Copy · Service Bulletin - 190LIN-53-0059 · 28 pages

© Embraer S.A. Filed by the FAA in regulations.gov docket FAA-2013-0092; AD 2013-16-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '2415ef6ff33d695d93216f9aee5983a871203c28c7acfbe85dd20a06206832b9'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

1. DESCRIPTION This sheet transmits Revision 01 to Service Bulletin 190LIN-53-0059.

This is a complete reissue of the Bulletin.

This revision incorporates the information presented in the Information Notice related to the previous issues of this Service Bulletin, as listed below:

None.

2. ADDITIONAL ACTION Aircraft that have complied with the entire previous issue of this bulletin do not need any additional action.

3. RECORD OF REVISION Basic issue: 29/Mar/2011.

Revision 01: 16/Mar/2012.

4. HIGHLIGHTS The topics, affected pages, and a brief description of the content-related changes introduced by this revision are presented below.

Revision bars are put in the left margin of each page to show the location of the significant changes. Text displacement and text format changes are not indicated.

TOPIC/PAGE DESCRIPTION OF REVISION

1. PLANNING INFORMATION

1.A. SB EFFECTIVITY/01 and 02 Updated Reason and added reason of revision 01.

1.D. DESCRIPTION/02 and 03 Splited Description into two parts.

1.E. COMPLIANCE/03 and 04 Splited Compliance into two parts.

1.G. ESTIMATED MANPOWER/04 and 05 Splited Estimated Manpower into two parts.

1.H. WEIGHT AND BALANCE/05 Splited Weight and Balance into two parts.

1.J. REFERENCES/05 and 06 Updated References.

2. MATERIAL INFORMATION/07 thru 10 Updated Material Information.

3. ACCOMPLISHMENT INSTRUCTIONS/11 thru 13 Updated Accomplishment Instructions into two parts.

Figure 1/15 thru 18 Updated Figure 1.

Figure 2/19 thru 23 Updated Figure 2.

Figure 3/24 and 25 included Figure 3.

TRANSMITTAL LETTER SB No.: 190LIN-53-0059 PAGE: 1 of 1 Copyright © 2012 by Embraer S.A. All rights reserved.

EMPRESA BRASILEIRA DE AERONÁUTICA S/A - SÃO JOSÉ DOS CAMPOS - SP

SERVICE NEWSLETTER SNL 145-31-0011 DATE: 26/Aug/04 PAGE: 2 of 1 CHANGE No.: __ - __/___/__

FUSELAGE - INSPECTION AND PROTECTION FOR HARNESS W205

1. PLANNING INFORMATION A. SB EFFECTIVITY Aircraft affected:

MODEL SN EMBRAER 190 ECJ 19000109, 19000140, 19000159, 19000177, 19000203, 19000225, 19000236, 19000243, 19000261, and 19000296.

Affected component:

None.

In-production effectivity:

Embraer 190 ECJ model aircraft SN 19000278, 19000307, 19000317, 19000362, 19000438 and on, have an equivalent modification factory-incorporated.

B. CONCURRENT REQUIREMENTS None.

SERVICE BULLETIN DATE: 29/Mar/2011 REVISION No.:01 - 16/Mar/2012 SB No.: 190LIN-53-0059 PAGE: 1 of 24 Copyright © 2012 by Embraer S.A. All rights reserved.

C. REASON

(1) HISTORY Instances have been reported concerning chafing between the APU ESC (Electronic Starter Controller) power cables (harness W205) and the tail cone firewall.

This chafing occurs because the existing grommet installed in the tail cone firewall, intended to avoid contact between the APU ESC power cables and the tail cone firewall, moves out of place.

This may cause damage to the APU ESC power cables.

(2) OBJECTIVE To provide instructions to inspect the APU ESC power cables (harness W205) and to install a new grommet support in the tail cone firewall.

(3) EXPECTED BENEFITS This modification is aimed at keeping the grommet in the correct position to prevent damage to the APU ESC power cables. Thus, the protection of the APU ESC power cables will be improved as a consequence.

