Copy · Embraer SB190E2-27-0026 Rev 05 · 60 pages

© Embraer S.A. Filed by the FAA in regulations.gov docket FAA-2023-2153, the docket of AD 2023-23-09. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '4d0d673abd1c0e15e0a281fb06acb04709ebf368b9897016ada28125c68b4c24'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

1. DESCRIPTION This sheet informs about Revision 05 to the Service Bulletin 190E2-27-0026.

This is a complete reissue of this Service Bulletin.

2. ADDITIONAL ACTION Aircraft that have complied with the previous issue of this bulletin do not need any additional action.

3. RECORD OF REVISION Basic issue: Feb 17, 2023 Revision 01: Feb 28, 2023 Revision 02: Mar 21, 2023 Revision 03: Mar 29, 2023 Revision 04: Apr 17, 2023 Revision 05: Apr 26, 2023

4. HIGHLIGHTS The topics, affected pages and a brief description of the content-related changes introduced by this revision are presented below.

Revision bars are shown in the left margin of each page to show where significant changes were made. Text displacement and text format changes are not indicated.

TOPIC / PAGE DESCRIPTION OF REVISION

1. PLANNING INFORMATION

1.A. SB EFFECTIVITY / 01 Updated effectivity.

1.C. REASON / 02 Added reason for Revision 05.

1.D. DESCRIPTION / 04 Updated note.

1.E. COMPLIANCE / 04 Updated compliance information.

3. ACCOMPLISHMENT INSTRUCTIONS/ 14 thru 17, 21, 22, 26 and 27 Updated instructions.

Figure 7 / 54, 55, 57, and 58 Updated information

TRANSMITTAL LETTER Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 SB190E2-27-0026 Page 1 of 1 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

No text on this page: it may be a figure. Open the PDF to see it.

FLIGHT CONTROLS - AILERON BACKLASH INSPECTION In connection with the use of this document, Embraer S.A. does not provide any express or implied warranties and expressly disclaims any warranty of merchantability or fitness for a particular purpose.

This document contains trade secrets, information and technology confidential, proprietary of Embraer S.A., which may not be transferred, distributed, or disclosed, in whole or in part, to any party, without express permission from Embraer S.A.

The above restrictions apply to information and technologies on all pages of this document.

1. PLANNING INFORMATION A. SB EFFECTIVITY Aircraft affected:

MODEL SN E195-E2 All aircraft in operation.

In-production effectivity:

None.

B. CONCURRENT REQUIREMENTS None.

C. REASON

(1) HISTORY During the 10,000 Flight Hours (FH) functional test of the aileron control system backlash, the assembly bearings of the aileron surface showed a wear above the expected. This Service Bulletin gives an inspection to validate the wear pattern curve over life.

(2) OBJECTIVE To give the instructions to do the functional test of the aileron control system backlash, and if necessary, to replace the bearings and press-fitted bushings with new ones (same part numbers or oversize ones, as applicable).

(3) EXPECTED BENEFITS The results from of the inspection will provide an accurate database for Embraer engineering assessments.

(4) REVISION HISTORY

SERVICE BULLETIN Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 SB190E2-27-0026 Page 1 of 58 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

REVISION 01:

This revision has been issued to:

– Include aircraft SN 19020045, 19020047, 19020051, 19020054, 19020060 thru 19020067, 19020076, and 19020084 in the service bulletin effectivity.

– Revise requirement for part II from 200 Flight Hours (FH) to 100 Flight Hours (FH).

– Include alternative AMM procedure and tools.

– Update internal diameter values.

REVISION 02:

This revision has been issued to:

– Include aircraft SNs 19020023, 19020024, 19020027, 19020048, and 19020056.

– Split bulletin in four PARTS.

– Add the bushings GVI and dimensional check between aileron surface and hinge fittings.

REVISION 03:

This revision has been issued to:

– Updated the note of Description.

– Updated the note of Accomplishment Instructions.

REVISION 04:

This revision has been issued to:

– Update the parts to be removed, inspected, discarded and retained during this bulletin accomplishment.

– Add oversize press-fitted bushings, tooling and procedure for their installation.

REVISON 05: This revision has been issued to:

– Update effectivity.

– Update compliance information.

– Revise accomplishment instructions.

– Update figure information.

