Copy · TR 5-2-74 · 1 page

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2025-1728; AD 2025-24-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextOCR

This text is OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'ad2b6ebd455d174e086ab5593ff9b7683198d1350dacae87e3986ca1da5acd3c'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

TEMPORARY REVISION NO. 5-2-74 EFFECTIVITY: ALL INSERT IN SECTION 5-10-40 FACING PAGE 14 REASON FOR ISSUE: To introduce a Functional Test of the Auxiliary Power Unit (APU) Mufler Drain.

ACTION: Add the task that follows to the list of tasks in Section 5-10-40:

Source Document Ref. No. Chapter 5 Task No. Task Title Task Interval Allowable CL-604 TIME LIMITS/MAINTENANCE CHECKS Extension ¿HÄLLÉNGÉŘ604 RAP-604-171 49-15-01-101* Functional Test of the Auxiliary Power Unit 3000 APU H Rev. J-13 (one star) (APU) Muffler Drain (A/C 5301 to 5630, Post SB 604-49-006, and A/C 5631 and Subs).

PHASE-IN: For APUs with 2500 APU Hours or more, as of the date of TLMC Temporary Revision 5-2-74 (Jun 28/2024) this task must be complied with at the next accomplishment of task 49-15-00-201 or within 12 Months, whichever comes first.

5-10-40 PART 2 Jun 28/2024 Page 1 of 1 TR 5-2-74 NOTE: Record the incorporation of this Temporary Revision on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of this manual and LIST OF EFFECTIVE TEMPORARY REVISIONS sheet at the front of Part 2.