Copy · Leonardo Helicopters ASB 119-090 Rev A · 17 pages

© Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2021-0373; AD 2021-16-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'aa3d19f24484aca3c187fb73890bc33e3f898138c5f185f771c5a2d820322a7d'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

N° 1 19-090 DAT E: July 23, 2018 REV. : A - September 14, 2020 Pag e 1 of 16 TITLE ATA 65 - 90° GEARBOX OUTPUT SHAFT, INSPECTION OF

REVISION LOG Revision A is issued in order to:

- add Part I for the identification of the mast gear assy S/N installed on the helicopter;

- update the EFFECTIVITY paragraph with the affected mast gear assy S/Ns;

- update the COMPLIANCE paragraph;

- update the figures.

Revision bars in the outer margin identify changes.

Helicopters which are already complying with the previous issue of this Service Bulletin shall only apply the recurring section of the “Part II” following the compliance time required by this revision (6 months, periodically, from the latest inspection performed).

An appropriate entry should be made in the aircraft log book upon accomplishment.

If ownership of aircraft has changed, please, forward to new owner.

Leonardo S.p.A.

Via Giovanni Agusta, 520 21017 Cascina Costa di Samarate (VA) Italy Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595 ALERT

SERVICE BULLETIN

S.B. N°119-090 ALERT DATE: July 23, 2018 Page 2 of 16 REVISION: A - September 14, 2020

1. PLANNING INFORMATION A. EFFECTIVITY NOTE This Service Bulletin must be applied to all 90° Gearboxes P/N 109-0440-06-101/-105 kept in stock before their installation on the helicopter.

Part I: all the A119/AW119MKII helicopters with the e xception of the ones that are already complying with the previous issue of this SB and that have not changed the TR mast gear assy.

Part II: all the A119/AW119MKII helicopters that install one of the mast gear assy P/N 109-0443-03-107 listed in Table 1.

MAST GEAR ASSY S/N G14993 V47 V48 V49 V51 V54 V55 V56 V57 V59 V74 105 106 107 109 110 111 112 113 115 116 118 119 121 123 124 128 151 156 158 160 161 162 163 164 165 166 167 168 169 170 171 172 180 181 182 183 188 189 190 191 192 193 194 195 198 199 200 201 202 203 204 205 206 207 From AW210 to AW280 Table 1 B. COMPLIANCE Part I: within and not later than 25 flight hours or 3 months whichever occurs first after t he issue of this Service Bulletin.

Part II: within and not later than 25 flight hours or 3 months whichever occurs first after the issue of this Service Bulletin, and then every 6 months.

C. CONCURRENT REQUIREMENTS N.A.

D. REASON This Service Bulletin is issued in order to provide the necessary instructions on how to p erform an endoscopic inspection of the 90° Gearbox Output Shaft P/N 109-0443-03-107 installed on 90° Gearboxes P/N 109-0440-06-101/-105.

S.B. N°119-090 ALERT DATE: July 23, 2018 REVISION: A - September 14, 2020 Page 3 of 16 E. DESCRIPTION Two cases of corrosion of the internal side of the 90° Gearbox Output Shaft have been r eported on AW119MKII helicopters. While the investigation in determining the root cause and the corrective action is ongoing, LHD decided, as a precautionary measure, to issue this SB to introduce a repetitive endoscopic inspection of the potentially affected shafts.

This Service Bulletin, so, provides the instructions on how to perform an endoscopic inspection of the internal side of the 90° Gearbox Output Shaft and, in case corrosion is found, to replace it.

After the issuance of Rev. / of this SB, the ongoing investigation identified additional mast gear assy S/Ns, which could be affected by the corrosion issue. Revision A split this Service Bulletin in two parts to allow the identification of the mast gear assy S/N.

Moreover, Revision A moves the SB applicability from TGB S/Ns to mast S/Ns.

