Copy · TR 8-3 · 10 pages

© Embraer S.A. Filed by the FAA in regulations.gov docket FAA-2014-0586; AD 2015-17-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '389bafcdc3ee7b6a9e1bf28575827a70110c9ee7c4f41aaf3b181b73b3566621'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AGÊNCIA NACIONAL DE AVIAÇÃO CIVIL - ANAC

LEGACY BJ - MPG (MPG-1483) TRANSMITTAL LETTER FOR TEMPORARY REVISION No. 8-3 SUBMITTED FOR APPROVAL ON: 08th APRIL 2013 This transmittal letter presents LEGACY BJ - MPG Temporary Revision 8-3 with the sanction of Agência Nacional de Aviação Civil

- ANAC.

Record the incorporation of the revision on the Record of Temporary Revisions. Retain this transmittal letter and file it at the front of the report.

Reasons:

Signed by:

The MPG-1483 revision 8 SECTION 4 - STRUCTURAL INSPECTION REQUIREMENTS and APPENDIX 2 - AIRWORTHINESS LIMITATION REQUIREMENTS, is being revised based on the DCA 0145-053-00042-2012 revision A to incorporate technical changes.

Actions:

Please, refer to the highlights of this TR for more details.

Insert the pages referred to below as indicated:

Page 1, 2 and 3 of 5 - Update on page 4-25.

Page 4 and 5 of 5 - Update on page A2-18.

MARIO LEHMERT RENAUD Don ahmen Densed Agência Nacional de Aviação Civil - ANAC Date:

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 TR 8-3 Apr 08/13 1 of 2 mpg1483 EMBRAER S.A.

AV. BRIGADEIRO FARIA LIMA, 2.170 - CAIXA POSTAL 8050 - TELEFONE (55) 12 3927-7517 FAX (55) 12 3927-7546 CEP . 12.227-901 - SÃO JOSÉ DOS CAMPOS - SÃO PAULO - BRASIL e-mail: distrib@embraer.com.br - http://www.embraer.com TO: HOLDERS OF PUBLICATION No. MPG-1483 - “MAINTENANCE PLANNING GUIDE”, APPLICABLE TO EMB-135BJ AIRCRAFT.

TEMPORARY REVISION No. 8-3 DATED APRIL 08/2013

HIGHLIGHTS This highlights presents MPG Temporary Revision 8-3.

Please insert in your publication the attached page of the referred to Temporary Revision.

Enter this Temporary Revision in the Record of Temporary Revisions.

Insert this highlights at the front of the latest highlights in the manual.

This highlights must be discarded at the next revision.

Please do not hesitate to contact us for any additional information you may find of your needs.

1. Contents This issue encompasses Temporary Revision 8-3 – MPG-1483 dated APRIL 08, 2013.

2.Outline of changes An outline of all changes is presented below.

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 TR 8-3 Apr 08/13 2 of 2 mpg1483 SECTION 4 – STRUCTURAL INSPECTION REQUIREMENTS Updated item 4.10 STRUCTURAL TASKS, as indicated below.

APPENDIX 2 – AIRWORTHINESS LIMITATION REQUIREMENTS Created nine (9) new INSPECTION INTERVAL LIMITS for SSI 53-10-20.REFERENCE NUMBER DESCRIPTION OF CHANGE 53-12-00-250-805-L00 NEW TASK. New task created.

53-12-00-250-806-L00 NEW TASK. New task created.

53-12-00-250-807-L00 NEW TASK. New task created.

53-12-00-250-808-L00 NEW TASK. New task created.

53-12-00-250-809-L00 NEW TASK. New task created.

53-12-00-250-810-L00 NEW TASK. New task created.

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 Apr 08/13 mpg1483

RECORD OF TEMPORARY REVISIONS T.R.

No.

DATE ISSUED DATE

REMOVED

INCORPORATED BY T.R.

No.

