Copy · Leonardo Helicopters BT No. 139-450 Rev B · 63 pages

© Leonardo S.p.A. Filed by the FAA in regulations.gov docket FAA-2020-0283; AD 2021-23-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '758f55ab3fdd15b741f2c905ca41906007282cf55f5e9cd84301bc396c67c0f3'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

BOLLETTINO TECNIC O N° 139-450 The technical content of this document is approved under the authority of DOA nr. EASA.21J.005 DATE April 20, 2016 REV. B – November 25, 2016 Compliance with this bulletin is:

Page 1 of 62 SUBJE CT

MAIN ROTOR (MR) DAMPER INSPECTIONS REASON To introduce a new one off and a new periodic inspection and to collect the existing periodic inspections of MR damper.

HELICOPTERS AFFECTED NOTE This Bollettino Tecnico cancels and supersedes BT 139-410 R ev. A and BT 139-446.

Part I: a ll MR dam pers P/N 3G6220V01351, P/N 3G6220V01352 and P/N 3G6220V01353 installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

All MR dampers P/N 3G6220V01351, P/N 3G6220V01352 and P/N 3G6220V01353 kept in stock that have logged three hundred (300) flight hours or more since new.

Part II: all MR dampers that have been already inspected according to Part I and that have replaced the rod end assy with a component P/N M006-01H004-041 or

MANDATORY An appropriate entry should be made in the aircraft log book upon accomplishment.

If ownership of aircraft has changed, please, forward to new owner.

Leonardo S.p.A.

Via Giovanni Agusta, 520 21017 Cascina Costa di Samarate (VA) Italy Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595

B.T. 139-450 Rev. B

P age 2 of 62

P/N M006-01H004-045 or P/N M006-01H004-053 not marked as per BT139- 450 figure 7.

Part III: all body ends P/N M006-01H002-041 or P/N M006-01H002-047 or P/N M006- 01H046-041 and rod ends P/N M006-01H004-041 or P/N M006-01H004- 045 or P/N M006-01H004- 053, part of MR dampers P/N 3G6220V01351, P/N 3G6220V01352 and P/N 3G6220V01353 installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

Part IV: all body ends P/N M006-01H002-041 or P/N M006-01H002- 047 or P/N M006- 01H046-041 and rod ends P/N M006-01H004-041 or P/N M006-01H004- 045 or P/N M006-01H004- 053, part of MR dampers P/N 3G6220V01351, P/N 3G6220V01352 and P/N 3G6220V01353 installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

Part V: all MR dampers P/N 3G6220V01351 and P/N 3G6220V01352 up to S/N MCR8086 included, that are installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237) and have accumulated less than 600 flight hours since new.

Part VI: all AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237) equipped with MR dampers P/N 3G6220V01351 or P/N 3G6220V01352 or P/N 3G6220V01353.

Part VII: all MR dampers P/N 3G6220V01351 and all MR dampers P/N 3G6220V01352 up to S/N MCR8764 (included) having rod end P/N M006- 01H004-041 or -045 or -053, except MR dampers listed in table 1 of Annex A and MR dampers marked with “BT 139-446 Part II” or “BT 139-446 Part III” on the logcard, installed on AB139 / AW139 helicopters (except S/N 31004, S/N 31007 and S/N 41237).

all MR dampers P/N 3G6220V01351 and P/N 3G6220V01352 that have removed the damper rod end assy in accordance with AMP procedure before the issue of Bollettino Tecnico 139-446, even if they have S/N higher than MCR8764 or they are listed in table 1 of Annex A.

Part VIII: all MR dampers P/N 3G6220V01351 and all MR dampers P/N 3G6220V01352 up to S/N MCR8764 (included) having rod end assy P/N

B.T. 139-450 Rev. B

Page 3 of 62

M006-01H004-041 or - 045 or -053, except MR dampers listed in table 1 of Annex A and MR dampers marked with “BT 139 -446 Part II” or “BT 139 -446 Part III” on the logcard, kept in stock.

NOTE MR damper ends marked as per BT139-450 figure 7 a re not affected by part I and part II of this Bollettino Tecnico.

NOTE The MR damper exact S/N may be composed of e ither four or five digits, possibly preceded by letters MCR and/or followed by letters A and/or B. For the purpose of the present instructions, only valid numerical characters are considered, neglecting “MCR”, “A”, “B” and initial zeros.