D. DESCRIPTION NOTE: The activities related to this Service Bulletin must be witnessed by Embraer personnel on site.

This Bulletin is divided into 4 PARTS, as follows:

PART I LH AILERON - FUNCTIONAL TEST OF THE AILERON CONTROLSYSTEM BACKLASH Applicable to: 1.A. SB EFFECTIVITY The inspection presented in PART I of this bulletin consists of doing:

SERVICE BULLETIN SB190E2-27-0026 Page 2 of 58 Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

(1) The GVI of the bushings of the LH aileron.

(2) Dimensional check between LH aileron surface and hinge fittings.

(3) Functional test of the aileron backlash on the LH aileron.

To get access to the work area, it is necessary to remove access panels 583AB, 583BB, 583CB, 584AB, and 584BB.

PART II RH AILERON - FUNCTIONAL TEST OF THE AILERON CONTROLSYSTEM BACKLASH Applicable to: 1.A. SB EFFECTIVITY The inspection presented in PART II of this bulletin consists of doing:

(1) The GVI of the bushings of the RH aileron.

(2) Dimensional check between RH aileron surface and hinge fittings.

(3) Functional test of the aileron backlash on the RH aileron.

To get access to the work area, it is necessary to remove access panels 683AB, 683BB, 683CB, 684AB, and 684BB.

PART III LH WING AND LH AILERON - REPLACEMENT OF THE BEARINGSAND BUSHINGS INSPECTION Applicable to: 1.A. SB EFFECTIVITY The modification presented in PART III of this bulletin consists of:

(1) Replacing the bearings of the wing fittings.

(2) Dimensional check of the sliding bushings.

(3) Dimensional check and inspection of the press-fitted bushings of the aileron fittings, and if necessary, installation of new press-fitted bushing(s) (same PN or oversize ones).

(4) Functional test of the aileron backlash.

To get access to the work area, it is necessary to remove the aileron surface.

PART IV RH WING AND RH AILERON - REPLACEMENT OF THE BEARINGSAND BUSHINGS INSPECTION Applicable to: 1.A. SB EFFECTIVITY The modification presented in PART IV of this bulletin consists of:

(1) Replacing the bearings of the wing fittings.

(2) Dimensional check of the sliding bushings.

(3) Dimensional check and inspection of the press-fitted bushings of the aileron fittings, and if necessary, installation of new press-fitted bushing(s) (same PN or oversize ones).

(4) Functional test of the aileron backlash.

SERVICE BULLETIN Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 SB190E2-27-0026 Page 3 of 58 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

To get access to the work area, it is necessary to remove the aileron surface.

NOTE: The modification presented in this bulletin affects Fatigue Critical Structure (FCS); however, no change to the related Damage Tolerance Inspection (DTI) instructions is required.

E. COMPLIANCE

1) SB CATEGORY Category 02: RECOMMENDED

(1) SB ACCOMPLISHMENT

(a) Embraer recommends the accomplishment of this service bulletin as follows:

– To all aircraft which have logged 6,000 FH or above: Within the next 750 FH.

– To all aircraft which have logged 5,000 FH or above and less than 6,000 FH: Perform the SB in the next 1,000 FH or before it reaches 6,750 FH whichever occurs first.

– To all aircraft which have logged 3,000 FH or above and less than 5,000 FH: Perform the SB in the next 2,000 FH or before it reaches 6,000 FH whichever occurs first.

– To all aircraft which have logged less than 3,000 FH: Perform the SB in the next 3,000 FH or before it reaches 5,000 FH whichever occurs first.

(b) Embraer recommends the accomplishment of this service bulletin at every 3,000 FH from last accomplishment of this SB or from last accomplishment of task number 27-12-01-007, from E-JETS E2 - MRB 5881 APPENDIX A - PART 1 - CERTIFICATION MAINTENANCE REQUIREMENTS.

F. APPROVAL The changes to the type design specified in this Service Bulletin have been approved by Agência Nacional de Aviação Civil (ANAC).

NOTE: If any aircraft listed in the SB effectivity has an incorporated modification or repair that is not from EMBRAER and which affects the content of this Service Bulletin, the operator will take full responsibility for obtaining approval by a regulatory agency for any adaptation necessary before the incorporation of this Service Bulletin.

G. ESTIMATED MANPOWER This is an estimate of the manpower necessary to accomplish this Service Bulletin on a single aircraft.

It is intended for direct labor only, performed by experienced personnel and does not include the time to plan, prepare or inspect the work. Sealant, paint or adhesive curing times are not included either.

It is assumed that all the tools, parts and other means are readily available when necessary.