F. APPROVAL The technical content of this Service Bulletin is approved under the authority of DOA n

r. EASA.21.J.005. For helicopters registered under other Aviation Authorities, before applying the Service Bulletin, applicable Aviation Authority approval must be checked within Leonardo Helicopters customer portal.

EASA states mandatory compliance with inspections, modifications or technical directives and related time of compliance by means of relevant Airworthiness Directives.

If an aircraft listed in the effectivity embodies a modification or repair not LHD certified and affecting the content of this Service Bulletin, it is responsibility of the Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on the aircraft, for any adaptation necessary before incorporation of the present Service Bulletin.

G. MANPOWER To comply with this Service Bulletin the following MMH are deemed necessary:

P art I: approximately 1 (one) MMH;

Part II: approximately 3 (three) MMH.

MMH are based on hands-on time and can change with personnel and facilities available.

S.B. N°119-090 ALERT DATE: July 23, 2018 Page 4 of 16 REVISION: A - September 14, 2020 H. WEIGHT AND BALANCE N.A.

I. REFERENCES

1) PUBLICATIONS

DATA MODULE DESCRIPTION PART DM01 MM Section 00-20 Helicopter safety I, II DM02 MM Section 06-40 Access provision I, II DM03 MM Section 12-10 90° Gearbox – Replenishment/Depleting I DM04 MM Section 20-30 Critical parts of helicopter II DM05 MM Section 65-21-6 90° Gearbox - Removal/Installation II DM06 MM Section 64A-00-8 Tail rotor dynamic balancing II DM07 MM Section 64A-00-12 Tail rotor hub and blades assembly - Removal/Installation II DM08 MM Section 64A-31 Pitch change mechanism II

2) ACRONYMS AMDI Aircraft Material Data Information D OA Design Organization Approval EASA European Aviation Safety Agency LHD Leonardo Helicopters Division LSE List of Support Equipment MM Maintenance Manual MMH Maintenance Man Hours MMIR Maintenance Malfunction Information Report N.A. Not applicable P/N Part Number PTUM Pictorial Tool Usage Manual S/N Serial Number WRM Warranty Reply Memo

3) ANNEX N.A.

J. PUBLICATIONS AFFECTED N.A.

S.B. N°119-090 ALERT DATE: July 23, 2018 REVISION: A - September 14, 2020 Page 5 of 16 K. SOFTWARE ACCOMPLISHMENT SUMMARY N.A.

S.B. N°119-090 ALERT DATE: July 23, 2018 Page 6 of 16 REVISION: A - September 14, 2020

2. MATERIAL INFORMATION A. REQUIRED MATERIALS

1) PARTS PART I # P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 1 M83248/1-904 AS3208-04 O-ring 1 (1) -

PART II # P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 2 MS24665-155 Cotter pin 2 (1) - 3 MS24665-285 Cotter pin 2 (1) - 4 MS24665-302 Cotter pin 1 (1) - Refer also to IPC for the spares materials required to comply with the MM Section referenced in the accomplishment instructions.

2) CONSUMABLES T he following consumable materials, or equivalent, are necessary to accomplish this Service Bulletin:

# Spec./LHD code number DESCRIPTION Q.TY NOTE PART 5 MIL-PRF-23699 or DOD-L-85734 Lubricating oil AR (1)(2) I 6 MS20995C32 Lockwire Nonelectrical (C014) AR (1) I, II 7 TT-N-95, Type II Aliphatic Naptha (C059) AR (1) II 8 MIL-A-46106, Group 1, Type 1 Adhesive silicone RTV 732 (C537) AR (1) II Refer also to AMDI for the consumable materials required to comply with the MM sections referenced in the accomplishment instructions.

3) LOGISTIC MATRIX N .A.

NOTE

(1) Item to be procured as local supply.

(2) Refer to RFM or MM Paragraph 12-00-6 for approved oils.

