TextOCR
This text is OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'af76b209fcf653ff59945ea7b5691d479d6d5b48571cf027b422b1e82a540c72' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'af76b209fcf653ff59945ea7b5691d479d6d5b48571cf027b422b1e82a540c72' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
TEMPORARY HIRJ TEMPORARY
REVISION REVISION
AIRWORTHINESS LIMITATIONS TEMPORARY REVISION ALI-0759 The contents of this Temporary Revision have been approved by the Chief, Engineering (or designate), National Aircraft Certification Branch, Transport Canada Civil Aviation Date Sep 24, 2021 Signed Michel Lopez FILING INSTRUCTIONS: Insert this Temporary Revision (TR ALI-0759) on Page 2, in Section 1-27 of the Maintenance Requirements Manual (MRM) Part 2.
Record this Temporary Revision number and the date inserted on the yellow RECORD OF TEMPORARY REVISIONS sheet at the front of the Manual.
Keep this Temporary Revision until the normal revision service puts this information into the Maintenance Requirements Manual or the TR is cancelled.
DESCRIPTION: The Teno 40y Rore This Temporary Revision is issued to revise CMR TASK NUMBER 27-20-00-106 as follows: revise INTERVAL from 500 FH to 400 FH or 6 MO (W.C.F), revise DESCRIPTION to add NOTE for RECOMMENDED PHASE-IN.
CSP B-053 - Maintenance Requirements Manual - Part 2 EFFECTIVITY: Model CL-600-2C10 Model CL-600-2C11 TR ALI-0759 Model CL-600-2D15 Model CL-600-2D24 1-27 Page 1 of 2 Model CL-600-2E25 Sep 24/2021
TEMPORARY MHIRJ TEMPORARY
REVISION REVISION
AIRWORTHINESS LIMITATIONS
CERTIFICATION MAINTENANCE REQUIREMENTS 27 - FLIGHT CONTROLS
ALI TASK CONF MODEL DESCRIPTION INTERVAL TASK CMR
NUMBER LTR EFFECTIVITY TYPE CATEGORY (*) OR (**) 27-20-00-106 550/ RUDDER POWER CONTROL UNIT: Operational Check of 400 FH OPC (*) 700/705/900 each PCU element by pressurizing each hydraulic system in or turn. Ensure free movement of the rudder pedals and 6 MO maximum travel indication of the rudder surface position via the (W.C.F) EICAS NOTE: RECOMMENDED PHASE-IN:
Effective Date: Sep 24/2021 Accomplish the initial operational check within 400 FH or 6 Months whichever comes first (W.C.F.) from effective date.
CSP B-053 - Maintenance Requirements Manual - Part 2 EFFECTIVITY: Model CL-600-2C10 Model CL-600-2C11 TR ALI-0759 Model CL-600-2D15 Model CL-600-2D24 1-27 Page 2 of 2 Model CL-600-2E25 Sep 24/2021