Copy · Leonardo Helicopters ASB No. 109-155 · 20 pages

© Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2021-0948; AD 2021-26-24 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '5a4ca68353bc486aa2afccc69e43535b358875964b58d654cd5a565f372fc4ae'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

N° 109-155 DATE: March 13, 2020 REV. : / - January 31, 2020 Page 1 of 19 TITLE ATA 62 - INSPECTION OF MAIN ROTOR BLADES P/N 109-0103-01-115

REVISION LOG New Issue An appropriate entry should be made in the aircraft log book upon accomplishment.

If ownership of aircraft has changed, please, forward to new owner.

Leonardo S.p.A.

Via Giovanni Agusta, 520 21017 Cascina Costa di Samarate (VA) Italy Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595 ALERT

SERVICE BULLETIN

S.B. N°109-155 ALERT DATE: March 13, 2020 Page 2 of 19 REVISION: /

1. PLANNING INFORMATION A. EFFECTIVITY NOTE All main rotor blades P/N 109-0103-01-115 kept at stock should be inspected before their installation on the helicopter.

All Leonardo S.p.a A109A and A109AII helicopters that install main rotor blades P/N 109-0103-01-115.

B. COMPLIANCE Within and not later than 50 (fifty) flight hours or 3 (three) months whichever occurs first after the issue of this Service Bulletin, and subsequently every 24 (twenty-four) months.

C. CONCURRENT REQUIREMENTS N.A.

D. REASON This Service Bulletin is issued in order to introduce a periodical inspection of the Main Rotor Blade P/N 109-0103-01-115.

E. DESCRIPTION A case of internal corrosion of the spar of the M/R Blade P/N 109-0103-01-115 has been reported by LHD Tech. Lab. in the frame of an investigation not related to the subject of this SB. The following investigation concluded that these principles of corrosion, found near the inertia weights between STA1250 and STA1630, had the same root cause of the corrosion phenomena which led to the issuance of the SB 109-111.

In this case, however, the issue has been r elated to a coupled marginality between design and production processes of the M/R Blades.

In order to secure the airworthiness of the fleet, an X -ray inspection on M/R blade P/N 109-0103-01-115 is made mandatory, with an initial compliance time of 50FH/3 months, and following ones every two years.

A terminating action, involving both design and production processes, is currently under development.

S.B. N°109-155 ALERT DATE: March 13, 2020 REVISION: / Page 3 of 19 F. APPROVAL The technical content of this Service Bulletin is approved under the authority of DOA nr.

EASA.21.J.005. For helicopters registered under other Aviation Authorities, before applying the Service Bulletin, applicable Aviation Authority approval must be checked within Leonardo Helicopters customer portal.

EASA states mandatory compliance with inspectio ns, modifications or technical directives and related time of compliance by means of relevant Airworthiness Directives.

If an aircraft listed in the effectivity embodies a modification or repair not LHD certified and affecting the content of this Service B ulletin, it is responsibility of the Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on the aircraft, for any adaptation necessary before incorporation of the present Service Bulletin.

G. MANPOWER To comply with this Service Bulletin 10 (ten) MMH are deemed necessary:

MMH are based on hands -on time and can change with personnel and facilities available.

H. WEIGHT AND BALANCE N.A.

I. REFERENCES

1) PUBLICATIONS A109A/A109AII MM - Maintenance Manual

2) ACRONYMS DOA Design Organization Approval EASA European Aviation Safety Agency LHD Leonardo Helicopters Division MM Maintenance Manual MMH Maintenance Man Hours MMIR Maintenance Malfunction Information Report M/R Main Rotor P/N Part Number SB Service Bulletin

S.B. N°109-155 ALERT DATE: March 13, 2020 Page 4 of 19 REVISION: /

3) ANNEX Annex A X-ray cart n°263 J. PUBLICATIONS AFFECTED A109A/A109AII MM - Maintenance Manual.