Possible examples follow:

 S/N 0272 will be referred to as S/N 272;

 S/N 00344AB will be referred to as S/N 344;

 S/N MCR1848A will be referred to as S/N 1848;

 S/N MCR07568 will be referred to as S/N 7568;

 S/N MCR10755 will be referred to as S/N 10755;

MAG confirms that no duplicates exist in the valid numerical digits of item serialization (that means that only one among S/N 715, S/N MCR0715, S/N MCR00715 or S/N MCR0715AB exists).

B.T. 139-450 Rev. B

P age 4 of 62

COMPLIANCE NOTE Rod end and body end time since new or since o verhaul can be computed based on removal/installation data recorded on MR damper logcard Section 2.

Part I:

 within thirty (30) flight hours since receipt of this Bollettino Tecnico or at first MR damper removal, whichever comes first, on MR dampers that have logged three hundred (300) flight hours or more since new.

 within thirty (30) flight hours since receipt of this Bollettino Tecnico or when they reach three hundred (300 ) flight hours since new, whichever occurs later , on MR dampers that have not already logged three hundred (300) flight hours.

 before next installation on the helicopter for MR dampers kept in stock that have logged three hundred (300) flight hours or more since new.

Part II: three hundred ( 300) flight hours after the replacement of the rod end assy.

Part III:

 For rod end, after the last flight of each day or before the first flight of each day since the rod end has logged three hundred (300) flight hours or more since new or since overhaul.

 For body end, after the last flight of each day or before the first flight of each day since the body end has logged three hundred (300) flight hours or more since new and until it has logged twelve hundred (1200) flight hours since new.

Part IV:

 For rod end o within thirthy (30) flight hours since receipt of this Bollettino Tecnico and then every ten (10) flight hours for rod ends that have logged less than three hundred (300) flight hours since new or since overhaul.

o after the last flight of each day or before the first flight of each day since the rod end has logged three hundred (300) flight hours or more since new or since overhaul.

B.T. 139-450 Rev. B

Page 5 of 62

 For body end o within thirthy (30) flight hours since receipt of this Bollettino Tecnico and then every ten (10) flight hours for body ends that have logged less than three hundred (300) flight hours since new.

o after the last flight of each day or before the first flight of each day since the body end has logged three hundred (300) flight hours or more since new and until it has logged twelve hundred (1200) flight hours since new.

Part V: within thirthy (30) flight hours since receipt of this Bollettino Tecnico and then every twenty (20) flight hours until the affected damper reaches six hundred

(600) flight hours Time Since New.

Part VI: within fifty (50) flight hours since receipt of this Bollettino Tecnico and then every one hundred (100) flight hours.

Part VII: within fifty (50) flight hours since receipt of this Bollettino Tecnico.

Part VIII: within three (3) months since receipt of this Bollettino Tecnico or before the first installation on the helicopter, whichever is first.

NOTE For part IV and part V the compliance time must be sch eduled starting from the date of the last inspection performed according to BT 139-410, if this has been already accomplished at least one time.

For part VI the compliance time must be scheduled starting from the date of the last inspection performed according to BT 139-446 part I, if this has been already accomplished at least one time.

Compliance with part VII and VIII is not required for helicopters / parts that have already accomplished BT 139-446 part II or part III respectively.

DESCRIPTION Some failures of MR damper in the inboard spherical bearing area were exp erienced by AW139 fleet; in addition, cases of rod end loosening were reported. This Bollettino

B.T. 139-450 Rev. B

P age 6 of 62

Tecnico introduces the inspections of the MR damper while the investigation is still ongoing.

With Revision A an Eddy current inspection was introduced as valid alternative to the ones already prescribed with the first issue and the checks on the body end were limited up to 1200 flight hours while for body ends having logged more than 1200 flight hours since new a more stringent inspection program is provided in BT 139-452.

Present Revision B is issued to introduce new MR damper P/N 3G6220V01353, fitting the new body end P/N M006-01H046-041.

REQUIRED MANPOWER To comply with this Bollettino Tecnico the following maintenance man-hou rs (MMH) are deemed necessary:

Part I: six (6) MMH;

Part II: four (4) MMH;

Part III: half (0.5) MMH Part IV: half (0.5) MMH;

Part V: half (0.5) MMH;

Part VI: two (2) MMH;

Part VII: five (5) MMH;

Part VIII: half (0.5) MMH for each MR damper.

