allowable Extension RBR−C700−104 Rev. C−2−1 7.1.2.6 27−31−19−101 ** (two stars) Detailed Inspection of the Bearing in the Elevator Torque Tube Assembly PHASE−IN: First accomplishment of this task must be within 60 Months from the last compliance of SB 700−1A11−27−041. For aircraft that have not accomplished SB 700−1A11−27−041, this task must be done within 6 Months from the date of TLMC Temporary Revision 5−2−21 (Mar 31/2023) or 63 Months from the date of initial completion center delivery (entry into service), whichever comes later.

NOTE: See section 5−10−05, paragraph 5.

60 M 3 M NOTE A Mar 31/2023 5−10−40 P a g e1o f1PART 2TR 5−2−21 BD−700 TIME LIMITS/MAINTENANCE CHECKS TEMPORARY REVISION NO. 5−2−21 INSERT IN SECTION 5−10−40 FACING PAGE 5 NOTE: Record the incorporation of this Temporary Revision on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of this manual and LIST OF EFFECTIVE TEMPORARY REVISIONS sheet at the front of Part 2.

EFFECTIVITY: ALL