K. SOFTWARE ACCOMPLISHMENT SUMMARY N.A.

S.B. N°109-155 ALERT DATE: March 13, 2020 REVISION: / Page 5 of 19

2. MATERIAL INFORMATION A. REQUIRED MATERIALS

1) PARTS N.A.

2) CONSUMABLES The following consumable materials, or equivalent, are necessary to accomplish this Service Bulletin:

# Spec./LHD code number DESCRIPTION Q.TY NOTE PART 1 Commercial Radiograph films 78x300 mm AR (1)(4) 2 Commercial IQI (Image Quality Indicator) AR (2)(4) 3 Commercial IQI (Image Quality Indicator) AR (3)(4) Refer also to AMDI for the consumable materials required to comply with the MM Section referenced in the accomplishment instructions.

3) LOGISTIC MATRIX N.A.

NOTE Refer to Table A below for the approved film kinds.

IQI (hole penetrameter) identified «31, AL» according to ASTM E 1742 or with identification «6, group 02» according to ASTM E 1025.

IQI (hole penetrameter) identified « 25, AL» according to ASTM E 1742 or with identification «5, group 02» according to ASTM E 1025.

Item to procured as local supply.

Film kind Inspection at STA 1354 Inspection at STA 2825 kV mA t (s) kV mA t (s) AGFA D2 80 4 240 70 4 240 FUJI Ix25 75 4 240 70 4 240 KODAK M 75 4 210 70 4 210 Table A: Films approved and indicative parameters.

B. SPECIAL TOOLS The following special tools, or equivalent, are necessary to accomplish this Service Bulletin:

S.B. N°109-155 ALERT DATE: March 13, 2020 Page 6 of 19 REVISION: / # P/N DESCRIPTION Q.TY NOTE PART 4 109-3101-90-101 Film positioning tool 1 5 Commercial Industrial radiographic equipment 1 (B1) Refer also to PTUM for the special tools required to comply with the MM Section referenced in the accomplishment instructions.

SPECIAL TOOLS NOTE This item should have a 60 to 200 kV constant potential, a focal spot of 0,8x0,8 mm max., a beryllium window and the relevant system for film processing.

C. INDUSTRY SUPPORT INFORMATION Owners/Operators who comply with the instructions of this Service Bulletin no later than the applicable date in the “Compliance” section will be eligible to receive REQUIRED MATERIALS on free of charge basis, except for Consumable Materials and Special Tools.

NOTE: Customers who fail to comply with the instructions in this Service Bulletin before the compliance date are not eligible for the aforementioned special policy.

Please Issue relevant MMIR form to your Warranty Administration Dpt.

Due to multiple options envisaged for the application of this Service Bulletin, a Warranty Policy Letter has been issued separately by Leonardo.

S.B. N°109-155 ALERT DATE: March 13, 2020 REVISION: / Page 7 of 19

3. ACCOMPLISHMENT INSTRUCTIONS

GENERAL NOTES

a) Place an identification tag on all components that are re-usable, including the attaching hardware that has been removed to gain access to the modification area and adequately protect them until their later reuse.

b) All lengths are in mm.

CAUTION The personnel in charge of X -ray inspection here required shall be qualified in ac cordance with EN4179/NAS410, or other industry NDT qualification standard recognized by the local airworthiness authority.

1. In accordance with A109A/A109AII MM, prepare the helicopter on ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or the external power supply.

2. In accordance with A109A/A109AII MM Section 65-12, remove the main rotor blades P/N 109-0103-01-115.

3. With reference to Figure 1, clean external surfaces surrounding the spare blade at STA 1354 and STA 2825 (upper and lower sides) using a cheesecloth and neutral solvent.

4. In order to gain access to the inside of the spar blade, in accordance with A109A/A109AII MM Section 65 -12, remove the tip cover and balance weight support by removing mounting screws.

CAUTION The removed parts must be retained for reinstallation in the original position.

