Copy · SBF28-46-002 · 13 pages

© Fokker. Filed by the FAA in regulations.gov docket FAA-2019-0444; AD 2019-20-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '6fdbf18fb74724b840e752b427724d6e7755544409ebe2c421638e98a9ae5791'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

FOKKER SERVICES

Service Bulletin Prepared Function / Note Date visser-mv02446 10-07-2018 Colleague Check schrama-ks50879 12-07-2018 Manager Final Approval ariejan.degraaf 18-07-2018 Office of Airworthiness Approval reekers-ar01915 27-07-2018

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002

Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than explicitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

EASA approved procedure for electronic sign-off

F28 Generic SB

SBF28-46-002

Revision -

INFORMATION SYSTEMS - FLIGHT DECK INFORMATION SYSTEM

The Modification of the USB Receptacles installed as Part of "Provisions for" EFB

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

1. General Information A. General

(1) This document is digitally prepared, checked and released (Electronic Sign-Off, E.S.O.). This means that physical signatures on the document front page are replaced by digital signatures. The document is signed and released when the name and date of signature of the engineer concerned is filled out on the front page of the document. The digital document, workflow, revision history and proof of sign-off are stored and controlled in the Fokker product data management system. Electronic sign-off is approved by EASA. The procedure and process of E.S.O. are checked regularly during internal audits and via EASA oversight.

B. Table of Contents

 Section 1: General Information  Section 2: Planning Information  Section 3: Material Information  Section 4: Accomplishment Instructions  Service Bulletin Quality Reporting Form and attachments (if applicable):

 List of drawings/parts lists  Parts List Local source (PLL)  Parts List Supply (PLS)  Required drawings C. Service Bulletin Revision History

Revision Date (dd-mm-yyyy) Reason for Revision

- Refer to footer First Release

INFORMATION SYSTEMS - FLIGHT DECK INFORMATION SYSTEM

The Modification of the USB Receptacles installed as Part of "Provisions for" EFB.

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

2. Planning Information A. Effectivity

(1) F28 Mark 3000 aircraft serial number:

11137 if equipped with USB receptacles pn LS03-05050A.

NOTE: The USB receptacles pn LS03-05050A are introduced with Service Bulletins:

 SBF28-46-001 - The Introduction of "Provisions for" a Class 2 Electronic Flight Bag (EFB), iPad® based installation.

B. Concurrent Requirements

(1) Not applicable.

C. Reason

(1) Some operators reported smoke in the cockpit caused by an overheated EFB USB receptacle. A short circuit in the EFB charging cable caused the overheating of the USB receptacle.

This modification of the USB receptacles will introduce current limiting and overheat protection to prevent overheat of the USB receptacle.

D. Description

(1) This Service Bulletin will tell you how to:

• Remove the LH and RH USB receptacles.

• Modify the USB receptacles.

• Install the modified USB receptacles.

• Perform the operational test.

E. Compliance

(1) Recommended.

Fokker Services recommends the accomplishment of this Service Bulletin within 12 months after the date of issue of this Service Bulletin but not later than within the compliance time defined in the AD (see note below) which takes precedence over the recommendation by Fokker Services.

NOTE: It is expected that EASA will issue an Airworthiness Directive (AD) with respect to this subject with the same compliance terms. Refer to the EASA website for the publication of a Proposed Airworthiness Directive for comments.

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

F. Approval

(1) The technical content of this document is approved under the authority of DOA ref.

EASA.21J.059.

(2) The contents of this Service Bulletin introduces an approved design in accordance with EASA-approved Minor change.

G. Manpower

(1) Approximately 2,5 man-hours are necessary to do this Service Bulletin on one aircraft.

This table of manpower will help you to schedule and do this Service Bulletin:

Elapsed time (hours) Removal 1 1,0 1,0 Modification Inspection Installation 1 1,0 1,0 Testing 1 0,5 0,5 Total 2,5 2,5 - Instructions Men Man-hours

- -

(2) The estimated hours are for direct labor done by experienced personnel. They are calculated based on the conditions given in SBF28-00-001 (Service Bulletin Introduction, section 2.C., “Manpower”).

H. Weight and Balance

(1) Weight change: None.

Index change: None.

I. Electrical Load Data

(1) Direct Current (DC) Loads:

(a) Not changed.

(2) Alternating Current (AC) Loads:

(a) Not changed.

J. Software Accomplishment Summary

(1) Not applicable.

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

K. References

(1) Fokker 28 Maintenance Manual (MM) Fokker 28 Illustrated Parts Catalog (IPC) Fokker 28 Wiring Manual (WM) Fokker 28 Service Bulletin (SB):

- SBF28-46-001 Fokker All Operators Message:

AOF28.042 Fokker internal reference(s):

ECR 016521.

L. Publications Affected

(1) This Service Bulletin affects the publications listed below:

(a) Maintenance Documentation

- Fokker F28 Illustrated Parts Catalog (IPC) - chapter 46-20

(b) Maintenance Programs Not affected.

