Copy · U.S. DOT/FAA - Service Information · 14 pages

© Gulfstream Aerospace Corporation. Filed by the FAA in regulations.gov docket FAA-2010-1164; AD 2012-15-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '64eaf04abcc2ade2c6459b32ef87a4af8c4e689fbdc00a3b47288d623a6a6df7'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SUBJECT

SERVICE BULLETIN

NUMBER 100-28-297

FUEL (ATA 28) – MAIN LANDING GEAR

WHEEL WELL FUEL LINES - INSPECTION AND

ADDITION OF LOOP CLAMPS BETWEEN FUEL

LINES AND ELECTRICAL HARNESSES

JANUARY 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 1 of 12 FUEL - MAIN LANDING *($5WHEEL WELL FUEL LINES - INSPECTION AND ADDITION OF

LOOP CLAMPS BETWEEN FUEL LINES AND ELECTRICAL HARNESSES

PLANNING INFORMATION 100-28-297

1. Effectivity Aircraft serial numbers 004 and 011 through 158

2. Concurrent Requirement None

3. Reason Recently, a G100 operator reported that remnants of sponge-rubber padding were found attached by cable tie-wraps to the fuel lines in the Main Landing Gear (MLG) wheel well. This padding is not approved for installation and was not intended to provide clearance / separation between the fuel lines and electrical harnesses. In addition, under some cable tie-wraps, corrosion was present, caused by moisture being trapped within the open sponge rubber shells.

4. Description This service bulletin provides instructions to remove the sponge-rubber padding from the fuel lines, inspect for corrosion, and treat and / or replace damaged fuel lines as required. Additionally, instructions are provided to install loop clamps to achieve a minimum clearance of 0.5 inches (12.7 mm), between the fuel lines and electrical harnesses.

5. Compliance Compliance with this service bulletin is mandatory at the next suitable planned maintenance period within 24 months.

6. Approval This service bulletin has been reviewed by the Civil Aviation Administration of Israel (CAAI). The design content herein complies with the applicable Civil Aviation Regulations and is CAAI approved.

January 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 2 of 12

7. Manpower The following information is for planning purposes only:

Estimated man-hours: 4 for inspection 14 for corrosion treatment if necessary 7 for clamping procedure if necessary NOTE: Fuel line replacement if required, is not inclusive and will be quoted by the installing facility.

8. Weight and Balance None

9. Electrical Load Data No Change

10. Software Accomplishment Summary None

11. References Astra, Astra SPX and G100 Aircraft Maintenance Manual (AMM), Chapters 20, 24 and 28 Gulfstream Aerospace LP Modification G1-10031 NOTE: The design of MOD G1-10031 is configured to a standard type certificated configuration aircraft. Approval, by the local regulatory authority, of any deviation from the instructions contained in this service bulletin must be obtained, if required, in accordance with the relevant local regulations.

12. Other Publications Affected Astra, Astra SPX and G100 AMM, Chapter 28 Astra, Astra SPX and G100 Illustrated Parts Catalog (IPC), Chapter 28 NOTE: Data concerning this service bulletin will be published in a future revision of the affected manual(s). This service bulletin will provide technical data until the revisions are published.

13. Interchangeability or Intermixability of Parts None January 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 3 of 12

MATERIAL INFORMATION

14. Material - Pric e and Availability The parts required to accomplish this service bulletin are available by contacting Spare Parts Sales at 800-810-GULF (4853) or 912-965-4178.

15. Warranty Coverage - Component None

16. Material Necessary for Each Aircraft NOTE: The parts listed in this section can be substituted with equivalent Israel Aerospace Industries (IAI) approved parts. If equivalent part(s) is used, it must be accompanied by documentation from IAI stating equivalence.

A. Material to be Procured:

NOTE: MS21919WCF clamps may be substituted for AS21919WCF clamps.

B. Materials Supplied by Operator:

Abrasive Paper #400 grit or Scotch-Brite types 7447 (Rough) and 7448 (Fine) or equivalent Acetone Alodine 1200S or equivalent Fluid-resistant epoxy primer-class 2, per BMS 10-11, type 1 New Part No. Keyword Old Part No. Qty.