DATE ISSUED DATE

REMOVED

INCORPORATED BY 0-1 Feb 06/02 Nov 26/02 Revision 1 0-2 May 29/02 Nov 26/02 Revision 1 0-3 Jun 13/02 Nov 26/02 Revision 1 0-4 Sep 16/02 Nov 26/02 Revision 1 1-1 Dec 06/02 Jul 31/03 Revision 2 2-1 Sep 16/03 Apr 01/04 Revision 3 2-2 Nov 21/03 Apr 01/04 Revision 3 3-1 Jun 24/04 Oct 14/05 Revision 4 3-2 Sep 03/04 Oct 14/05 Revision 4 3-3 Oct 19/04 Oct 14/05 Revision 4 3-4 Jun 22/05 Oct 14/05 Revision 4 4-1 Dec 20/05 Mar 22/07 Revision 5 6-1 Oct 02/09 Aug 12/10 Revision 7 7-1 Oct 13/10 Apr 27/12 Revision 8 7-2 Feb 22/11 Apr 27/12 Revision 8 7-3 Feb 24/11 Apr 27/12 Revision 8 7-4 May 12/11 Apr 27/12 Revision 8 8-1 Nov 12/12 8-2 Jan 22/13 8-3 Apr 08/13

AGÊNCIA NACIONAL DE AVIAÇÃO CIVIL - ANAC

LEGACY BJ - MPG (MPG-1483) TRANSMITTAL LETTER FOR TEMPORARY REVISION No. 8-3 SUBMITTED FOR APPROVAL ON: 08th APRIL 2013 This transmittal letter presents LEGACY BJ - MPG Temporary Revision 8-3 with the sanction of Agência Nacional de Aviação Civil

- ANAC.

Reasons:

The MPG-1483 revision 8 SECTION 4 - STRUCTURAL INSPECTION REQUIREMENTS and APPENDIX 2 - AIRWORTHINESS LIMITATION REQUIREMENTS, is being revised based on the DCA 0145-053-00042-2012 revision A to incorporate technical changes.

Actions:

Please, refer to the highlights of this TR for more details.

Insert the pages referred to below as indicated:

Page 1, 2 and 3 of 5 – Update on page 4-25.

Page 4 and 5 of 5 – Update on page A2-18.

Record the incorporation of the revision on the Record of Temporary Revisions. Retain this transmittal letter and file it at the front of the report.

Signed by:

MARIO LEHMERT RENAUD Agência Nacional de Aviação Civil - ANAC MRB Chairman Date:

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 TR 8-3 Apr 08/13 1 of 4 mpg1483 MPG - TEMPORARY REVISION No. 8-3 TO: HOLDERS OF PUBLICATION No. MPG-1483 - "MAINTENANCE PLANNING GUIDE", APPLICABLE TO EMB-135BJ AIRCRAFT.

REASON: The MPG-1483 revision 8 SECTION 4 - STRUCTURAL INSPECTION REQUIREMENTS, is being revised based on the DCA 0145- 053-00042-2012 revision A to incorporate technical changes.

FILING INSTRUCTIONS: Insert this in Section 4 - Structural Inspection Requirements, facing on page 4-25.

On page 4-25:

Insert the new tasks 53-12-00-250-805-L00, 53-12-00-250-806-L00, 53-12-250-807-L00, 53-12-250-808-L00, 53-12-250-809-L00 and 53-12-250-810-L00, as indicated below.REFERENCE NUMBER TYPE DESCRIPTION

THRESHOLD

INT ZONE EFFECT TOLERANCE 53-12-00-250-805-L00 SDE Externally inspect the FUSELAGE component by using Eddy Current Inspection Method:

• Windshield lateral post and its attachment (SSI 53-10-20).

NOTE: Applicable to aircraft Pre-Mod.

S.B.145LEG-00-0007 and Pre-Mod.

S.B. 145LEG-53-0030.

7000 FC 10000 FC 223, 224 L600 Not Applicable

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 TR 8-3 Apr 08/13 2 of 5 mpg1483 MPG - TEMPORARY REVISION No. 8-3

REFERENCE NUMBER TYPE DESCRIPTION

THRESHOLD

INT ZONE EFFECT TOLERANCE 53-12-00-250-806-L00 SDE Externally inspect the FUSELAGE component by using Eddy Current Inspection Method:

 Windshield lateral post and its attachment (SSI 53-10-20).

NOTE: Applicable to aircraft Post-Mod.

S.B.145LEG-00-0007 or with an equivalent modification factory-incorporated and Pre-Mod.

S.B.145LEG-53-0030.

6000 FC 6212 FC 223, 224 ALL Not Applicable 53-12-00-250-807-L00 SDE Internally inspect the FUSELAGE component by using Eddy Current Inspection Method:

 Windshield lateral post and its attachment (SSI 53-10-20).