(4) REVISION HISTORY REVISION 01: This revision has been issued to include new conditions related to the inspection mentioned in this Service Bulletin.

D. DESCRIPTION This Bulletin is divided into 2 PARTS, as follows:

PART I INSPECTION AND PROTECTION FOR HARNESS W205 Applicable to: Refer to 1.A. SB EFFECTIVITY.

PART I of this bulletin consists in performing a detailed visual inspection for damage on the APU ESC power cables (Harness W205) and installing a support in the tail cone firewall.

During the inspection, the criteria below should be followed :

SERVICE BULLETIN SB No.: 190LIN-53-0059 PAGE: 2 DATE: 29/Mar/2011 REVISION No.: 01 - 16/Mar/2012 Copyright © 2012 by Embraer S.A. All rights reserved.

(1) If no damage is detected to the APU ESC power cables, only a support installation in the tail cone firewall is required;

(2) If there is any sign of damage to the APU ESC power cables, and if the damage only affects the harness insulation, it is necessary to repair the harness insulation and to install a support in the tail cone firewall.

(3) If there is any sign of damage to the APU ESC power cables, and if the damage affects the harness insulation and the wire strands (inner conductors), it is necessary to install a support in the tail cone firewall and then, replace the harness W205 as described in PART II of this Service Bulletin.

To do this, it is necessary to gain access to the work area by removing the tail cone access panel 351GL, and the air inlet silencer, located in zone 351.

PART II HARNESS W205 REPLACEMENT Applicable to: Refer to 1.A. SB EFFECTIVITY.

PART II of this bulletin consists of the replacement of the APU ESC power cables (harness W205).

To do this, it is necessary to gain access to the work area by removing the access panel 351GL, 314BR, 252AZ, the air inlet silencer, and replacing the APU power cable feedthrough, located at zones 311 and 351.

NOTE: The modification presented in this bulletin does not affect the Fatigue Critical Structure (FCS).

E. COMPLIANCE

(1) APPLICABLE TO PART I Embraer recommends that PART I of this bulletin be accomplished within the next 3000 Flight Hour(s) after the original issue of this Service Bulletin.

(2) APPLICABLE TO PART II – If during the accomplishment of the inspection described in PART I, the damage affects the harness insulation and the wire strands (inner conductors), EMBRAER recommends that the APU Auxiliary Power Unit (APU) be considered

SERVICE BULLETIN DATE: 29/Mar/2011 REVISION No.:01 - 16/Mar/2012 SB No.: 190LIN-53-0059 PAGE: 3 Copyright © 2012 by Embraer S.A. All rights reserved.

inoperative until the replacement of harness W205.

F. APPROVAL The technical aspects of this Service Bulletin are approved by: Agência Nacional de Aviação Civil (ANAC).

G. ESTIMATED MANPOWER This estimate is for direct labor only, performed by experienced personnel, and does not include the time to plan, prepare, or inspect the work.

It is assumed that all the tools, parts, and other means are readily available when necessary.

This estimate does not include the sealant, paint, or adhesive curing time.

(1) APPLICABLE TO PART I – Access opening: 0.5 man-hours.

– Inspection: 1.0 man-hour.

– Modification: 3.0 man-hours.

– Access closure: 0.5 man-hours.

– Test: 1.0 man-hour.

(2) APPLICABLE TO PART II – Access opening: 0.5 man-hours.

– Inspection: None.

– Modification: 6.0 man-hours.

– Access closure: 0.5 man-hours.

SERVICE BULLETIN SB No.: 190LIN-53-0059 PAGE: 4 DATE: 29/Mar/2011 REVISION No.: 01 - 16/Mar/2012 Copyright © 2012 by Embraer S.A. All rights reserved.

– Test: 1.0 man-hour.

H. WEIGHT AND BALANCE

(1) APPLICABLE TO PART I – Change in basic weight: + 0,1728 lb (+ 0,0784 kg).

– Change in basic moment: + 185,2249 lb.in (+ 2,1340 kg.m).

(2) APPLICABLE TO PART II None.

