TextOCR
This text is OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'c79b7657e5c5d10ff4b321db6aa5302a330467e799924b6a82a96f450b8a3d56' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'c79b7657e5c5d10ff4b321db6aa5302a330467e799924b6a82a96f450b8a3d56' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
NDIP-1172 - Revision B GP7000 Fan Hub Blade Slot Bottom Manual Eddy Current Inspection LPC Module Assy, Piece-part or Engine (On-Wing or Off-Wing with Fan Blades Removed)
TRAIT & WAI
WARNING
THIS DOCUMENT MAY CONTAIN INFORMATION SUBJECT TO THE INTERNATIONAL TRAFFIC IN ARMS REGULATION (ITAR) OR THE EXPORT ADMINISTRATION REGULATION (EAR) OF 1979. THIS INFORMATION MAY NOT BE EXPORTED, RELEASED, OR
DISCLOSED TO FOREIGN NATIONALS OUTSIDE THE UNITED STATES WITHOUT FIRST COMPLYING WITH THE EXPORT LICENSE
REQUIREMENTS OF THE INTERNATIONAL TRAFFIC IN ARMS REGULATION (ITAR) AND/OR THE EXPORT ADMINISTRATION REGULATION (EAR). A VIOLATION OF THE ITAR OR EAR MAY BE SUBJECT TO A PENALTY OF UP TO 10 YEARS IMPRISONMENTT AND A FINE OF $1,000,000 UNDER 22 U.S.C 2778 OR SECTION 2410 OF THE EXPORT ADMINISTRATION ACT OF 1979. INCLUDE THIS NOTICE WITH ANY REPRODUCED PORTION OF THIS DOCUMENT.
RESTRICTION
PAGES OF THIS DOCUMENT MARKED WITH THE NOTICES SET FORTH BELOW CONTAIN CONTRACTOR COMPETITION SENSITIVE DATA AND/OR PRATT & WHITNEY PROPRIETARY DATA WHICH IS SUBMITTED IN CONFIDENCE. NO DISCLOSURE OR USE OF THIS
INFORMATION IS PERMISSIBLE WITHOUT PRIOR WRITTEN CONSENT OF UNITED TECHNOLOGIES CORPORATION EXCEPT FOR OFFICIAL PURPOSES WITHIN THE U.S. GOVERNMENT.
DOCUMENT PROPERTY RIGHTS NOTICE THIS DOCUMENT IS THE PROPERTY OF UNITED TECHNOLOGIES CORPORATION (UTC). YOU MAY NOT POSSESS, USE, COPY OR
DISCLOSE THIS DOCUMENT OR ANY INFORMATION IN IT, FOR ANY PURPOSE, INCLUDING WITHOUT LIMITATION TO DESIGN,
MANUFACTURE OR REPAIR PARTS, OR OBTAIN FAA OR OTHER GOVERNMENT APPROVAL TO DO SO, WITHOUT UTC'S EXPRESS WRITTEN PERMISSION. NEITHER RECEIPT NOR POSSESSION OF THIS DOCUMENT ALONE, FROM ANY SOURCE, CONSTITUTES SUCH PERMISSION. POSSESSION, USE, COPYRIGHT OR DISCLOSURE BY ANYONE WITHOUT UTC S EXPRES WRITTENT PERMISSION IS NOT AUTHORIZED AND MAY RESULT IN CRIMINAL AND OR CIVIL LIABILITY.
NOTICES P&W PROPRIETARY INFORMATION - ECCN 9E991- EXPORT CONTROLLED Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subiect to the restriction on the title bade of this document
NDIP-1172 - Revision B GP7000 Fan Hub Blade Slot Bottom Manual Eddy Current Inspection LPC Module Assy, Piece-part or Engine (On-Wing or Off-Wing with Fan Blades Removed)
ORATI & WE Instructions described within this procedure do not replace, amend or supersede any instructions included in other Pratt & Whitney technical publications. Active Service Bulletins and other technical publications published by Pratt & Whitney comprise approved technical data.
