Revision 2AOT-C295-32-0001-2 · 17 pages · 594 KB

© CASA. Filed by the FAA in regulations.gov docket FAA-2018-0493; AD 2018-18-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2018-0493 (document 0004) · AD 2018-18-10

Manufacturer
CASA
Type
All Operators Transmission
Number
AOT-C295-32-0001
Latest revision known
AOT-C295-32-0001, Revision 2, dated October 26, 2016

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 17Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © CASA. Filed by the FAA in regulations.gov docket FAA-2018-0493; AD 2018-18-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'cfd340a50c8d801d008a78e7896304ca2f1516abdec03f167397f5b2c33e4238'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Ref No.: AOT - C295 - 32 - 0001 Rev No.: 2 Rev Date: 26/10/2016

SERVICES DIRECTORATE Pº John Lennon s/n 28906 Getafe, Madrid, SPAIN mta.technicalservice@airbus.com

Alert Operators Transmission Page 1 / 17 ATA Chapter: 32 Subject:

NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

Aircraft Type: C - 295 M, C - 295ASW and C - 295MW Applicability: ALL Referenced Documents:

IPC 32 - 21 - 01 Fig. 01 AMM CA - A - 32 - 00 - 00 - 00A - 912A - A AMM CA - A - 32 - 21 - 00 - 00A - 271B - A SRM CA - A - 51 - 24 - 00 - 00A - 259A - A CMM 32 - 21 - 15 SB295 - 32 - 0005M NOTE: This AOT is considered by Airbus DS as a Mandatory Action

1. REASON FOR REVISION The revision 02 of this AOT is issued to incorporate a new inspection in the non - visible area of the shaft of the NLG door mechanism actuator shaft assembly.

This revision is also issued in order to inform about the publication of the Service Bulletin SB295 - 32 - 0005M. The accomplishment of this SB will be terminating action of the repetitive inspections required in this AOT.

2. REASON

Some CN - 235 and C - 295 M opera tors have reported cracks in the actuator shaft assembly of the Nose Landing Gear (NLG) doors mechanism.

2.1 FACTS C - 295M , C - 295MW and C - 295ASW h a ve a system of levers and springs for the NLG doors opening a nd closing operation s.

The latching mechanism includes the actuator shaft assembly P/N 95 - 42315 - 00 (IPC 32 - 21 - 01) . This shaft assembly comprises two cams and two levers installed over a shaft (refer to figure 01).

2.2 CONSEQUENCES A combined rupture of the actuator shaft assembly components could result on the mechanical disconnection of the NLG doors, possibly leading to a not commanded opening of the doors, being the doors mechanically disconnected from the NLG leg. This malfunction would not interfere with the normal NLG operation.

The crew would no t be aware of the doors opening and keep flying with the risk of NLG doors detachment.

2.3 AIM Th e aim of this AOT is to provide O perators with the necessary instructions to inspect the NLG doors actuator shaft assembly, in order to ensure the correct status of the components.

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 2 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

2.4 INVESTIGATION Airbus Defence and Space performed an analysis of the two elements of the NLG doors mechanism that are susceptible for the presence of cracks.

- the teeth at the castel lation joint; on the lever side

- the shaft holes for the expansible bolts

3. SHORT TERM ACTION

3.1 PLANNING AND MANPOWE R

3.1.1 ACCOMPLISHMENT TIMESCALE Table 01 - Inspections of the levers and cams with NLG actuator shaft installed on the aircraft Condition Action Compliance time Repetitive interval Threshold Grace period Condition Interval All aircraft Perform a Detail Visual Inspection according to paragh. 3.2.2.1 600 FH 60 FH (1) A ircrafts that have not had vibrations in any of its NLG doors during previous flights 300FH A ircrafts that have had vibrations in any of its NLG doors during previous flights 150FH

(1) A ircraft which have accomplishe d the previous revision of this AOT do not have to perform the initial inspection. These aircraft will perform their repetitive inspections according to the findings ( paragraph 3.2.3 .1 and Table 03).