AS21919WCF04 Loop Clamp - A/R AS21919WCF05 Loop Clamp - A/R AS21919WCF16 Loop Clamp - A/R AS21919WCF20 Loop Clamp - A/R AS21919WCF24 Loop Clamp - A/R NAS1149C0332R Flat Washer - A/R MS27039C1-09 Screw - A/R MS21042L3 Nut - A/R TA4070M0808 90 Deg. Bracket - A/R January 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 4 of 12

17. Reidentified Parts None

18. Special Tooling Concave mirror or a 10 X magnifying glass Digital handheld ultrasonic thickness gauge or equivalent January 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 5 of 12

ACCOMPLISHMENT INSTRUCTIONS CAUTION: PROTECT WIRE BUNDLES, CONNECTORS AND SURROUNDING

STRUCTURE DURING ANY MAINTENANCE PROCEDURES FROM SHAVINGS, DEBRIS AND CONTAMINATION. MAINTAIN A PROPERLY

CLEANED WORK AREA THROUGHOUT THE PROCEDURE TO ENSURE THE INTEGRITY OF THE AFFECTED COMPONENT/SYSTEM. VISUALLY

INSPECT WORK AREA USING ADDITIONAL LIGHT AS NECESSARY TO

VERIFY ABSENCE OF ANY DEBRIS PRIOR TO COMPLETION OF PROCEDURE. FAILURE TO COMPLY MAY RESULT IN DAMAGE TO COMPONENTS AND/OR SYSTEMS.

1. Prepare aircraft for safe maintenance. Refer to AMM, Safe Ground Maintenance Procedure, Chapter 20.

CAUTION: MAKE SURE ELECTRICAL POWER IS DISCONNECTED FROM AIRCRAFT.

FAILURE TO COMPLY MAY RESULT IN INJURY TO PERSONNEL AND/OR DAMAGE TO AIRCRAFT.

2. Disconnect external electrical power from aircraft. Refer to AMM, Chapter 24.

3. Remove left and right MLG doors (16 and 16A) to gain access to the fuel lines listed below. Refer to AMM, Chapter 28 and Figure 1:

4. Rework Procedure:

A. Perform detailed inspection for presence of sponge-rubber padding in the wheel well area, particularly on the fuel lines noted in Step 3. Refer to Figure 2.

(1) If sponge-rubber is pr esent, perform the following (refer to Figure 2, Sheet 1):

(a) Document the sponge-rubber with a digital ca mera. Send photos to Gulfstream Customer Support via email at midcabin.techops@gulfstream.com P/N Description and Function DIA. X Wall Thk.

25W653120-539/-540 Wing tank vent - line connection from the fuselage to the bladder tank

1.00” x 0.035” 25W653120-637/-638 Main vent - li ne connection from the fuselage bladder tank to the NACA scoop

1.50” x 0.035” 25W653120-639/-640 Transfer line from the fuselage bladder tank to the wing tank

1.25” x 0.035” January 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 6 of 12

(b) Cut all the cable tie-wraps attaching the sponge-rubber padding to the fuel lines.

(c) Remove and dispose of cable- tie wraps and remnants of padding.

NOTE: If there are any other fuel lines besides those indicated above that are also wrapped with sponge-rubber, remove the sponge-rubber from all affected fuel lines.

(2) Perform a detailed visual inspection for corrosion on the fuel lines in the areas where sponge-rubber has been used and perform the following as necessary (refer to Figure 2, Sheet 2):

(a) Remove corrosion using abrasive paper #400 grit or 3M Scotch-Brite Types 7447 (Rough) and 7448 (Fine) or equivalent. Blend the surrounding area to a ratio of 10:1 to the depth of the corrosion removed.

(b) Clean the reworked area with acetone and wipe dry.

(c) Ensure that all corrosion has been removed using a concave mirror or a ten (10) X magnifying glass.

(3) Measure the wall th ickness of areas where corrosion has been removed using a digital handheld ultrasonic thickness gauge or equivalent.

(a) Replace any tubes if the minimum thickness is less than follows (refer to IPC, Chapter 28 and AMM, Chapter 28):

1 0.028” for tubes with a nominal thickness of 0.035” (P/Ns 25W653120-539/-540/-637/-638/-639/-640).

2 For others tubes in the immediate area that may have corrosion spots but with wall thickness of 0.028” rework to a minimum thickness of 0.022”.

B. Treat reworked areas with Al odine type 1200S or equivalent.

C. Apply fluid-resistant epo xy primer-class 2, per BMS 10-11, type 1, to reworked areas.

5. Clamping procedure:

NOTE: Inspect the fuel lines and electrical harnesses for separation as depicted in Figure 3, Sheets 1 and 2. The possibility exists that some aircraft may be configured as shown in Figure 3.