I. SOFTWARE ACCOMPLISHMENT SUMMARY None.

J. REFERENCES AIPC 190LIN/( ) Aircraft Illustrated Parts Catalog - 49-42-11 - AIRBORNE AUXILIARY POWER.

AMM 190LIN/( ) Aircraft Maintenance Manual PART I - 34-61-00 - NAVIGATION.

AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 20-00-00 - STANDARD PRACTICES-AIRFRAME.

AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 49-00-00, 49-10-00, 49-16-01, and 49-42-11 - AIRBORNE AUXILIARY POWER.

AMM 190LIN/( ) Aircraft Maintenance Manual PART II - 53-03-64 - FUSELAGE.

K. OTHER PUBLICATIONS AFFECTED AIPC 190LIN/( ) Aircraft Illustrated Parts Catalog - 53-31-00 - FUSELAGE.

SERVICE BULLETIN DATE: 29/Mar/2011 REVISION No.:01 - 16/Mar/2012 SB No.: 190LIN-53-0059 PAGE: 5 Copyright © 2012 by Embraer S.A. All rights reserved.

2. MATERIAL INFORMATION A. MATERIAL - PRICE AND AVAILABILITY

(1) MATERIAL AVAILABLE FROM EMBRAER – APPLICABLE TO PART I The kit below required for the accomplishment of this bulletin will be available from Embraer at a reference price shown below, subject to confirmation upon receipt of orders.

The estimated delivery date will be provided by Embraer upon request.

When ordering, specify SB 190LIN-53-0059 and Top Kit PN presented in Table below, as applicable.

REF TOP KIT PN Unit Price(US$) TOP KITEFFECTIVITY 01 BSLIN5300590001 - Refer to 1.A. SB

EFFECTIVITY – APPLICABLE TO PART II The material below, required for the accomplishment of PART II of this bulletin will be available from Embraer.

NEW PN DESCRIPTION OLD PN QTY DISP/Notes 171-06728-401 Harness W205 170-25066-401 or 171-06728-401 01 7/ [1] 207W245-3-01/42 or 207W245-3-01/42-0 Freedthrough 207W245-3-01/42 01 7/ [1]

1. Refer to AIPC 49-42-11 - ELECTRONIC STARTER CONTROLLER / AICC INTERFACE HAR- NESS (W205).

SERVICE BULLETIN SB No.: 190LIN-53-0059 PAGE: 6 DATE: 29/Mar/2011 REVISION No.: 01 - 16/Mar/2012 Copyright © 2012 by Embraer S.A. All rights reserved.

DISPOSITION: 7 = Replace with part bearing same PN

(2) MATERIAL AVAILABLE FROM OTHER VENDORS None.

B. INDUSTRY SUPPORT INFORMATION

(1) WARRANTY COVERAGE

(a) Parts Parts will be provided by Embraer.

(b) Labor Will be reimbursed by Embraer to the limit defined in the item1.G. ESTIMATED MANPOWER if performed at an Embraer-Authorized Service Center.

(c) Expiration FOC Expiration date: 24 months after SB release.

C. MATERIAL NECESSARY FOR EACH AIRCRAFT When applicable, the use of alternative or similar parts in place of the one specified in the kits is allowable, provided that these alternative or similar parts are approved by Embraer as indicated in the related Embraer Technical Publications or through a formal Embraer communication channel.

The necessary expendable or consumable parts presented in the AMM Tasks referred to in this bulletin should be procured from the operator’s inventories or ordered as spares.

The complementary information, when necessary, is presented as Notes in the respective Table.

For ordering information and Top Kit effectivity refer to section 2.A. MATERIAL - PRICE AND AVAILABILITY of this Bulletin.

SERVICE BULLETIN DATE: 29/Mar/2011 REVISION No.:01 - 16/Mar/2012 SB No.: 190LIN-53-0059 PAGE: 7 Copyright © 2012 by Embraer S.A. All rights reserved.