Table 02 - Inspection of the shaft (choose only one type of inspection) Condition Action Compliance time Repetitive interval Threshold Grace period All aircraft Perform a Rototest inspection according to paragh. 3.2.2.2.A 1 800 FH (1) 60 FH 900 FH or 3A check Perform a Detailed Visual Inspection according to paragh. 3.2.2. 2 .B 600 FH or 2A check

(1) Since new or since last shaft replacement

The accomplishment of the Service Bulletin SB 29 5 - 32 - 00 05 M will be the terminat ing action to the above required inspections.

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 3 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

3.1.2 MANPOWER The estimated time to perform AOT task is:

- 1 hour x 1 person for inspect the levers and cams.

- 6 hours x 1 person for ins pect the shaft with rototest inspection method.

- For inspect the shaft removing the NLG actuator shaft assembly:

o 8 hours x 1 person for removal/installation + DVI o 2 hours x 3 people for aircraft on lifts + Functional Test

- For replace the actuator shaft a ssembly or component(s):

o 8 hours x 1 person for removal/installation o 3 hours x 2 people for aircraft on lifts + Functional Test

NOTE: The manpower estimates given in this AOT do not include the time to prepare, plan or inspect the work.

Manufacture and procurement of parts and tools, drying times for paints, sealants, etc., and general administration work are also not included.

3.2 DESCRIPTION Perform the following inspection s of the NLG doors actuator shaft assembly .

3.2.1 ACCESS

3.2.1.1 Make sure that the ground locks from the main and nose landing gear are installed in accordance with AMM CA - A - 32 - 00 - 00 - 00A - 912A - A.

3.2.1.2 Put warning notices in the flight compartment to prevent the operation of the hydraulic and landing gear system .

3.2.2 INSPECTION REQUIREME NTS Perform the following inspections in the actuator shaft assembly looking for any evidence of cracks:

3.2.2.1 Inspections of the levers and cams with NLG actuator shaft installed on the aircraft:

A. Perform a Detailed Visual Inspection (DVI) of the levers looking for evidence of cracks. Pay special attention to the castellated area.

B. Perform a Detailed Visual Inspection (DVI) of the cams looking for evidence of cracks. Pay special attention to the castellated area .

NOTE: In case that the detail visual inspection on the castellated area cannot be performed adequately, remove the sealant in order to ensure a correct inspection. After inspection, apply again a cord of sealant Z - 16.160 in according with SRM CA - A - 51 - 24 - 00 - 00A - 259A - A .

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 4 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

3.2.2.2 Inspection of the shaft. Below are detailed differe nt inspection methods, choose the available option to perform the inspection. Depending on the inspection method selected, the repetitive inspection interval is different (see table 02).

A. Perform a Rototest inspection (Non Destructive Inspection (NDT)) for crack on the closed area to the holes in accordance with annex 2 .

B. Perform a Detailed Visual Inspection (DVI) for crack on the closed area to the holes in accordance with annex 3 . Take into account that to carry out this inspection, the NLG door mechanism actuator shaft assembly must be removed to the aircraft.

3.2.3 FINDINGS

3.2.3.1 Findings at the levers and cams Table 03 – Findings at the levers and cams Findings Crack length Action Repetitive interval Condition Interval Presence of cracks (1) in the castellated areas G reater or equal to 18 mm Replace damaged component ( s ) before next flight (2) and contact Airbus Defence and Space reporting the cracks location and its length .

If only the damaged component(s) has (have) been replaced 300 FH Lower than 18 mm Replace the damaged components as soon as possible (2) .

Until the damaged components are replaced 5 FC If only the damaged component(s) has (have) been replaced 300 FH

(1) In order to ensure the correct measure of the cracks, refer to CMM 32 - 21 - 15 depending on applicability, if any component removal is needed.

(2) The components are manufactured and delivered without bolt’s holes. In case the customer does not have means to copy and drill these holes in the new components, Airbus DS recommends replacing the who le actuator shaft assembly P/N 95 - 42315 - 00.

NOTE: If the whole actuator shaft assembly has been replaced, perform the next detailed inspection at 600FH.