Written by: Lisa Brasche Approved by: Lisa Brasche Original Issue Date: December 15, 2017 Revision History:
Revision Letter Revision Date Changes Revision By Approved By Release Initial Dec 15, 2017 N/A L. Brasche L. Brasche, PL3 Jan 12, 2018 Technical updates L. Brasche L. Brasche, PL3 Apr 8, 2018 Technical updates L. Brasche L. Brasche, PL3 2 Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 Revision B GP7000 Fan Hub Blade Slot Bottom Manual Eddy Current Inspection LPC Module Assy, Piece-part or Engine (On-Wing or Off-Wing with Fan Blades Removed) I. GENERAL:
The purpose of this eddy current inspection is to detect cracking in the fan blade slot bottom of the GP7000 1st Stage Low Pressure Compressor (LPC) Rotor Assembly (fan hub), PN 5760221 or PN 5760321. (Note Fan Hub Assembly PN 5760221 contains detail Hub PN 5760201 and Fan Hub Assembly PN 5760321 contains detail Hub PN 5760301). This procedure is for the inspection of a part in either a module or onwing/offwing engine configuration or piece-part (thoroughly disassembled) with the fan blades removed. This inspection is a manual eddy current inspection developed to support field or shop inspection for the GP7000 fan hub. The highest stress regions are near the forward edge of the slot bottom. The latter 1.5 inches will not be inspected with the engine installed. The same procedure/hardware can be used to inspect the slot regardless of the fan hub assembly level.
The inspection consists of the following sequences:
• Nine probes to cover the required region
• Pre-inspection calibration
• Inspection
• Accept/Reject analysis
• Post-inspection calibration
• Report completion Pratt & Whitney technical data describing part inspections using a commercially available eddy current inspection is written with a level of detail that assumes instrument and probes are properly maintained and the NDT inspectors are qualified and are familiar with operating the equipment.
II. REFERENCES:
A. UniWest EVi Instrument User Manual B. Olympus iPlex UltraLite Industrial Videoscope (IV8620U) User Manual 3 Pratt & Whitney Proprietary Information ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 Revision B III. INSPECTOR QUALIFICATIONS:
Only qualified operators, specifically designated, trained, and approved can perform this inspection.
A Pratt & Whitney task specific certificate will be issued to qualified inspectors. The following requirements must be met:
• Have obtained forty (40) hours of hands on instruction and familiarization with test equipment, probes, and inspection technique.
• Operators shall demonstrate inspection readiness on PW-approved test part(s). The student will evaluate instructor-selected areas in the inspection zone and the results will be compared to lab results to determine success of student technique. The instructor s assessment of candidate s capabilit of performing the inspection is based on successful completion and accurate quantification of known defects in the PW-approved test parts).
The instructor may provide additional training or advise additional training as needed to a candidate. This evaluation is conducted by Pratt & Whitney approved instructors only.
• Inspector recertification is required if more than six months elapses without having performed an inspection or completed training/refresher training. Recertification may require up to a three day refresher course given by a Pratt & Whitney approved instructor.
• Contact the Pratt and Whitney MPE/NDE for questions regarding inspector training.
