Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '2f335f5ec3af95f13bc0201fc5f22bd04169488eac6824539b3b7364406920d9' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '2f335f5ec3af95f13bc0201fc5f22bd04169488eac6824539b3b7364406920d9' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
TEMPORARY REVISION ALI−0557 The contents of this Temporary Revision have been approved by the Chief, Engineering (or designate), National Aircraft Cerification Branch, Transport Canada Civil Aviation Date August 19, 2016 Signed Dave Turnbull F
AIRWORTHINESS LIMITATIONS CSP B−053 − Maintenance Requirements Manual − Part 2 EFFECTIVITY: Model CL−600−2C10 Model CL−600−2D15 Model CL−600−2D24 Model CL−600−2E25 4−28 FILING INSTRUCTIONS: This Temporary Revision (TR) replaces Task Number 28−12−00−602, in Section 4−28, of the Maintenance Requirements Manuals (MRM) Part 2.
Record this Temporary Revision number and the date inserted on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of the Manual.
Keep this Temporary Revision until the normal revision service puts this information into the Maintenance Requirements Manual or the TR is cancelled.
DESCRIPTION: This Temporary Revision is issued to revise TASK NUMBER 28−12−00−602 as follows: revise MODEL EFFECTIVITY from 700/705/900 to ALL, revise DESCRIPTION APPLICABILITY to add "and Post SB 670BA-36-022 or 19049−19250", revise DESCRIPTION NOTE to add MODEL CRJ1000: Effective Date: May 30/2016 TR ALI−0557 Page 1 of 2 Aug 19/2016
FUEL SYSTEM LIMITATIONS 28 − FUEL SYSTEM
ALI TASK NUMBER CONF LTR MODEL
EFFECTIVITY DET8000 FH F
AIRWORTHINESS LIMITATIONS CSP B−053 − Maintenance Requirements Manual − Part 2 EFFECTIVITY: Model CL−600−2C10 Model CL−600−2D15 Model CL−600−2D24 Model CL−600−2E25 4−28
DESCRIPTION INTER VAL TASK TYPE 28−12−00−602 ALL VENT BOOT PROTECTION JACKETS: Detailed Inspection of the vent boot protection jackets for condition and security.
APPLICABILITY: Post SB 670BA−36−016 or A/C 10002, 10332−10999, 15280−15990, and Post SB 670BA-36-022 or 19049−19250 NOTE: RECOMMENDED PHASE−IN:
MODELS CRJ700/CRJ900: Effective Date: Sep 25/2015 MODEL CRJ1000: Effective Date: May 30/2016 Do the initial inspection as follows:
1. For aircraft with less than 1400 FH, accomplish before reaching 8000 FH.
2. For aircraft with 1400 FH or more, accomplish within 6600 FH from Effective date.
TR ALI−0557 Page 2 of 2 Aug 19/2016