(c) Special Instructions for Continued Airworthiness (ICA) The effect of this Service Bulletin on the special ICA is as follows:

YES NO

- Electrical Wiring Interconnection System (EWIS) - X

- Fuel Tank Safety (FTS) - X NOTE: If “YES”, the changed ICA is described in an Attachment to this Service Bulletin.

(d) Operational Documentation Not affected.

(2) Report to Fokker Services that this Service Bulletin has been carried out on the applicable aircraft.

(3) You have the possibility to send your SB feedback to Fokker Services per “Service Bulletin Reporting Quality Form”. This form is located on the last Service Bulletin page.

(4) For incorporation of this Service Bulletin in your documentation refer to SBF28‑00‑ 001 (Service Bulletin Introduction, section 4 “Incorporation of Service Bulletins in Documentation of Fokker Services”).

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

M. Interchangeability or Intermixability of Parts

(1) Not applicable.

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

3. Material Information A. Material – Price and Availability

(1) You can order the necessary parts as mod kit USB-B00000-XU-A. For each aircraft to be modified you require two mod-kits. You can contact your Fokker Services Customer Support Manager for lead-time of the mod kits.

(2) The mod-kits will be delivered Free Of Charge provided you order all necessary mod kits for your complete fleet in one order within one year of the issue date of this Service Bulletin.

B. Material Required

(1) These parts, which are necessary to complete this Service Bulletin on 1 aircraft and are not part of the mod kit, are described in attachment Part List Local (PLL).

(a) Not applicable.

(2) The mod kit parts, which are necessary to do this Service Bulletin on 1 aircraft on 1 side are described in attached Parts List Supply (PLS).

Material List Description Aircraft Effectivity USB-B00000-XU-A Parts List Supply (PLS) All NOTE: The printed circuit board pn LS03-26008 is delivered with a placard pn LS01-22018B for part number and serial number identification.

C. Tooling – Price and Availability

(1) One special tool pn LPSP0012 will be delivered Free Of Charge with your mod kit order, provided you order all necessary mod kits for your fleet in one order, within one year of the issue date of this Service Bulletin.

D. Tooling Required

(1) The special tool(s), which are necessary to complete this Service Bulletin on 1 aircraft and are not part of the mod kit are described in table below.

Part Number Description Info Remark LSPS00112 Kit, Install Required for USB receptacle rework Amphenol pn USBFODE can be used as an alternative

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

4. Accomplishment Instructions

General:

- In general, use (A)MM chapter 20, standard practices-airframe, as guide line for the aircraft modification.

- Loosen the cable clamps where necessary.

- Remove and discard the cable ties where necessary.

- Remove and discard the lacing tape where necessary.

- Use cable ties and lacing tape where necessary.

- Use cable clamps where necessary.

WARNING: BE CAREFUL WHEN YOU USE THE CONSUMABLE MATERIALS. OBEY

THE INSTRUCTIONS AND MANUFACTURER'S HEALTH AND SAFETY INSTRUCTIONS.

A. Remove all electrical power, refer to the (A)MM, chapter 24-00-00.

B. Put up warning signs to tell persons:

"DO NOT CONNECT THE ELECTRICAL POWER" "DO NOT CONNECT THE BATTERIES".

C. The removal of the USB receptacle part number LS03-05050A, the modification of this part number into USB receptacle part number LS03-05050B and the installation of this USB receptacle.

NOTE: If, for some reason, already an USB receptacle part number LS03-0505B is installed on both sides, this service bulletin can be considered accomplished.

Do steps (1) thru (5) for the LH and RH USB receptacle.

(1) Gain access to the rear side of the USB receptacles according to the MM, chapter 46-20, for the iPad ® installation.

(2) Carefully remove the shrink sleeve from the rear side of the USB receptacle.

(3) Disconnect and discard the small connector from the rear side of the receptacle.

(4) Remove and keep the mounting screws, nuts and washers of the USB receptacle.

(5) Remove and keep the USB receptacle for modification.

Do step (6) for each USB receptacle to be modified.

(6) Perform Lone Star Aviation field replacement instructions, refer to appendix I. Use:

- 2 Printed circuit board pn LS03-26008

- AR Sleeve pn F0N1-3619-19.

NOTE: The new printed circuit board is marked with a red dot on the black compound

FOKKER SERVICES

Service Bulletin

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

Do steps (7) thru (11) for LH and RH side.

(7) Slide the shrink sleeve over the wires connected to the small connector.

(8) Connect the small connector to the rear side of the USB receptacle.

(9) Place the shrink sleeve over the rear end of the USB receptacle as shown below:

Typical sleeve installation on USB receptacle

(10) Heat-shrink the sleeve, bend cable assy into shape, if required, and squeeze together (flat) at cable side while sleeve is hot. Hold in shape until sleeve has cooled down.

