Copy · SB 120-32-A543 · 28 pages

© Embraer S.A. Filed by the FAA in regulations.gov docket FAA-2016-9507; AD 2017-10-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'a58e83bc11d69c75fbd4733c5d4c8cb3da746994876e128fdcd30eea8ae4aa42'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

A L E R T

SERVICE BULLETIN

DATE: Jul 11, 2016 SB No.: 120-32-A543 REVISION No.: PAGE: 1 of 25 Copyright © 2016 by EMBRAER - All rights reserved.

In connection with the use of this document, Embraer does not provide any express or implied warranties and expressly disclaims any warranty of merchantability or fitness for a particular purpose.

This document contains trade secrets, confidential, proprietary information of Embraer and technical d ata subject to U.S. Export administration Regulation ("EAR") and other countri es export control laws and regulations. Diversion c ontrary to the EAR and other laws and regulations is strictly forbidden. The above restrictions may apply to data on all pages of this document.

LANDING GEAR - LIFE LIMITED PART NUMBERS INCLUDED IN MRB HI-200 SECTION 6 – REGISTER VERIFICATION AND CONTROL

1. PLANNING INFORMATION

A. SB EFFECTIVITY

Aircraft affected:

MODEL SN EMB-120( ) All aircraft in operation.

Affected component:

None.

In-production effectivity:

This bulletin does not affect any in-production aircraft.

B. CONCURRENT REQUIREMENTS

None.

A L E R T

SERVICE BULLETIN

SB No.: 120-32-A543 DATE: Jul 11, 2016 PAGE: 2 REVISION No.:

Copyright © 2016 by EMBRAER - All rights reserved.

C. REASON

(1) HISTORY

Embraer has identified the need to consider eight Landing Gear components as Life Limited Parts on MRB HI-200 (Section 6 Part C – Airworthiness Limitations). They were already included in the MRB manual and released as Temporary Revision (28-1) on May 17th, 2016.

Piston Tube PN 19429-000-00 is the one that presents the lowest life-limited among the subjected part numbers, according to MRB -HI-200 Section 6 (Airworthiness limitation).

Since these components were not described in the MRB-HI-200 Section 6, it is possible that some operators were not controlling the accumulated FC of these life-limited parts.

However, these components should not be a concern to those operators who have maintained their fleet in accordance with the applicable Instructions for continued airworthiness and in accordance with maintenance regulations from local authorities.

In order to eliminate this possibility, this SB provides instructions to check for the possible non-controlled part numbers that might be installed in the fleet and take the actions to control them.

(2) OBJECTIVE

To present the instructions to verify the technical documentation/ registers and identify the affected landing gear part numbers, pr ovide the way to control them, when applicable, according to the RBHA/FAR/JAR 25.1 529 regulation (Instructions for Continued Airworthiness).

(3) EXPECTED BENEFITS

To eliminate the possibility of non-controlling the accumulated FC for the affected life-limited part numbers.

(4) REVISION HISTORY

None.

A L E R T

SERVICE BULLETIN

DATE: Jul 11, 2016 SB No.: 120-32-A543 REVISION No.: PAGE: 3 Copyright © 2016 by EMBRAER - All rights reserved.

D. DESCRIPTION

NOTE: The modification presented in this bulletin does not affect Fatigue Critical Structure (FCS).

This Service Bulletin is divided into 03 PARTS, as follows:

PART I VERIFY THE MLG PISTON TUBE PN 19429-000- 00 DOCUMENTATION Applicable to: 1.A.SB EFFECTIVITY

PART I of this bulletin consists of a verification in the MLG (LH/RH) documentation / register to see if the Piston Tube PN 19429-000-00 is installed in each MLG from aircraft.

In case the Piston Tube PN 19429-000-00 is installed in one or both aircraft MLG, the following actions are needed:

- Verify if the original issue of the SB120-032-0514 was accomplished in each affected aircraft MLG.

- As a complementary action, an inspection in the aircraft is possible. For component location refer to Figure 1.

To do this, it is necessary to check the aircraft MLG documentation / records or get access to the main landing gear area.

Refer to the flowchart in section 4.APPENDIX 1, for the decision about the sequence of application of this SB (PART I).