NOTE : Air bus DS reminds that for nose landing gear maintenance, the nose jack can be installed without the use of main jacks.

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 5 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

3.2.3.2 Findings at the shaft Table 04 - Findings at the shaft Findings Actions Presence of cracks Replace damaged component before next flight (1) and contact Airbus Defence and Space reporting the cracks location and its length .

(1) The component (shaft) is manufactured and delivered without bolt’s holes. In case the customer does not have resources to copy and drill these holes in the new component, Airbus DS recommends replacing the whole actuator shaft assembly P/N 95 - 42315 - 00.

NOTE: Airbus DS reminds that for nose landing gear maintenance, the nose jack can be installed without the use of main jacks.

The accomplishment of the Service Bulletins SB 2 95 - 32 - 0 005 M will be the terminati ng action to these required repetitive inspections.

3.3 SPARES AND TOOLING To accomplish this AOT , besides the spares and tooling described in referenced tasks, it is necessary the use of the following tooling:

a) Sealant Z - 16.160 b ) Hand help magnifying glass c ) Flashlight

d) NDT Tool:

(1) Instrument: NORTEC 2000 from OLYMPUS

(2) Rotor unit: MiniMite from OLYMPUS

(3) Rototest Probe: SPO - 3564 (0.218 in - 0.250 in) from OLYMPUS (part ID 9217154. 00).

(4) NOTE : Nominal hole d iameter is 6,350 - 6,452mm

(5) Rotor cable: Lemo 16 pin – Lemo 16 pin from Olympus

(6) Calibration standard: P/N 235505, as shown in figure 03.

4. FURTHER INFORMATION

4.1 FOLLOW - UP PLAN N/A

4.2 IMPACTED DOCUMENTATI ON N/A

Page 6OCROpen in PDF

® AIRBUS Reference No.: AOT-C295-32-0001 DEFENCE & SPACE Revision No.: 2 Date 26/10/2016 Alert Operators Transmission ATA Chapter: 32 Page 6/17 Subject: NG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

5. REPORTING Questions about this AOT and inspection results with or without findings are to be sent to Airbus DS Technical Assistance Center (AMTAC):

Telephone: (+34) 91 600 79 99 E-mail: mta.technicalservice@airbus.com ANNEX 1 - FIGURES Cam P/N 95-42315-0401 130- Cam P/N 95-42315-0301 260 300 Lever - 130 P/N 95-42320-0402 270 290 280- Shaft P/N 35-42311-1001 270 Lever P/N 95-42320-0401 Figure 01. Actuator shaft assembly components

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 7 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

Figure 0 2 . Typical damages of the actuator shaft assembly

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 8 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

ANNEX 2 – ROTOTEST INSPECTION REQUIREMENTS

1. Component or area to be inspected (see figure 01 )

A. This procedure covers the inspection of the NLG door Drive Shaft at the holes of the bolts for cam and lever attachment, LH/RH.

B. Twelve holes of the shaft are to be inspected after removal of the two shaft - through bolts for cam attachment (two inner bolts) and for lever attachment (four bolts) as indicated in figure 01 .

NOTE : Check the actuator shaft Assy (see summary in f igure 01 ) to know the thickness of these parts over the shaft .

2. Description of the possible damages (see figure 0 2 )

A. Fatigue cracks starting at the edge of the bolt holes growing radially as shown in figure 02.

B. Cracks will be detectable when equal or greater than 1mm x1mm (0.039 in x 0.039 in) from the inner or outer shaft surfaces .

3. Equipment and mater ials

A. Any equivalent eddy current equipment with scope display/probe combination which satisfies the requirements of this procedure may be used .

B. The equipment used in the development of this procedure was as follows:

a. Instrument: NORTEC 2000 from OLYMPU S

b. Rotor unit: MiniMite from OLYMPUS

c. Rototest Probe: SPO - 3564 (0.218 in - 0.250 in) from OLYMPUS (part ID 9217154. 00).

NOTE : Nominal hole diameter is 6,350 - 6,452mm

d. Rotor cable: Lemo 16 pin – Lemo 16 pin from Olympus

e. Calibration standard: P/N 235505, as shown in figure 03.