5. Perform the Radiographic inspection as follows:

5.1 With reference to Figure 1 , identify the STA 1354 and STA 2825 (areas to radiograph), both on upper and lower sides of spar blade, using a wax pencil.

CAUTION In order t o perform the radiograph inspection, it is necessary to procure a tool that allows the film to be positioned as much as possible in contact with the

S.B. N°109-155 ALERT DATE: March 13, 2020 Page 8 of 19 REVISION: / internal surface of the spar in the areas of inspection and simultaneously stops the back scattered radiation (Refer to Figure 2 for tool local manufacturing or use tool P/N 109-3101-90-101).

CAUTION The tool shall be fabricated in order to avoid scratches or scorings inside the spar during its insertion and withdrawal.

NOTE The inspections shall be carried out in accordance with the requirements of ASTM E 1742 / ASTM E 2104.

5.2 Perform the radiographic inspection at the STA 1354 as follows:

NOTE For each position (STA 1354 upper and lower sides) two exposures double exposition shall be made to obtain two series of original film.

5.2.1 Put the blade under the radiographic equipment at a distance of 1 (one) meter from the focal point and with the upper surface facing upwards so that the axis of the X-ray beam will be:

 perpendicular to the spar surface,  centred with the longitudinal axis of the spar (about 55 mm from the leading edge) at the STA 1354 (ref. Figure 1).

Such a distance must be the same as that measured on the tool of Figure 2 or P/N 109 -3101-90-101 between the cen tre of the film positioning shovel and the reference mark (notch “1”) on the handle.

5.2.2 Protect the area under inspection from back scattered radiation by putting in contact with the lower surface of the blade (the opposite side to the X -ray equipment) a 2 to 3 mm thick sheet of lead of at least 400x400 mm.

5.2.3 Attach a radiographic film of 78x300 mm to the tool shovel with adhesive tape. Using the approved kinds of radiographic films reported in Table A (ref. Required Materials of this Service Bulletin).

5.2.4 Insert the film handling tool inside the spar so that the notch “1” on the handle will align with the tip edge of the spar at the STA 5350.

5.2.5 Put identification lead letters on the spar adjacent to the inspection area, as follows:

S.B. N°109-155 ALERT DATE: March 13, 2020 REVISION: / Page 9 of 19  D1 = upper wall view (and V1 = lowe r wall view for the correspondent second radiographic exposure),  R = direction towards the root end,  E = direction towards the tip end and the S/N of the blade,  an IQI (hole type penetrameter) identified «31, AL» according to ASTM E 1742 or with identifica tion «6, group 02» according to ASTM E 1025.

NOTE Figure 3 shows schematically the film layout and the position of the lead letters that in no way shall interfere with the area to be inspected.

5.2.6 Perform the radiographic exposure as depicted in X -ray card n° 263 (Annex A of this Service Bulletin).

NOTE The indicative inspection pa rameters are reported in Table A (ref. Required Materials of this Service Bulletin);

as a function of each equipment, little variations could be requested to obtain the results defined in paragraph

5.2.7.

5.2.7 The following results shall be achieved:

on the IQI image, the smallest hole shall be visible (the central one),  the radiographic density shall be between 2,0 and 3,0 H&D in both the two "H&D" areas of Figure 3; if it is not possible to obtain this result, two different exposures shall be carried out (one for the area towards the root end and the other for the area towards the tip end), the films for both exposures shall be identified as per paragraph

5.2.5. and in each pertinent "H&D" area of Figure 3 the density shall be 2,0-2,5 H&D.

5.2.8 Turn the blade upside down (lower side facing upwards) and repeat paragraphs from 5.2.1 through 5.2.7.

5.2.9 Develop the films.

NOTE The inspections shall be carried out in accordance with the requirements of ASTM E 1742 / ASTM E 2104.