A. Install loop clamps (5, 6 or 7) to suit the diameters for each fuel tube. Refer to Figure 3, Details A, B and C.

January 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 7 of 12 B. Install loop clamps (1 or 9) to suit the diameters for the electrical harnesses.

C. Secure the fuel line loop clamps and electrical harness loop clamps together using screws (4), P/N MS27039C1-09, washers (2), P/N NAS1149C0332R and nuts (3), P/N MS21042L3.

D. Where any electrical harnesses intersect or meet fuel tubes, use bracket angle

(8), P/N TA4070M0808, to connect the loop clamps. Refer to Figure 3, Detail C.

6. Reinstall left and right MLG doors (16 and 16A ). Refer to AMM, Chapter 28 and Figure 1.

7. Ensure work area is clean a nd clear of foreign objects (FOD).

8. Record compliance with this service bulletin in the aircraft’s permanent maintenance records and return aircraft to flight status.

9. Report compliance with this service bulletin to Gulfstream CMP via electronic transmittal or fill out and fax the attached service reply card.

NOTE: When reporting compliance with this service bulletin, ensure the questionnaire table within the service reply card is annotated.

If technical assistance is required, contact your area Gulfstream Field Service Representative or call Gulfstream Customer Support at 800-810-GULF (4853) or 912-965-4178 (fax 912-965-4184).

January 21, 2010

Gulfstream

SERVICE BULLETIN Service Bulletin No. 100-28-297 Page 8 of 12 Landing Gear Access Doors Figure 1 January 21, 2010

Page 10OCROpen in PDF

Gulfstream

SERVICE BULLETIN 25W653120-539/-540

ELECTRICAL HARNESSES

01.00" × 0.035"

WING TANK VENT LINE

FUSELAGE BLADDER - WING TANK 25W653120-637/-638

01.50" x 0.035"

MAIN VENT LINE

FUSELAGE BLADDER - NACA SCOOP 25W653120-639/-640 Ø1.25" x 0.035"

TRANSFER LINE

FUSELAGE BLADDER - WING TANK

EXISTING CONDITION

LEFT WHEEL WELL SHOWN RIGHT OPPOSITE

REMNANTS OF

SPONGE-RUBBER

PADDING 25W653120-637 25W653120-539

OUTBOARD FORWARD TYPICAL REMNANTS OF SPONGE-RUBBER PADDING SB100-28-297-02-S01 Wheel Well Inspection Area Figure 2 (Sheet 1) January 21, 2010 Service Bulletin No. 100-28-297 Page 9 of 12

Page 11OCROpen in PDF

Gulfstream

SERVICE BULLETIN

- 25W653120-539 25W653120-637

TYPICAL CORROSION SPOTS Wheel Well Inspection Area Figure 2 (Sheet 2) Service Bulletin No. 100-28-297 Page 10 of 12

Page 12OCROpen in PDF

Gulfstream

SERVICE BULLETIN

ELECTRICAL HARNESSES 25W653120-539/-540 Ø1.00" × 0.035"

WING TANK VENT LINE

FUSELAGE BLADDER - WING TANK 25VV653120-637/-638 Ø1.50" × 0.035"

MAIN VENT LINE

FUSELAGE BLADDER - NACA SCOOP 25V653120-639/-640 Ø1.25" x 0.035"

TRANSFER LINE

FUSELAGE BLADDER - WING TANK

LOCATION OF CLAMPS ADDED LOOP CLAMP (BACK TO BACK) (2 PLACES)

(1) P/N AS21919WCF04 (DIA. 0.250")

(9) P/N AS21919WCF05 (DIA. 0.313") ELECTRICAL HARNESSES (X2) MINIMUM GAP 0.50 INCH

FUEL TUBE

(2) WASHER (5) LOOP CLAMP (2 PLACES) (CUSHIONING SUPPORT) P/N NAS1149C0332R P/N AS21919WCF16 (DIA. 1.00") SB100-28-297-03-S01

(3) NUT P/N MS21042L3

(4) SCREW P/N MS27039C1-09

DETAIL A Installation of Clamps Figure 3 (Sheet 1) January 21, 2010 Service Bulletin No. 100-28-297 Page 11 of 12

Pages 13–14 of 14