An adjustment to these values may be necessary to meet particular circumstances.

(1) APPLICABLE TO PARTS I AND II – Access opening: 0.5 man-hours.

SERVICE BULLETIN SB190E2-27-0026 Page 4 of 58 Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

– Inspection: 1.0 man-hour for AMM TASK 27-10-00-720-801-A/500 - Aileron Control System Backlash - Functional Test or 5.0 man-hours for AMM TASK 27-10-00-720-803-A/500 - Aileron Control System Backlash (Manual) - Functional Test.

– Modification: None.

– Access closure: 0.5 man-hours.

– Test: 1.5 man-hours.

(2) APPLICABLE TO PARTS III AND IV – Access opening: 1.0 man-hour.

– Inspection: 2.0 man-hours.

– Modification: 6.0 man-hours.

– Access closure: 1.5 man-hours.

– Test: 1.5 man-hours.

NOTE: If the installation of oversize press-fitted bushing is necessary, which will require housing enlargement, add 1.0 man-hour for each lug to be reworked.

H. WEIGHT AND BALANCE None.

I. ELECTRICAL LOAD DATA Not changed.

J. SOFTWARE ACCOMPLISHMENT SUMMARY None.

K. REFERENCES AMM 190E2/( ) Aircraft Maintenance Manual PART II - 06-44-00 - DIMENSIONS ANDAREAS.

AMM 190E2/( ) Aircraft Maintenance Manual PART II - 20-00-00 and 20-10-07 - STANDARDPRACTICES-AIRFRAME.

AMM 190E2/( ) Aircraft Maintenance Manual PART II - 27-10-00, 27-11-03, and 27-12-01 -FLIGHT CONTROLS.

FIM 190E2/( ) Fault Isolation Manual - 27-10-00 - FLIGHT CONTROLS.

NDT 190E2/( ) Nondestructive Testing Manual - Part 6 - 51 - STANDARD PRACTICESAND STRUCTURES.

SRM 190E2/( ) Structural Repair Manual Part II - 51-21-01 and 51-21-02 - STANDARDPRACTICES AND STRUCTURES.

L. OTHER PUBLICATIONS AFFECTED None.

SERVICE BULLETIN Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 SB190E2-27-0026 Page 5 of 58 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

2. MATERIAL INFORMATION A. MATERIAL - PRICE AND AVAILABILITY

(1) MATERIAL AVAILABLE FROM EMBRAER

(a) Applicable to PARTS I AND II None.

(b) Applicable to PART III AND IV Refer to 2.C. MATERIAL NECESSARY FOR EACH AIRCRAFT.

(2) MATERIAL AVAILABLE FROM OTHER VENDORS None.

B. INDUSTRY SUPPORT INFORMATION None.

C. MATERIAL NECESSARY FOR EACH AIRCRAFT When applicable, the use of alternative or similar parts is allowed, once it is approved by Embraer as indicated in the related Embraer Technical Publications or through a formal Embraer communication channel.

The necessary expendable or consumable parts presented in the AMM Tasks mentioned in this bulletin can be acquired from the operator's inventories or ordered as spares.

When necessary, additional information is presented as Notes in the respective Table.

(1) TOP KITS AND KITS None.

(2) MATERIAL TO BE PROCURED

(a) Parts The parts below, applicable to PART III and IV, should be procured from the operator’s inventories or from Embraer.

NEW PN DESCRIPTION OLD PN QTY DISP/Notes PE64069B07P046-24 6-20 Press-Fitted Bushing PE64069B07P046-2 46-20 10 6 / [1] PE64069B07P046-24 6-20X Press-Fitted Bushing 1st Oversize 10 6 / [1] PE64069B07P046-24 6-20Y Press-Fitted Bushing 2nd Oversize 10 6 / [1] [1] New press-fitted bushing (original PN or oversize PN) must be installed only if the previous installed one does not satisfy the inspection and dimensional check criteria.