S.B. N°119-090 ALERT DATE: July 23, 2018 REVISION: A - September 14, 2020 Page 7 of 16 B. SPECIAL TOOLS The following special tools, or equivalent, are necessary to accomplish this Service B ulletin:

# P/N DESCRIPTION Q.TY NOTE PART 9 109-3130-83-131 Tool set, tail rotor retaining nuts removal/installation (LSE No. 37) 1 (B1) II 10 109-3130-85-133 Tool set, tail rotor pitch change mechanism bearings removal/installation (LSE No. 60) 1 (B1) (B2) II 11 Commercial Endoscope 1 (B3) I, II Refer also to PTUM for the special tools required to comply with the MM Sections referenced in the accomplishment instructions.

SPECIAL TOOLS NOTE Please contact Leonardo Helicopters Division order administration to request the tools supply on loan. As soon as the present Service Bulletin is implemented the tools supplied on loan shall be promptly returned to Leonardo Helicopters Division.

P/N 109-3130-85-101 may be supplied as alternative.

Item to be procured as local supply. Part I execution is guaranteed with an endoscopic flexible probe with a diameter less or equal to 4mm.

C. INDUSTRY SUPPORT INFORMATION Parts will be provided under warranty if either the helicopter or the component falls w ithin the standard warranty period (ref. Contractual Warranty Policy).

Please Issue relevant MMIR form to Leonardo Portal or to your Warranty Administration Dpt.

NOTE: WRM will include RETURN MATERIAL AUTHORIZATION (RMA) number; the 90° gearbox (109-0440-06-101/-105) removed from the aircraft has to be returned to LHD as per instructions defined into LHD Information Letter GEN-15-047.

S.B . N°119-090 ALERT DATE: July 23, 2018 Page 8 of 16 REVISION: A - September 14, 2020

3. ACCOMPLISHMENT INSTRUCTIONS

GENERAL NOTES

a) Place an identification tag on all components that are re-usable, including the attaching hardware that has been removed to gain access to the modification area and adequately protect them until their later re-use.

b) Note safety wire routing in order to repeat it during reinstallation.

PART I

1. In accordance with MM Section 00-20, prepare the helicopter on ground for a safe maintenance. Disconnect all electrical power sources and/or the external power supply.

2. With reference to MM Section 06-40, remove access panels P11.

3. With reference to MM Section 12-10, drain the oil of the 90° gearbox assy.

CAUTION Pay particular attention to not damage the mast gear assy and all the 90° gearbox assy components with the endoscope probe during the inspection.

4.

5.

Reinstall all the hardware removed from the 90° gearbox assy.

6. With reference to MM Section 12-10, refill the oil of the 90° gearbox assy.

7. With reference to MM Section 06-40, reinstall access panels P11.

8. Return the helicopter to a ready to flight condition and record for compliance with Part I of this Service Bulletin on the helicopter logbook.

9. Send the attached compliance form to the following mail box:

engineering.support.lhd@leonardocompany.com As an alternative, gain access to My Communications section on Leonardo WebPortal and compile the “Service Bulletin Application Communication”.

With reference to Figure 1 Detail A, gain access to the internal surface of the TGB through the oil drain hole and, with the help of an endoscope, identify the S/N of the mast gear assy marked on the bottom part of the mast gear as per Figure 1 Detail B. If the S/N is not immediately visible, rotate clockwise the tail rotor blade to allow the S/N identification.

S.B. N°119-090 ALERT DATE: July 23, 2018 REVISION: A - September 14, 2020 Page 9 of 16

PART II

CAUTION For correct handling and information related to “CP” (Critical Part) refer to MM Section 20-30.

1. In accordance with MM Section 00-20, prepare the h elicopter on ground for a safe maintenance. Disconnect all electrical power sources and/or the external power supply.

2. With reference to MM Section 06-40, remove access panels P11 and P12.

3. Remove the tail rotor hub and blades assembly and the assembly made by crosshead, scissors, pitch links and pitch change control rod as described in the following procedure:

3.1 With reference to Figure 2 Detail C, cut safety wire securing plug (24) to duplex bearing housing (32) and remove plug.