5.3 Perform the radiographic inspection at the STA 2825 as follows:

S.B. N°109-155 ALERT DATE: March 13, 2020 Page 10 of 19 REVISION: / NOTE For each position (STA 2825 upper and lower sides) two exposures shall be made to obtain two series of original film.

5.3.1 Put the blade under the radiographic equipment at a distance of 1 (one) meter from the focal point and with the upper surface facing upwards so that the axis of the X-ray beam will be:

 perpendicular to the spar surface,  and centred with the longitudinal axis of the spar (about 55 mm from the leading edge) at the STA 2825 (ref. Figure 1).

Such a distance must be the same as that measured on the tool of Figure 2 or P/N 109 -3101-90-101 between the centre of the film positioning shovel and the reference mark (notch “2”) on the handle.

5.3.2 Protect the area under inspection from back scattered radiation by putting in contact with the lower surface of the blade (i.e. the opposite side to the X-ray equipment) a 2 to 3 mm thick sheet of lead of at least 400x400 mm.

5.3.3 Attach a radiographic film of 78x300 mm to the tool shovel with adhesive tape. Using the approved kinds of radiographic films reported in Table A (ref. Required Materials of this Service Bulletin).

5.3.4 Insert the film handling tool inside the spar so that the notch “2” on the handle will align with the tip edge of the spar at the STA 5350.

5.3.5 Put identification lead letters on the spar adjacent to the inspection area, as follows:

 D2 = upper wall view (and V2 = lower wall view for the correspondent second radiographic exposure),  R = direction towards the root end,  E = direction towards the tip end and the S/N of the blade,  an IQI (hole penetrameter) identified «25, AL» according to ASTM E 1742 or with identification «5, group 02» according to ASTM E 1025.

S.B. N°109-155 ALERT DATE: March 13, 2020 REVISION: / Page 11 of 19 NOTE Figure 4 shows schematically the film layout and the position of the lead letters that in no way shall interfere with the area to be inspected.

5.3.6 Perform the radiographic exposure as depicted in X -ray card n°263 (Annex A of this Service Bulletin).

NOTE The indicative inspection parameters are reported in Table A (ref. Required Materials of this Service Bulletin);

as a function of each equipment, little variations could be requested to obtain the results defined in paragraph

5.3.7.

5.3.7 The following results shall be achieved:

 on the IQI image, the smallest hole shall be visible (the central one),  the radiographic density shall be between 2,0 and 2,5 H &D in the "H&D" area of Figure 4.

5.3.8 Turn the blade upside down (lower side facing upwards) and repeat steps 5.3.1 through 5.3.7.

5.3.9 Develop the films.

5.4 In accordance with A109A/A109AII MM Section 65-12, reinstall the balance weight support and tip cover, using the screws previously removed.

5.5 Whilst t he return of the film analysis, in accordance with A109A/A109AII MM Section 65-12, reinstall the main rotor blades P/N 109-0103-01-115.

6. Proceed for film analysis as follows:

6.1 Send to Leonardo Helicopters S.p.a a set of the film to the following address:

__________________________________________________ Technologies Dept.

Leonardo Helicopters - Blades & Composite Rotor Heads CoE Località Paduni, 5 - Anagni (FR), Italy Zip Code: 03012 __________________________________________________ Within 15 days from the receipt of the films, the radiographic results will be returned from Leonardo Helicopters, therefore the blades that require compliance with the radiographic inspection every 24 months, shall be re -identified with the letter “R” marked after the Serial Number on the nameplate.

7. Return the helicopter to a ready to flight condition and record for compliance with this Service Bulletin on the helicopter logbook.

S.B. N°109-155 ALERT DATE: March 13, 2020 Page 12 of 19 REVISION: /

8. Send the attached compliance form to the following mail box:

aw109.mbx.aw@leonardocompany.com As an alternative, gain access to My Communications section on Leonardo WebPortal and compile the “Service Bulletin Application Communication”.

 Non cancellare mai questo segnalibro Non cancellare mai interruzione sezione

Pages 13–20 of 20