IV. INSPECTION PREPARATION:
A. Required Equipment List
ITEM NUMBER DESCRIPTION SUPPLIER 1 Uniwest #99977 EVi Eddy Current Instrument Uniwest 2 Uniwest #96384 EVI Batteries (quantity - 8) Uniwest 3 Uniwest #96574 Battery Charger Uniwest 4 Uniwest #77159 AC Adapter Uniwest 5 Uniwest #92374 Power Cords Uniwest Uniwest #100252 4-Button Remote Uniwest 7 Uniwest #100145 Multiplexer Uniwest Uniwest 74714 Cable Assembly - Evi to MUX Uniwest 9 Uniwest 74920 Cable Assembly Uniwest 10 Wiha 3/32 3/32" Allen Wrench Wiha or equivalent 4 Pratt & Whitney Proprietary Information EON 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 Revision B
ITEM NUMBER DESCRIPTION SUPPLIER 11 PWA106161 ECP 1098 Zone 4 probe Pratt & Whitney 12 PWA106160 ECP 1097 Zone 4/5 probe Pratt & Whitney 13 PWA106159 ECP 1096 Zone 5 probe Pratt & Whitney 14 PWA106158 ECP 1095 Zone 6 probe Pratt & Whitney 15 PWA106157 ECP 1094 Zone 7 probe Pratt & Whitney 16 PWA106156 ECP 1093 Zone 8 probe Pratt & Whitney 17 PWA106155 ECP 1092 Zone 9 probe Pratt & Whitney 18 PWA106154 ECP 1091 Zone 9/10 probe Pratt & Whitney 19 PWA106153 ECP 1090 Zone 10 probe Pratt & Whitney 20 PWA106172 US-3647 Calibration Standard Pratt & Whitney 21 Uniwest #77217 Shipping Case Uniwest B. Required Equipment Description:
1. Eddy Current Instrumentation
a. Uniwest EVi and 4-button remote The Uniwest EVi instrument (Figure 1) is required for this inspection with array capability enabled.
The 4-button remote aids in "Null", "Clear", "FreezeScreen" and "Screenshot" functions. Associated accessories to enable operation include batteries, adapter cables, and power cables.
5 Pratt & Whitney Proprietary Information ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 - Revision B Eddy Current Instrument GP7000 KIT5 4-button Remote Figure 1. Eddy current instrument (Uniwest EVi) and 4-button remote.
b. Multiplexer The Uniwest Multiplexer (PN 100145) and cable (PN 74714) are needed for array operation in combination with the EVi instrument and associated probes.
Cable Multiplexer Uni Wesle 1201-4
LET EDE CONCETO Figure 2. Multiplexer and cable used with eddy current instrument.
6 Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 - Revision B
2. Eddy Current Probe Set - (PWA106153 thru PWA106161)
a. Probe ID:
Nine probes are utilized to cover the full 2.1" inspection zone as shown in Figure 3. Each probe covers a 0.34" area with a 0.02" overlap between zones. Zone 4/5 (PWA 106160) and Zone 9/10 (PWA 106154) provide double coverage in the most critical areas. Note the forward edge taper which provides ease of access into the slot and ensures proper probe entry.
Probe Set Probe Mot
WDE AFT Zone e PWA 0686 Figure 3. Probe set, contains nine probes needed to provide coverage of the required inspection zone.
b. Probe design:
Each probe contains an eight channel sensor comprised of two, paired elements per channel. The probe for zone 7 is shown as an example in Figure 4 (left). The sensor is installed in a springloaded "flapper" (Figure 4 - expanded view - middle). The sensor is comprised from eight pairedelements (16 total elements) aligned for optimal crack detection for the orientation shown. When one of the two pairs passes over the crack, the affected channel will respond. If multiple elements are affected, the impedance plane response will indicate the interaction with a "figure-8" pattern (Figure 4 - right).
7 Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 - Revision B Crack Crack orientation orientation Response on multiple channels when multiple sensor elements are passed over crack Probe motion Figure 4. Probe (Zone 7) contains 8-channel sensor (left and expanded view) with pairedelements travelling normal to the crack orientation. Paired-elements that pass over the crack will result in a response on the respective impedance plane display for the affected channels (right).
c. Probe - instrumentation interface Details of the probe configuration and instrument response are shown in Figure 5. For the GP7000 inspection, the instrument is set to eight-channels where each channel is tied to an element pair (Figure 5 a).
The sensor is comprised of two rows of four channels. The elements are staggered to ensure full coverage (Figure 5 b).
During scanning, the display is set to show all eight channels (Figure 5c). Monitor the impedance plane display for "figure 8" responses. Note that multiple channels may show a response depending on crack position with respect to element position, as shown in Figure 5c where F1, F2 and F3 all show some response. In this example, the F2 element pair is best positioned with respect to the notch as it shows the highest amplitude response.