SERVICE BULLETIN SB190E2-27-0026 Page 6 of 58 Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

(Continued) NEW PN DESCRIPTION OLD PN QTY DISP/Notes PE64069CA07P088-2 00-20 Press-Fitted Bushing PE64069CA07P088- 200-20 02 6 / [1] PE64069CA07P088-2 00-20X Press-Fitted Bushing 1st Oversize 02 6 / [1] PE64069CA07P088-2 00-20Y Press-Fitted Bushing 2nd Oversize 02 6 / [1] PE64069B06P036-23 0-16 Press-Fitted Bushing PE64069B06P036-2 30-16 08 6 / [1] PE64069B06P036-23 0-16X Press-Fitted Bushing 1st Oversize 08 6 / [1] PE64069B06P036-23 0-16Y Press-Fitted Bushing 2nd Oversize 08 6 / [1] PE64069B08P096-26 0-20 Press-Fitted Bushing PE64069B08P096-260-20 04 6 / [1] PE64069CA08P096-2 10-20 Press-Fitted Bushing PE64069CA08P096-210-20 04 6 / [1] MS24665-302 Cotter pin MS24665-302 14 7 PE22078L8 Nut PE22078L8 04 7 PE22078L7 Nut PE22078L7 06 7 PE22078L6 Nut PE22078L6 04 7 NAS6707D36 Bolt NAS6707D36 02 6 / [2] NAS6707D25 Bolt NAS6707D25 04 6 / [2] NAS6706D38 Bolt NAS6706D38 04 6 / [2] NAS6708D36 Bolt NAS6708D36 04 6 / [2] PE64070P07-207 Sliding Bushing PE64070P07-207 04 6 / [2] PE64070P08-160 Sliding Bushing PE64070P08-160 04 6 / [2] PE64070P07-116 Sliding Bushing PE64070P07-116 06 6 / [2] PE64070P06-222 Sliding Bushing PE64070P06-222 08 6 / [2] NAS1149C0763R Washer NAS1149C0763R 24 6 / [2] NAS1149C0863R Washer NAS1149C0863R 16 6 / [2] NAS1149C0663R Washer NAS1149C0663R 16 6 / [2] MS14103-7AP Bearing MS14103-7AP 06 7 MS14103-6P Bearing MS14103-6P 04 7 [1] New press-fitted bushing (original PN or oversize PN) must be installed only if the previous installed one does not satisfy the inspection and dimensional check criteria.

[2] This part must be replaced by a new one only if any discrepancy is found on the previous installed one.

(b) Consumable Materials The consumables below, applicable to PARTS III and IV, should be procured from the operator’s inventories or from Embraer.

SERVICE BULLETIN Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 SB190E2-27-0026 Page 7 of 58 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

Applicable to PARTS III and IV NEW PN DESCRIPTION OLD PN QTY DISP/Notes COR-BAN 27L

COMPOUND,

CORROSION-

INHIBITING

- AR 6/ [1] AEROSHELL 33 GREASE,SYNTHETIC - AR 6/ [2] NAFTOSEAL MC 780 C-2 SEALANT - AR 6/ [3] 2007B002AM654SK SEALANT - AR 6/ [4] MEK METHYL ETHYLKETONE - AR 6/ [5] [1] Corrosion Inhibiting Compound (MEP_09-075) COR-BAN 27L [2] Synthetic Grease (MIL-PRF-23827) AEROSHELL 33 [3] Polysulfide Interfaying Sealant Type I Cl 2 (MEP_09-084) NAFTOSEAL MC 780 C-2 [4] Polysulfide Sealant (AMS3281) 2007B002AM654SK [5] Methyl Ethyl Ketone (ASTM D740) MEK DISPOSITION: 6 = Apply as required 7 = Replace with part bearing same PN QUANTITY: AR = As Required

(c) Kit Updating None.

D. MATERIAL NECESSARY FOR EACH SPARE None.

E. REIDENTIFIED PARTS None.

F. TOOLING - PRICE AND AVAILABILITY Whenever required, the necessary tooling presented in the AMM Tasks mentioned in this bulletin, should be procured from the operator’s inventories or ordered as spares.

(1) The following tooling are required to perform the backlash test of PARTS I, II, III, and IV of this bulletin.

BACKLASH TOOLING

ITEM PN DESCRIPTION ECODE914578 BACKLASH SIT TEST STATION [1] ECODE915150 ELECTRIC CABLE FOR ACTUATOR [1] ECODE915194 ELECTRICAL CABLE FOR LOAD CELL [1] ECODE915227 ACQUISITION ELECTRIC CABLE [1] ECODE1672678 DISPLACEMENT SENSOR [1] [1] Applicable to AMM TASK 27-10-00-720-801-A/500 - Aileron Control System Backlash - Functional Test.