(1) TOP KITS AND KITS Kit Summary: Top Kit Composition (Kit PN / Quantity) Top Kit PN 171-11709-603 BSLIN5300590001 01 Kit PN 171-11709-603 NEW PN DESCRIPTION OLD PN QTYSUP QTYRQD DISP/Notes 191-21716-003 Grommet Support - 01 01 2 T50R-6TZ Cable Tie - 02 02 2

(2) MATERIAL TO BE PROCURED

(a) Parts If applicable, the material below or equivalent, required to repair the cable, should be procured from the operator’s inventories, from a local supplier or ordered as spare from Embraer.

Refer to 1.A. SB EFFECTIVITY

NEW PN DESCRIPTION OLD PN QTY DISP/ Notes RNF-100-3/4-9 Heat Shrinkable Tubing or similar -0 1 6

(b) Consumable Materials If during the inspection any sign of damage to the harness W205 was detected, the material below or equivalent, required to repair the cable, should be procured from the operator’s inventories or from a local supplier.

SERVICE BULLETIN SB No.: 190LIN-53-0059 PAGE: 8 DATE: 29/Mar/2011 REVISION No.: 01 - 16/Mar/2012 Copyright © 2012 by Embraer S.A. All rights reserved.

Refer to 1.A. SB EFFECTIVITY

NEW PN DESCRIPTION OLD PN QTY DISP/ Notes S1006 Adhesive - 01 6/ [1]

1. Epoxy Adhesive (A-A-56031) S1006.

DISPOSITION: 2 = Incorporate part bearing NEW PN 6 = Apply as required D. MATERIAL NECESSARY FOR EACH SPARE None.

E. REIDENTIFIED PARTS None.

F. TOOLING - PRICE AND AVAILABILITY Whenever required, the necessary tooling presented in the AMM Tasks referred to in this bulletin, should be procured from the operator’s inventories or ordered as spares.

SERVICE BULLETIN DATE: 29/Mar/2011 REVISION No.:01 - 16/Mar/2012 SB No.: 190LIN-53-0059 PAGE: 9 Copyright © 2012 by Embraer S.A. All rights reserved.

3. ACCOMPLISHMENT INSTRUCTIONS NOTE: 1) For the purpose of this Service Bulletin, a Detailed Inspection (DI) is: “An intensive examination of a specific item, installation or assembly to detect damage, failure or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be necessary. Surface cleaning and elaborate access procedures may be required.”

2) Obey all of the WARNINGS and CAUTIONS included in the referenced manuals and procedures.

3) The Manuals and other documents are referred to by acronyms or using a simplified form. Refer to section 1.J. REFERENCES for a more complete definition.

The steps below outline the general accomplishment instructions.

The detailed sequence is included in the respective figure, when necessary.

A. Make sure that the aircraft is safe for maintenance. Refer to AMM TASK 20-00-00-910- 801-A/200 - Aircraft Maintenance Safety Procedures - Standard Procedures.

B. PART I – INSPECTION AND PROTECTION FOR HARNESS W205

(1) Carry out the procedure to make the aircraft safe for maintenance of the APU (AMM TASK 49-00-00-910-801-A/200 - Airborne Auxiliary Power - Maintenance Practices).

WARNING : DO NOT TOUCH THE EXHAUST DUCT AND APU COMPONENTS UNTIL THEY ARE COOL. THE TEMPERATURE STAYS HIGH AF- TER THE APU STOPS. IF YOU TOUCH THEM, YOU CAN BURN YOURSELF.

(2) Remove tail cone access panel 351GL . Refer to AMM TASK 53-03-64-000-801- A/400 - Tail-Cone External Access-Panels - Removal.

(3) Remove the air inlet silencer. Refer to AMM TASK 49-16-01-000-801-A/400 - APU Air Inlet Silencer Assembly - Removal.

(4) On the MCDU (AMM SDS 34-61-00/1), use the sequence in parentheses to make sure that these SSPCs are open:

SERVICE BULLETIN SB No.: 190LIN-53-0059 PAGE: 10 DATE: 29/Mar/2011 REVISION No.: 01 - 16/Mar/2012 Copyright © 2012 by Embraer S.A. All rights reserved.

Pages 13–24 of 28