4. Preparation for inspection

WARNING : Make sure that all safety procedures are followed to prevent injury to person or damage to the aircraft.

Ensure that necessary warning notices are in position before you start the task.

A. Get direct access to the inspection area by the Nose Landing Gear Bay.

B. Identify the holes to be inspected.

C. Remove the adjust - fit bolts. R efer to CMM 32 - 21 - 15 .

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 9 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

D. Check visually the cam area around the holes to be inspected for cracks, visible corrosion, inclusions, hole ovality or any other discontinuity that may affect the accuracy of the rototest inspection of the shaft inside . Use a flexible mirror if necessary .

5. Instrument calibration (see figure 0 4 )

A. Set the required freque ncy (500kHz)

B. Connect the rotating probe and the rotor unit to the eddy current equipment and follow the manufacturer ́s instructions.

C. Select the appropriate holes in the calibration standard P/N 235505 (6,5 mm diameter) to calibrate the equipment.

D. Set t he instrument to X - Y mode (spot display) .

E. Slowly slide the probe inside the slotted hole of the calibration standard.

F. Adjust the filters to optimize the signal of the slot.

G. Adjust the phase angle to position the signal vertical in the screen.

H. Adjust th e gain to set the signal at 100%FSH.

I. Change to X - T mode and check that noise level is less than 15%FSH when sliding the probe inside the 6,5 mm diameter slot free hole of the calibration standard.

6. Inspection procedure (see figure 0 5 )

A. Ensure that instrument is calibrated in accordance with section 5.

B. Check actuator shaft assy for the thickness of the cam or lever over the shaft. Refer to table of thickness in figure 05 .

C. Switch on the rotor and slowly slide the rotating probe through the hole to b e inspected and ensure that the coil scan the surface of the hole corresponding to the shaft depth.

D. Change to X - Y mode to evaluate any screen indication equal or greater than 50%FSH.

E. Any screen indication equal or greater than 50%FSH vertical or to the r ight of vertical shall be considered a crack .

F. Perform a visual inspection of the hole using mirrors and magnifiers in case of an indication to the left greater than 100% FSH looking for hole ovality, crack or any other damage in the hole.

G. When finding c rack identify the affected component by determining the depth of the crack indication.

H. Follow the manufacturer ́s instruction to set the rotor head position in order to determine the direction of the crack .

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 10 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

7. Acceptance criteria

Any indication vertical o r to the right of vertical equal or greater than 50%FSH shall be considered a crack.

The indications to the left greater than 100% FSH shall be considered as crack if supported by the visual inspection or other NDT inspection.

I n case of findings record the following data:

a. Radial position of the crac k

b. Affected plate

c. Depth to start of the crack

d. Depth of the crack down the bore

e. Amplitude height

f. Phase angle of the crack indication

g. Calibration conditions ( calibration set and phase and sensibility of the sl ot )

8. Final NDT requirements

A. Remove all test equipment from the inspection area.

B. Install the same adjust - fit bolts . R efer to CMM 32 - 21 - 15 .

C. Return the aircraft to original state.

Page 11OCROpen in PDF

© AIRBUS Reference No.: AOT-C295-32-0001 DEFENCE & SPACE Revision No.: 2 Date 26/10/2016 Page 11/17 Alert Operators Transmission ATA Chapter: 32 Subject: NG DOORS MECHANISM ACTUATOR SHAFT INSPECTION Component to be inspected LH CAM LH shown RA symmetrical PER Bolts to be removed to inspect the holes CAM

SECTION X-X SHAFT CAM Area of the bolt hole to be inspected SHAFT Figure 01. Component to be inspected

Reference No.: AOT - C295 - 32 - 0001 Revision No.: 2 Date :

26/10/2016 Alert Operators Transmission Page 12 / 17 ATA Chapter: 32 Subject: NLG DOORS MECHANISM ACTUATOR SHAFT INSPECTION

View of the shaft with possible crack (cam/lever removed just for clarity)

F igure 0 2. Possible Damage