NOTE: Applicable to aircraft Pre-Mod.

S.B.145LEG-00-0007 and Pre-Mod.

S.B.145LEG-53-0030.

7000 FC 3151 FC 223, 224 L600 Not Applicable 53-12-00-250-808-L00 SDE Internally Inspect the FUSELAGE component by using Eddy Current Inspection Method:

 Windshield lateral post and its attachment (SSI 53-10-20).

NOTE: Applicable to aircraft Post-Mod.

S.B.145LEG-00-0007 ow with an equivalent modification factory-incorporated and Pre-Mod.

S.B.145LEG-53-0030.

6000 FC 1969 FC 223, 224 ALL Not Applicable

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 TR 8-3 Apr 08/13 3 of 4 mpg1483

REFERENCE NUMBER TYPE DESCRIPTION

THRESHOLD

INT ZONE EFFECT TOLERANCE 53-12-00-250-809-L00 SDE Externally inspect the FUSELAGE component by using Eddy Current Inspection Method:

 Windshield lateral post and its attachment (SSI 53-10-20).

NOTE: Applicable to aircraft Pre-Mod.

S.B.145LEG-00-0007 and Post-Mod.

S.B.145LEG-53-0030 or with an equivalent modification factory-incorporated.

6915 FC 3247 FC 223, 224 L600 Not Applicable 53-12-00-250-810-L00 SDE Externally inspect the FUSELAGE component by using Eddy Current Inspection Method:

 Windshield lateral post and its attachment (SSI 53-10-20).

NOTE: Applicable to aircraft Post-Mod.

S.B.145LEG-00-0007 or with an equivalent modification factory-incorporated and Post- Mod. S.B.145LEG-53-0030 or with n equivalent modification factory-incorporated.

4170 FC 2011 FC 223, 224 ALL Not Applicable

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 TR 8-3 Apr 08/13 4 of 5 mpg1483 MPG - TEMPORARY REVISION No. 8-3 TO: HOLDERS OF PUBLICATION No. MPG-1483 - "MAINTENANCE PLANNING GUIDE", APPLICABLE TO EMB-135BJ AIRCRAFT.

REASON: The MPG-1483 revision 8 APPENDIX 2 - AIRWORTHINESS LIMITATION REQUIREMENTS, is being revised based on the DCA 0145-053-00042-2012 revision A to incorporate technical changes.

FILING INSTRUCTIONS: Insert this in Appendix 2 - AIRWORTHINESS LIMITATION REQUIREMENTS, facing on page A2-18.

On page A2-18, include the ALI items below:

SSI ZONE TYPE SIDE TASK EFFECT Pre-Mod SB 145LEG-00-0007 Pos-Mod SB 145LEG-00-0007 Fatigue Threshold Limit (Flight Cycles) Inspection Interval Limit(Flight Cycles) Threshold Interval Limit (Flight Cycles) Inspection Interval Limit (Flight Cycles) 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE EXT 53-12-00-250-805-L00 L600 7000 10000 - - 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE EXT 53-12-00-250-806-L00 L600 - - 6000 6212 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE INT 53-12-00-250-807-L00 L600 7000 3151 - -

PLANNING GUIDE

LEGACY BJ - MAINTENANCE MPG-1483 TR 8-3 Apr 08/13 5 of 5 mpg1483

SSI ZONE TYPE SIDE TASK EFFECT Pre-Mod SB 145LEG-00-0007 Pos-Mod SB 145LEG-00-0007 Fatigue Threshold Limit (Flight Cycles) Inspection Interval Limit(Flight Cycles) Threshold Interval Limit (Flight Cycles) Inspection Interval Limit (Flight Cycles) 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE INT 53-12-00-250-808-L00 L600 - - 6000 1969 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE EXT 53-12-00-250-806-L00 L650 - - 6000 6212 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE INT 53-12-00-250-808-L00 L650 - - 6000 1969 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE EXT 53-12-00-250-809-L00 L600 6915 3247 - - 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE EXT 53-12-00-250-810-L00 L600 - - 4170 2011 53-10-20

PRE-MOD SB 145LEG-53-0030 223/224 SDE EXT 53-12-00-250-810-L00 L650 - - 4170 2011