SERVICE BULLETIN SB190E2-27-0026 Page 8 of 58 Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

BACKLASH TOOLING (Continued)

ITEM PN DESCRIPTION EC1-AKM11B-CNC-40-03B-100- MS6M-MT1M-C0 LINEAR ACTUATOR [1] CSAZL-100 LOAD CELL [1] 196M42451-701-30H1 SET OF MECHANICAL FORCE APPLICATIONDEVICES [1]

905.1301.10 DIGITAL DIAL INDICATOR [2]

805.1301.10 DIGITAL DIAL INDICATOR [2] AGE-01616-401 KIT - BACKLASH MEASUREMENT, HORIZONTALSTABILIZER [2] AGE-01616-403 KIT - BACKLASH MEASUREMENT, HORIZONTALSTABILIZER [2] AGE-01629-401 DEVICE - BACKLASH MEASUREMENT [2] DPPH-100KG MECHANICAL FORCE GAUGE [2] AGE-01623-401 SET - BACKLASH MEASUREMENT, ELEVATOR /AILERON [2] AGE-04267-401 SET - BACKLASH MEASUREMENT, ELEVATOR /AILERON [2] 6635-00-867-0516 MECHANICAL FORCE GAUGE [2] DMG-500 MECHANICAL FORCE GAUGE [2] AGE-04134-401 SET- BACKLASH MEASUREMENT, HORIZ STAB [2] DG-100KG MECHANICAL FORCE GAUGE [2] [1] Applicable to AMM TASK 27-10-00-720-801-A/500 - Aileron Control System Backlash - Functional Test.

[2] Applicable to AMM TASK 27-10-00-720-803-A/500 - Aileron Control System Backlash (Manual) - Functional Test.

(2) The tooling presented below (or equivalent) are required for the accomplishment of PARTS III and IV of this bulletin if oversize press-fitted bushings are required. They should be procured

SERVICE BULLETIN Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 SB190E2-27-0026 Page 9 of 58 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

from Embraer. Commercial condition is chargeable and Order Desk shall be contacted for price and EDD (estimated delivery date) information.

NOTE: As some of these tooling are cutting tools, they will worn along their usage. Periodic inspection of the tooling blades and diameter must be performed to make sure that they are ready for use. If not, replace them with new ones.

OVERSIZE TOOLING

ITEM PN DESCRIPTION QTY SUPPLIER T042/23 REAMER, AILERON INBD / OUTBD HINGE 1AND 2 - FIRST OVER 19.975H7 01 Embraer T040/23 REAMER, AILERON OUTBD HINGE 3 - FIRSTOVER 19.975H7 01 Embraer T043/23 REAMER, AILERON INBD HINGE 3 - FIRSTOVER 15.212H7 01 Embraer T041/23 REAMER, AILERON INBD / OUTBD HINGE 4AND 5 - FIRST OVER 17.963H7 01 Embraer T048/23 REAMER, INBD ACTUATOR - FIRST OVER16.810H7 01 Embraer T050/23 REAMER, OUTBD ACTUATOR - FIRST OVER21.563H7 01 Embraer T044/23 REAMER, AILERON INBD / OUTBD HINGE 1AND 2 - SECOND OVER 20.475H7 01 Embraer T046/23 REAMER, AILERON OUTBD HINGE 3 -SECOND OVER 20.475H7 01 Embraer T047/23 REAMER, AILERON INBD HINGE 3 - SECONDOVER 15.712H7 01 Embraer T045/23 REAMER, AILERON INBD /OUTBD HINGE 4AND 5 - SECOND OVER 18.463H7 01 Embraer T049/23 REAMER, INBD ACTUATOR - SECOND OVER17.310H7 01 Embraer T051/23 REAMER, OUTB ACTUATOR - SECOND OVER22.063H7 01 Embraer - Adjustable Expansive Roller Burnishing Tool Diameter Range: 15.875 to 15.893 mm (0.6250 to

0.6257 in) 01 Comm ercially Availab le - Adjustable Expansive Roller Burnishing Tool Diameter Range: 11.112 to 11.130 mm (0.4375 to

0.4382 in) 01 Comm ercially Availab le - Adjustable Expansive Roller Burnishing Tool Diameter Range: 14.288 to 14.306 (0.5625 to

0.5632 in) 01 Comm ercially Availab le

SERVICE BULLETIN SB190E2-27-0026 Page 10 of 58 Date: Feb 17, 2023 Revision No.: 05 - Apr 26, 2023 Copyright © by Embraer S.A. All rights reserved - See title page for detail.

Pages 13–24 of 60