(11) Install the modified USB receptacle with the parts you kept in step 4. Use:

- 2 USB receptacles pn LS03-05050B.

D. General Test Instructions

(1) If an electrical connector has been disconnected, all disturbed system(s) should be checked according to the applicable MM chapter(s), unless the applicable MM contains specific guidelines.

(2) Perform Operational Test of next table.

Action Result Pass/ Fail

(1) Connect the electrical power to the aircraft.

(2) Make sure both circuit breakers EFB Power are closed.

(3) Connect a suitable iPad® to the LH and RH USB output.

(a) Both iPads® charge normally

(4) Disconnect and remove the LH and RH iPad® from the mounting device after the test was performed.

E. Re-install all removed access panels according to the applicable MM chapters.

F. Remove all tools, materials and equipment from the work area. Make sure that the area is clean.

Page 10OCROpen in PDF

FOKKER SERVICES tokke Service Bulletin > GKN AEROSPACE Appendix I

LONE STAR AVIATION LS03-05050-A to LS03-05050-B Field Replacement Instructions How to remove USB Module from MS USB

1. Insert the removal tool, LSPS-00112 over the plastic insert from the back as shown in the figure on the right until fully seated.

2. From the center of the removal tool push the plastic module out of the MS USB housing.

3. Use plastic pin to carefully unlock the 4 Interlock tabs around the plastic housing to Remove original USB PC Board. Note the orientation of the two plastic shell parts.

Status: Revision: Released date: (dd-mm-yyyy) Released 27-07-2018 Security class: F28 Generic SB no.:

RESTRICTED SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement eproduction or disclosure to third parties of this document or any part thereot, or the use of any intormation contained therein tor purposes other than explicitly allowed by the atoresaid agreement, is not permitte except with the prior written permission of Fokker Services B.V Page 9 of 11

Page 11OCROpen in PDF

FOKKER SERVICES Fokker Service Bulletin > GKN AEROSPACE

LONE STAR AVIATION LS03-05050-A to LS03-05050-B Field Replacement Instructions How to insert new USB Module into MS USB

4. Inspect new USB PC Board to ensure no damage and insert inside the plastic housing with correct orientation and then carefully lock back together.

5. Insert plastic back into MS USB from front as shown on the right. The USB Connector must be positioned as shown to lock into position.

6. Push plastic housing from back to ensure it is properly locked into position.

7. Remove old label and replace with new LS03-05050-B Label. Clean surface if needed before applying new label.

Status: Revision: Released date: (dd-mm-yyyy) Released 27-07-2018 Security class: F28 Generic SB no.:

RESTRICTED SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement eproductor or discosure to thra pares or ts document or any pan meredi, or te use or any moraton containeu thereior purposes omer man expicy aloweu by the aloresaid agreement, is not pent except with the prior written permission of Fokker Services B.V Page 10 of 11

FOKKER SERVICES

Service Bulletin Quality Reporting Form

Status:

Released Revision:

- Released date: (dd-mm-yyyy) 27-07-2018 Security class:

RESTRICTED F28 Generic SB no.:

SBF28-46-002 Copyright All rights reserved by Fokker Services B.V. (The Netherlands). This document has been supplied by Fokker Services B.V. to its customers on a confidential basis subject to the provisions of an agreement.

Reproduction or disclosure to third parties of this document or any part thereof, or the use of any information contained the rein for purposes other than exp licitly allowed by the aforesaid agreement, is not permitted except with the prior written permission of Fokker Services B.V.

SB Title: The Modification of the USB Receptacles installed as Part of "Provisions for" EFB

Use this Service Bulletin Quality Reporting Form to tell us your perception of the quality of the Service Bulletin. The reported data that you provide to us will be used to analyze areas of difficulties and to take corrective actions to further improve the quality of our Service Bulletins. We thank you for the time you have taken in completing this form.

* Rate the scale of 1 to 4, with 1 the lowest score and 4 the highest score.

Chapters * 1 2 3 4

a) Quality rating of this SB (overall) □ □ □ □

b) Quality rating of the Planning Information □ □ □ □

c) Quality rating of the Material Information □ □ □ □

d) Quality rating of the Accomplishment Instructions □ □ □ □

e) Quality rating of the Test Instructions (if applicable) □ □ □ □

f) Quality rating of the Illustrations or Drawings (if applicable) □ □ □ □

g) Timely delivery of the SB □ □ □ □

If you have had difficulties with one of the chapters of this Service Bulletin and/or one of your rating(s) is lower than 3, please give a short description of the issue.

Comments:

Operator: Date:

Name / Title:

Please return this form to: Fokker Services B.V.

Engineering, Quality Department P.O. Box 1357 2130 EL Hoofddorp The Netherlands Fax: +31 (0) 88 6280111 or E-mail: technicalservices@fokker.com

Pages 13–13 of 13