3.2 With reference to Figure 2 Detail C and in accordance with MM Section 64A-31, remove cotter pin (25) and nut (26) on pitch change control rod aft end using tool P/N 109-3130-83-131 (LSE NO 37). Remove washer (27).

CAUTION Exercise care not to dismantle duplex bearing or to detach it from its housing.

3.3 With reference to Figure 2 Detail C, temporarily reinstall plug (24) to avoid accidental detachment or disassembly of the duplex bearing inside the duplex bearing housing. Tighten the plug manually.

NOTE Mark position of rotating scissors in order to reinstall them in original position.

3.4 With reference to Figure 3 Detail D and in accord ance with the applicable steps of MM Section 64A-00-12, detach aft half scissors (17) from sleeve fitting (22) by removing cotter pin (11), nut (12), washers (13, 15), sleeve (27) and bolt (16).

Discard cotter pin.

3.5 With reference to Figure 3 Detail D and in accordance with the applicable steps of MM Section 64A-00-12, disconnect pitch change control links (5) from tail rotor blade and retain the fixing hardware. Discard cotter pin.

3.6 With reference to Figure 3 Detail D, repeat steps 3.4 thru 3.5 to disconnect the other scissor from the sleeve and the other link from the hub.

3.7 With reference to Figure 3 Detail D, cut safety wire securing sleeve (22) to retaining nut (20).

S.B. N°119-090 ALERT DATE: July 23, 2018 Page 10 of 16 REVISION: A - September 14, 2020

CAUTION Pay particular attention while removing the control rod from the 90° Gearbox Output Shaft to not touch the internal side of it.

3.8 With reference to Figure 3 Detail D, remove crossh ead (6) together with pitch change control links, scissors, forward boot and control rod using a suitable puller. Detach forward boot.

3.9 With reference to Figure 3 Detail D and in accordance with the applicable steps of MM Section 64A-00-12, straighten the two tabs of lockwasher (21) and remove retaining nut (20) by using tool P/N 109-3130-83-131 (LSE NO 37).

3.10 With reference to Figure 3 Detail D, remove sleeve fitting (22).

3.11 With reference to Figure 3 Detail D, remove tail rotor hub and blades assembly

(1).

3.12 With reference to Figure 3 Detail D, remove forward and aft bushings (23, 24).

3.13 With reference to Figure 3 Detail D, remove bumper washer (25) and balance flange (26).

CAUTION Pay particular attention while inspecting the internal surface of the 90° Gearbox Output Shaft to avoid scratches caused by the endoscope.

4. With reference to Figure 1, with the help of an en doscope, carefully inspect the whole internal surface of the 90° Gearbox Output Shaft for corrosion (ref Figure 4). No corrosion allowed.

5. In case no corrosion is found, go to step 7.

6. In case corrosion is found, in accordance with MM Section 65-21 replace the unserviceable 90° Gearbox.

CAUTION During the assembly follow the correct sequence in installing the parts. Special care should be exercised when securing the lock washer to avoid scratching or denting the aluminum trunnion. It is recommended that non-metallic tools are used to secure the locking washer.

7. Reinstall the tail rotor hub and blade assembly an d the assembly made of crosshead, scissors, pitch links and pitch change control rod as described in the following procedure:

S.B. N°119-090 ALERT DATE: July 23, 2018 REVISION: A - September 14, 2020 Page 11 of 16

7.1 With reference to Figure 3 Detail D, degrease splines of output shaft sleeve (22) and balance flange (26) with Aliphatic naphtha (C059).

7.2 With reference to Figure 3 Detail D, install balance flange (26) and bumper washer (25) on 90° Gearbox Output Shaft.

7.3 With reference to Figure 3 Detail D, apply a light coat of silicone adhesive (C537) to forward and aft bushings (23, 24) and yoke mating surfaces. Press bushings on seat using suitable fabricated adapters.