Man-hours are based on hands-on time and may change with personnel and facilities available.

WARRANTY  Owners/Operators who comply with the instructions of this Bollettino Tecnico, no later than the applicable date in the “Compliance” section will be eligible to receive Main Rotor Damper or a Rod End Assy, as applicable, on a free of charge basis, except for Consumable Materials & Special Tools.

 Please Issue relevant M.M.I.R. form ( (M)aintenance (M)alfunction (I)nformation (R)eport ) to your Warranty Administration Dpt.

B.T. 139-450 Rev. B

Page 7 of 62

REQUIRED MATERIALS NOTE A MR damper or a rod end assy, as applicable, can b e ordered to Leonardo Helicopters (LHD) only in case replacement is requested by this Bollettino Tecnico.

MR damper P/N 3G6220V01353 is fully interchangeable and mixable on the same MR Hub with a damper with different P/N.

If a MR damper P/N 3G6220V01353 is furnished to replace a damper with different P/N, also a new antirotation block P/N 3G6220A05353 must be supplied to replace the existing one.

The new anti-rotation block P/N 3G6220A05353 can be used also with damper with different P/N.

The following consumable materials, or equivalent, are required for complianc e with this Bollettino Tecnico:

Spec./AW code number DESCRIPTION Q.TY NOTE Commercial Masking tape, adhesive AR Local supply (1) Commercial Clean, lint-free, dry cloth (C011) or absorbent toweling AR Local supply (1) QPL-AMS2644 Penetrant, Type II, M ethod C, in aerosol container AR Local supply (1) QPL-AMS2644 Solvent remover, class 2, i n aerosol container AR Local supply (1) MS20995C41 Safety wire (C241) AR Local supply (2) PERMACEL P422 Cod. No.

900002514 or 900002515 or 900002516 or 900002517 Tape, antifretting AR Local supply (2) MIL-PRF-85285, Ty. I Color N° 37038 Polyurethane paint, black AR Local supply (1)

B.T. 139-450 Rev. B

P age 8 of 62

Spec./AW code number DESCRIPTION Q.TY NOTE TT- N- 95 Aliphatic naphtha (C059) AR Local supply (4) / Strap, tiedown, 2 Local supply Refer also to AMDI for the consumable materials required to comply with the AM P DM referenced in the compliance instructions.

SPECIAL TOOLS The following special tools, or equivalent, are required for compliance with th is Bollettino Tecnico:

SPEC./AW Code Number DESCRIPTION Q.TY NOTE RMGE-DS-06-2010- LH or approved alternative Platform, left (GG-01- 00) AR (3) / Magnifying glass, 5 x 1 Local supply

(1) (4)

/ Brush, fine tipped 1 Local supply (

1) Commercial Luxmeter 1 Local supply (

1) / Small, clean, dry, not contamined recip ient (beaker or equivalent) 1 Local supply (

1) Commercial Mirror 1 Local supply

(4) (5)

Commercial Torque wrench (capability up to 1 00 Nm - 885 lb in) 1 Local supply (

2) (6) Commercial Spanner 1-5 /16” 1 Local supply (

2) Commercial Spanner 5/8” 1 Local supply (

2) (6) (7)

B.T. 139-450 Rev. B

Page 9 of 62

SPEC./AW Code Number DESCRIPTION Q.TY NOTE Commercial Digital centesimal caliper Local supply

(6)

Refer also to ITEP for the special tools required to comply with the AMP DM reference d in the compliance instructions.

Notes

(1) Required for compliance with part I and part II, in order to perform the dye penetrant inspection. Refer to Annex B for consumable materials and special tools required for the Eddy Current inspection.

(2) Required for compliance with part VII and part VI II.

(3) Refer to Illustrated Tools and Equipment Publication (ITEP). See DM n° 39-A- GG- 02-00-00A-066A-A.

(4) Required for compliance with part III.

(5) Required for compliance with part V.

(6) Required for compliance with part VI.

(7) On new body end P/N M006-01H046-041 of MR damper P/N 3G6220V01353 use a spanner 11/16”.

WEIGHT AND BALANCE CHANGES N.A.