PART II UPDATE THE MLG PISTON TUBE PN 19429-000-00 Applicable to: 1.A.SB EFFECTIVITY

If during the accomplishment of PART I of this SB is verified that the original issue of the SB120-32-0514 was already accomplished, the accomplishment of PART II is no longer required;

If during the accomplishment of PART I of this SB is verified that the original issue of the SB120-32-0514 was not accompIished, the following actions are needed:

- Accomplish SB120-32-0514R01 on the Piston Tube PN 19429-000-00 within their specified limited life according to MRB120-HI-200, Section 6 (TR28-1).

- If the Piston tube PN 19429-000-00 is installed in the aircraft and if it has logged more than their specified limited life according to MRB120-HI-200 (TR28-1), remove and scrap the component before the next flight. In this case the Piston Tube is not in an airworthiness condition and must be scraped.

A L E R T

SERVICE BULLETIN

SB No.: 120-32-A543 DATE: Jul 11, 2016 PAGE: 4 REVISION No.:

Copyright © 2016 by EMBRAER - All rights reserved.

Refer to the flowchart in section 4.APPENDIX 1, for the decision about the sequence of application of this SB (PART II).

PART III VERIFY THE DOCUMENTATION AND CONTROL THE COMPONENTS INCLUDED ON MRB Applicable to: 1.A.SB EFFECTIVITY

PART III of this bulletin consists of a verification in the MLG (LH/RH) and NLG documentation / register to see if the following components are installed in the aircraft.

As complementary action, an inspection in the aircraft is possible. For component location refer to Figure 1.

MLG Piston tube PN 19429-000-00, all serial numbers.

MLG Drag strut, upper half PN 19437-000-00, all serial numbers.

NLG Pin leg hinge PN19919-000-00, all serial numbers.

NLG Piston tube PN 19414-000-00, all serial numbers.

MLG Pin drag strut, lower PN 19699-001-00, all serial numbers.

MLG Pin leg hinge PN 19946-001-00, all serial numbers.

MLG Pin drag strut hinge PN 20031-001-00, all serial numbers.

MLG Pin torque link PN 20030-001-00, all serial numbers.

NOTE: These part numbers are included in the temporary revision 28-1 of the EMB- 120 MRB-HI-200 Section 6 (Airworthiness Limitations).

If they are installed in the aircraft the following actions are needed:

- Search for the accumulated flight cycles in the technical documentation to start the limited-life control.

- If any component has logged more than their specified limited life according to MRB120-HI-200 (TR28-1), remove and scrap the component before the next flight. In this case the component is not in an airworthiness condition.

To do this, it is necessary to check the main and nose landing gears records (documentation) and, in some cases, the components may be removed to certify its part number installation.

Refer to the flowchart in section 4.APPENDIX 1, for the decision about the sequence of application of this SB (PART III).

A L E R T

SERVICE BULLETIN

DATE: Jul 11, 2016 SB No.: 120-32-A543 REVISION No.: PAGE: 5 Copyright © 2016 by EMBRAER - All rights reserved.

E. COMPLIANCE

(1) APPLICABLE TO PART I

Embraer recommends the accomplishment of PART I of this bulletin within the next ten (10) days, from the first issue date of this bulletin.

(2) APPLICABLE TO PART II

- If the piston tube PN 19429-000-00 is installed i n the aircraft and if it has logged less than their specified limited life according to MRB120-HI-200 (TR28-1), the accomplishment of PART II (SB120-32-0514R01) is required before the component reaches its life limit.

- If the piston tube PN 19429-000-00 is installed in the aircraft and if it has logged more than their specified limited life according to MRB120-HI-200 (TR28-1), the component must be replaced before the next flight.

NOTE: The life limit can be different according to the customer’s authority. See the limits as per certification on section 6 of MRB120-HI-200 (TR28-1).

(3) APPLICABLE TO PART III

Embraer recommends the accomplishment of PART III of this bulletin in the next suitable maintenance opportunity, not exceeding the next landing gear restoration.

F. APPROVAL

The technical aspects of this Alert Service Bulleti n are approved by: Embraer – Engineering Board.

G. COMMUNICATIONS TO EMBRAER

EMBRAER requests that any results found during these verifications be informed to your local EMBRAER representatives or offices.

A L E R T

SERVICE BULLETIN

SB No.: 120-32-A543 DATE: Jul 11, 2016 PAGE: 6 REVISION No.:

Copyright © 2016 by EMBRAER - All rights reserved.

H. ESTIMATED MANPOWER

This is an estimate of the manpower necessary to ac complish this Service Bulletin on a single aircraft.