The color options shown here were selected to work in aircraft shop environments where lighting can be a factor. Other color selections for background and trace color can be selected as needed 8 Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 - Revision B to facilitate review using the "GENERAL SETTINGS" functions in the "ADVANCED" menu selections.
The instrument display can also be set to individual channels to assist with analysis (Figure 5d).
(a) Two Element Pair = One Channel R Two rows of
(b) Four Channels Display eight
(c) channels for detection Display single
(d) channel for analysis Figure 5. Probe construction begins with pairs of differential elements tied to one of eight channels (a). The eight pairs of elements are aligned in two rows (b) which can be displayed simultaneously (c) or as individual channels (d).
3. Calibration Standard PWA106172 (US 3647) Calibration is accomplished by traversing a notched standard over each of the elements for each of the sensors. The notch standard contains a 0.020" x 0.010" semi-circular notch at the center of the 9 Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 - Revision B titanium segment. Figure 6 shows the calibration fixture (PWA106172) which includes a micrometer that enables controlled motion of the notch standard over the sensor (Figure 6 right).
Micrometer Notch Standard Notch Standard Probe Probe Sensor stand Figure 6. Calibration fixture, PWA106172, (left) shown with probe positioned for optimization. Notch standard in position above sensor (right) C. Miscellaneous tools:
1. Fan Containment Case Work Stand, PWA 107274: Used to assist with inlet access, if available
2. Dry wipes and resealable plastic bags: Lint free wipes used to remove excess lubricant from blade slots. Resealable plastic bags used to transport dry wipes to/from the inlet
3. Isopropyl alcohol wipes: Used as needed to remove excess antigallant remnants
4. Part marker: Only Trace Element Certified (TEC) Sharpie markers, Silver Pencils or other approved markers.
5. Protective tape: Cover the eddy current probe sensor and flapper area with a smooth wrinkle free layer of Kapton or PTFE tape.
6. Scissors, scalpel or equivalent: Utilized for preparation of tape used to protect the sensor.
7. 3/32" allen wrench: Used for connection of probes to multiplexer.
10 Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 - Revision B
8. Olympus iPlex UltraLite Industrial Videoscope (IV8620U) or equivalent: Used for local viewing of surface condition as needed for onwing inspection.
9. Headlamp, flashlights and lamps: Used as necessary to assist with task lighting.
D. Inspection Zone The inspection can be performed on fan hubs either installed in an engine or module (Figure 7 left) or uninstalled, from forward to aft of the blade slot bottom. The inspection coverage requirement is a 2.1" section of the fan hub slot bottom as indicated by the green arrow (Figure 7 right).
Figure 7. GP 7000 fan hub in installed position (left) with probe inserted. Inspection coverage indicated by green arrow (right) on forward face.
The blade slot bottom is divided into nine zones as shown in Figure 8. Zones 4, 5, 6, 7, 8, 9 and 10 overlap by approximately 20 mils. Zone 4/5 and Zone 9/10 provide "double coverage" in the most critical areas of the slot bottom.
11 Pratt & Whitney Proprietary Information - ECCN 9E991 Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document
NDIP-1172 - Revision B FRWD Zone 4/5 Zone 9/10 Zone a Zone 8 Zone 4 Zone 10 Zone S Zone 7 Zone 9 Figure 8. Zone map for the slot bottom probes.
E. Inspection Preparation This inspection was developed to support crack detection during onwing inspection of the GP7000, fan hub assembly PN 5760221 and PN 5760321. The fan blades will be removed to allow inspection of the blade slots but the hub will remain installed in the engine. For inspection, the lock ring, fan blades, fan blade fairings and blade spacers are removed to enable full access of the probe.
1. If available, the Fan Containment Case Work Stand, PWA 107274, can be used to improve access to the fan hub slots. PWA 107274 is a rectangular shaped platform made of thermoplastic construction (Figure 9).
Pratt & Whitney Proprietary Information - ECCN 9E991 y Information - ECCN SEn the tile page of this documen Use or disclosure of the data contained in this sheet is subject to the restriction on the title page of this document