7.4 With reference to Figure 3 Detail D, align the splines of hub trunnion with corresponding splines of 90° Gearbox Output Shaft and install tail rotor hub and blades assembly (1) on 90° Gearbox Output Shaft.

7.5 With reference to Figure 3 Detail D, install sleeve (22) and lockwasher (21).

Install retaining nut (20) by using tool P/N 109-3130-83-131 (LSE NO 37). Torque nut 58.8 to 68.6 Nm.

7.6 With reference to Figure 3 Detail D, bend two new tabs of lockwasher (21) outboard over retaining nut (20).

7.7 With reference to Figure 3 Detail D, safety retaining nut (20) to sleeve (22) using safety wire MS20995C32 (C014).

7.8 With reference to Figure 3 Detail D, install forward boot (19).

7.9 With reference to Figure 2 Detail C, remove plug (24) from the duplex bearing housing.

CAUTION Make sure not to disassemble or detach the duplex bearing during following steps.

CAUTION Exercise extreme care when you handle the duplex bearing assembly to prevent its disassembly. If you accidentally disassemble the duplex bearing reassemble as necessary.

CAUTION When installing the control rod, make it slide inside the aft boot (34) and duplex bearing housing (32).

7.10 With reference to Figure 3 Detail D, install cro sshead (6) together with pitch change control links, scissors and control rod.

7.11 With reference to Figure 2 Detail C and in accordance with the applicable steps of MM Section 64A-31, install washer (27) and nut (26) on control rod. Torque nut

30.5 to 33.9 Nm using tool P/N 109-3130-83-131 (LSA NO 37). Install cotter pin

S.B. N°119-090 ALERT DATE: July 23, 2018 Page 12 of 16 REVISION: A - September 14, 2020 P/N MS24665-302 on the nut (26).

7.12 With reference to Figure 2 Detail C and in accordance with the applicable steps of MM Section 64A-31, verify that the assembled duplex bearing is against the shoulder of control rod.

7.13 With reference to Figure 2 Detail C, install plug (24) and torque at 30.5 to 33.9 Nm using tool P/N 109-3130-85-133 (LSE NO 60). Safety plug to duplex bearing housing (32) using safety wire P/N MS20995C32 (C014).

7.14 With reference to Figure 3 Detail D and in accordance with the applicable steps of MM Section 64A-00-12, install half scissor (17) on sleeve fitting (22). Exercise care to correctly seat sleeve flange. Torque nut 3.4 to 4.5 Nm. Install cotter pin P/N MS24665-155.

NOTE With reference to Figure 3 Detail D, ensure that bolt head (16) is facing tail rotor sense of rotation.

7.15 Repeat step 7.14 for other scissors attachment.

7 .16 With reference to Figure 3 Detail D, put the bevelled washer (18) in its position on the blade pin. Make sure to put it with the beveled side against the blade pin.

7.17 With reference to Figure 3 Detail D and in accordance with the applicable steps of MM Section 64A-00-12, install pitch change control link (5) on tail rotor blade.

Torque nut to 7.9 – 10.2 Nm. Install cotter pin P/N MS24665-285.

7.18 Repeat steps 7.16 and 7.17 to install the other link on the blade.

7.19 Check tail rotor for freedom of movement on flapping axis. Check tail rotor blades for freedom of movement on pitch change axis.

8. Install access panels P11 and P12.

9. In accordance with MM Section 64A-00-8 check dynamic balancing of tail rotor.

10. Return the helicopter to a ready to flight condition and record for compliance with Part II of this Service Bulletin on the helicopter logbook.

11. Send the attached compliance form to the following mail box:

engineering.support.lhd@leonardocompany.com As an alternative, gain access to My Communications section on Leonardo WebPortal and compile the “Service Bulletin Application Communication”.

Pages 13–17 of 17