It is intended for direct labor only, performed by experienced personnel, and does not include the time to plan, prepare, or inspect t he work. Sealant, paint, or adhesive curing times are not included either.

It is assumed that all the tools, parts, and other means are readily available when necessary.

An adjustment to these values may be necessary to meet particular circumstances.

(1) APPLICABLE TO PART I:

- Access opening: None.

- Register Verification: 1.0 man-hour.

- Modification: None.

- Access Closure: None.

- Test: None.

NOTE: If it is necessary to remove the Piston Tube, the estimated modification manpower will be increased by 6.0 man-hours.

(2) APPLICABLE TO PART II:

- Access opening: None.

- Register Verification: 1.0 man-hour.

- Modification: None.

- Access Closure: None.

- Test: None.

NOTES: 1) If it is necessary to remove the Piston Tube, the estimated modification manpower will be increased by 6.0 man-hours.

2) This estimated manpower do not include the time necessary to accomplish the SB120-032-0514R01.

A L E R T

SERVICE BULLETIN

DATE: Jul 11, 2016 SB No.: 120-32-A543 REVISION No.: PAGE: 7 Copyright © 2016 by EMBRAER - All rights reserved.

(3) APPLICABLE TO PART III:

- Access opening: None.

- Register Verification: 1.0 man-hour.

- Inspection: 5.0 man-hours.

- Modification: None.

- Access Closure: None.

- Test: None.

NOTE: When it is necessary to remove some components to identify its part number, the estimated modification manpower will be increased by 4.0 man-hours per each removed part number.

I. WEIGHT AND BALANCE

None.

J. REFERENCES

CMM Vendor Component Maintenance Manual – 32-12-01 – LH-RH MAIN LEG ASSEMBLY.

CMM Vendor Component Maintenance Manual – 32-31-01 – MAIN LANDING GEAR STRUT.

CMM Vendor Component Maintenance Manual – 32-21-01 – NOSE LANDING GEAR LEG.

M.M. 120( )/( ) Maintenance Manual – Chapter 32-00 -01 – Landing Gear Ball- Lock Pins – Maintenance Practices.

M.M. 120( )/( ) Maintenance Manual – Chapter 32-11 -01 – MLG Wheel/Oleo Strut – Removal/Installation.

M.M. 120( )/( ) Maintenance Manual – Chapter 32-11 -02 – Main Drag and Locking Strut – Removal/Installation.

A L E R T

SERVICE BULLETIN

SB No.: 120-32-A543 DATE: Jul 11, 2016 PAGE: 8 REVISION No.:

Copyright © 2016 by EMBRAER - All rights reserved.

M.M. 120( )/( ) Maintenance Manual – Chapter 32-21 -01 – Nose Landing Gear Oleo Strut - Removal/Installation.

MESSIER-DOWTY S.B. 120-032-0514 – LANDING GEAR – IMPROVEMENT TO MAIN LANDING GEAR PISTON TUBE.

MRB Maintenance Review Board – HI – 200 – Section 6 – AIRWORTHNESS LIMITATIONS, Temporary Revision 28-1.

K. AFFECTED PUBLICATIONS

MRB Maintenance Review Board – HI – 200 – Section 6 – AIRWORTHNESS LIMITATIONS, Temporary Revision 28-1.

2. MATERIAL INFORMATION

A. MATERIAL – PRICE AND AVAILABILITY

(1) MATERIAL AVAILABLE FROM EMBRAER

None.

(2) MATERIAL AVAILABLE FROM OTHER VENDORS

None.

B. INDUSTRY SUPPORT INFORMATION

None.

C. MATERIAL NECESSARY FOR EACH AIRCRAFT

When applicable, the use of alternative or similar parts in place of the one specified in the kits is allowable, provided that these alternative or similar parts are approved by Embraer as indicated in the related Embraer Technical Publications or through a formal Embraer communication channel.

The necessary expendable or consumable parts presented in the AMM Tasks referred to in this bulletin should be procured from the operator’s inventories or ordered as spares.

A L E R T

SERVICE BULLETIN

DATE: Jul 11, 2016 SB No.: 120-32-A543 REVISION No.: PAGE: 9 Copyright © 2016 by EMBRAER - All rights reserved.

The complementary information, when necessary, is presented as Notes in the respective Table.

(1) TOP KITS AND KITS

None.

(2) MATERIAL TO BE PROCURED

(a) Parts

None.

(b) Consumable Materials

None.

D. MATERIAL NECESSARY FOR EACH SPARE

None.