REFE RENCES  AW139 Aircraft Materials Data Information (AMDI)  AW139 Aircraft Maintenance Publication (AMP)  AW139 Illustrated Tools and Equipment Publication (ITEP)

PUBLICATIONS AFFECTED  AW139 Illustrated Parts Data (IPD)

B.T. 139-450 Rev. B

P age 10 of 62

COMPLIANCE INSTRUCTIONS Part I NOTE Skip steps 1 thru 3 when performing the inspection o n the MR dampers kept in stock.

1. Prepare the helicopter for a safe ground maintenance. Disconnect the battery and all the electrical power sources and/or the external power supply. Refer to AMP, see DM n° 39-A-00-20-00-00A-120A-A.

2. Put the platform (GG- 01-00), or an approved alternative, adjacent to the left side of the fuselage.

3. Remove the MR dampers. Refer to AMP, see DM n° 39-A-62-22-02-00A-520A-A.

NOTE It is suggested to start the inspection on all the MR d ampers at the same time.

NOTE As an alternative to the dye penetrant inspection d escribed at following step 4, it is allowed to perform the Eddy Current inspection, according to Annex B.

4. With reference to figures 1 thru 6, perform the dye penetrant inspection of the MR damper. Operative conditions and inspection sequence shall be compliant with ASTM E1417, in particular the following steps shall be followed:

4.1. Put the MR damper on a suitable work bench, as shown in figure 2.

4.2. With reference to figure 3, on each spherical bearing, protect the liner with masking tape as follows:

NOTE The areas to be inspected are shown in figure 1 (one side shown, the other is symmetrical), identified by the red boxes.

B.T. 139-450 Rev. B

Page 11 of 62

CAUTION Make sure that the solvent does not come in contact w ith the spherical bearing liner.

4.2.1. Clean the surface on both sides of both ends with a clean cloth ( C011) soaked with solvent. Let the solvent air dry.

NOTE If there are slippage marks in the areas to be insp ected, remove the paint, from the damper end surface only, using solvent.

CAUTION Make sure that the adhesive masking tape adheres co mpletely to the damper ends surface, when performing following step 4.2.2.

4.2.2. Protect the surface all around the areas to be inspected according to f igures 3 thru 5, using adhesive masking tape. Make sure that the tape is tangent to the bearing seat, according to figures 4 and 5.

4.3. Inspect the damper ends as follows:

CAUTION Make sure that, during the inspection, the part is a lways under appropriate illumination. The lighting system shall provide at least 1000 lx (100 fc) at the examination surface. Use the luxmeter to confirm this condition.

4.3.1. Clean the areas to be inspected, on both sides of both ends, with a clean cloth (C011) soaked with solvent. Let the solvent air dry.

CAUTION Make sure that the recipient is clean, dry and free f rom any contaminant.

4.3.2. Put a few drops of penetrant in a small recipient (beaker or equivalent).

B.T. 139-450 Rev. B

P age 12 of 62

CAUTION Make sure not to apply too much penetrant, when p erforming following step 4.3.3.

4.3.3. Apply the penetrant with a clean, dry, fine tipped brush on all the areas to be inspected, according to figure 6 (same application to be carried out on the other side). Let the penetrant dwell.

NOTE Dwell time must be at least one hour and no more th an two hours.

4.3.4. Clean the penetrant in excess by first with a clean, dry, lint-free cloth (C011) or absorbent towelling.

4.3.5. If penetrant in excess remain, remove it with a solvent dampened lintfree cloth (C011) or towel , until the penetrant in excess has been completely removed. Let the solvent air dry.

4.3.6. Let the penetrant develop for at least thirty minutes without developer.

4.3.7. Inspect the areas shown in figure 1 using the magnifying glass.

4.3.7.1. If you don’t find indication of cracks, go to step 4.4.

4.3.7.2. If you find indication of cracks, confirm the crack by wipe-off.

4.3.7.3. If, at step 4.3.7.2, you have confirmed presence of cracks on the body end or on the rod end, contact Product Support Engineering ( CSE.AW139.AW@leonardocompany.com) for further instruction.

4 .4. Remove the adhesive masking tape from all the serviceable damper ends.

CAUTION Make sure that the solvent does not come in contact w ith the spherical bearing liner.

4.5. Clean all the surfaces on both sides of both ends using a cloth ( C011) soaked with solvent until all the penetrant has been removed.

4.6. Mark a black dot, using polyurethane black paint, on the rod end and on the body end, in positions shown in figure 7.

Pages 13–24 of 63