E. REIDENTIFIED PARTS

None.

F. TOOLING – PRICE AND AVAILABILITY

Whenever required, the necessary tooling presented in the AMM Tasks referred to in this bulletin, should be procured from the opera tor's inventories or ordered as spares.

A L E R T

SERVICE BULLETIN

SB No.: 120-32-A543 DATE: Jul 11, 2016 PAGE: 10 REVISION No.:

Copyright © 2016 by EMBRAER - All rights reserved.

ACCOMPLISHMENT INSTRUCTIONS

NOTES: 1) For the purpose of this Service Bulletin, a Spe cial Detailed Inspection (SDI) is: “An intensive examination of a specific i tem, installation, or assembly to detect damage, failure or irregularity. The examination is likely to make extensive use of specialized Inspect ion Techniques and/or equipment. Intricate cleaning and substantial acces s or disassembly procedure may be required.”

2) Obey all of the WARNINGS and CAUTIONS included i n the referenced manuals and procedures.

3) The Manuals and other documents are referred to by means of acronyms or using a simplified form. Refer to section “1. I. REFERENCES” for a more complete definition.

4) This Service Bulletin is divided into 03 PARTS. The SB P ARTS division allows their independent accomplishment with except ion to the Piston Tube PN 19429-000-00 that needs to accomplish the P ART I prior to PART II and III.

The steps below outline the general accomplishment instructions.

The detailed sequence is included in the respective figure, when necessary.

A. Make sure that the aircraft is safe for maintenance.

WARNING: MAKE SURE THAT THE SAFETY PINS OF THE LAND ING GEAR ARE CORRECTLY INSTALLED. REFER TO MAINTENANCE MANUAL – CHAPTER 32-00-01 – LANDING GEAR.

B. Install the landing gear safety pins. Refer to t he applicable Maintenance Manual - Chapter 32-00-01 – Landing Gear.

A L E R T

SERVICE BULLETIN

DATE: Jul 11, 2016 SB No.: 120-32-A543 REVISION No.: PAGE: 11 Copyright © 2016 by EMBRAER - All rights reserved.

C. PART I – VERIFY THE MLG PISTON TUBE PN 19429-000-00 DOCUMENTATION

(1) Verify on the technical documentation and to th e register to make sure that the Piston Tube PN 19429-000-00 is installed in the air craft MLG (LH/RH). As complementary action an inspection in the aircraft is possible. For component location refer to Figure 1.

NOTE: The PART I is only applicable to PN 19429-000-00. Do not take action in other Piston Tube part numbers (example: PN 19429-001-01).

a. If the Piston Tube PN 19429-000-00 is not instal led in the aircraft, no action is required. Record the SB accomplished in the applicable documents.

b. If the Piston Tube PN 19429-000-00 is installed in the aircraft, verify on the technical documentation and register to confirm if the SB120-032-0514 was accomplished.

NOTE: It is possible to physically identify if the SB120-032-0514 was accomplished according to DET. X of the Figure 1.

I. If the SB120-032-0514 was accomplished, do the P ART III of this bulletin to the Piston Tube PN 19429-000-00 to prov ide its limited-life control.

II. If the SB120-032-0514 was not accomplished, do the PART II of this bulletin to the Piston Tube PN 19429-000-00 to prov ide its update, if applicable.

A L E R T

SERVICE BULLETIN

SB No.: 120-32-A543 DATE: Jul 11, 2016 PAGE: 12 REVISION No.:

Copyright © 2016 by EMBRAER - All rights reserved.

D. PART II – UPDATE THE MLG PISTON TUBE PN 19429-000-00

(1) Verify on the technical documentation and to th e register to make sure that their limited life is according to MRB HI-200 section 6 (TR 28-1) since new.

a. If the limited life (FC) of the Piston Tube is a ccording to MRB HI-200 section 6 (TR 28-1), accomplish the SB120-032-0514R01 withi n its life-limit and do the PART III of this bulletin to the Piston Tube Po st-Mod SB120-032- 0514R01 to control its limited-life.

b. If the limited life (FC) of the Piston Tube is n ot according to MRB HI-200 section 6 (TR 28-1), do as follows:

a) Remove and scrap the Piston Tube (PN 19429-000-0 0 only) before the next flight. Refer to MM 32-11-01-4 and CMM 32-12-01.

NOTE: In this case the Piston Tube is not in an airworthiness condition.

Pages 13–24 of 28