TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '56ad8e6eeefc700dccb7d5b8455d39a266ec6a1ad9888159904481d02c23e8cb' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '56ad8e6eeefc700dccb7d5b8455d39a266ec6a1ad9888159904481d02c23e8cb' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
N ° 139-661 D ATE: February 4, 2021 REV. : A - February 18, 2021 P age 1 of 22 TITLE ATA 24 – OVERHEAD PANEL INSPECTION
REVISION LOG Helicopters already compliant with Part I of the first issue of this Service Bulletin do not need to comply with the Part I of the revision A of this Service Bulletin.
Revision A of this Service Bulletin has been issued to:
Introduce alternative tape P/Ns;
Update fastener measurement procedure.
An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
Leonardo S.p.A.
Via Giovanni Agusta, 520 21017 Cascina Costa di Samarate (VA) Italy Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595 ALERT
SERVICE BULLETIN
S.B. N°139-661 ALERT DATE: February 4, 2021 Page 2 of 22 REVISION: A - February 18, 2021
1. PLANNING INFORMATION A. EFFECTIVITY Part I:
All AB/AW139 helicopters from S/N 31005 thru S/N 31927, from S/N 41001 thru S/N 41576 and from S/N 41801 thru S/N 41806, except the S/Ns listed in table 1.
HELICOPTERS S/Ns 31789 31899 31916 31792 31900 31917 31800 31901 31919 31803 31902 31921 31814 31903 31924 31836 31907 41562 41563 41574 Table 1
Part II:
All AB/AW139 helicopters.
B. COMPLIANCE Part I:
Within and not later than twenty-five (25) FH from the first issue date of this Service Bulletin.
Part II:
Every three hundred (300) FH or one (1) year whichever occurs first after the compliance with Part I of this Service Bulletin or after the first issue date of this Service Bulletin for those helicopters for which the Part I is not applicable.
C. CONCURRENT REQUIREMENTS N.A.
S.B. N°139-661 ALERT DATE: February 4, 2021 REVISION: A - February 18, 2021 Page 3 of 22 D. REASON This Service Bulletin is issued in order to prescribe an inspection of the overhead panel cable harnesses, anchor nuts, screws and supports, to locate potential chafing conditions.
E. DESCRIPTION Part I of this Service Bulletin is developed to prescribe a one-off inspection inside the overhead panel, in order to check:
the absence of chafing between the anchor nuts/screws and the cable harnesses;
the correct lengths of the screws fixing the Circuit Breaker Panel and the lining panels prescribing, in case of findings, their replacement with new ones;
the condition of the supports fixing the cable harnesses;
the presence of a clearance of at least 10.0 mm between an anchor nut and the cable harnesses. In case the clearance is not respected, cable harnesses must be properly re-routed.
Moreover, this SB prescribes the application of a white protective tape on the anchor nuts in order to avoid chafing with the cable harnesses.
Part II of this Service Bulletin is developed to prescribe a recurrent inspection inside the overhead panel in order to check the tape condition and the absence of chafing.
F. APPROVAL The technical content of this Service Bulletin is approved under the authority of DOA nr.
EASA.21.J.005. For helicopters registered under other Aviation Authorities, before applying the Service Bulletin, applicable Aviation Authority approval must be checked within Leonardo Helicopters customer portal.
EASA states mandatory compliance with inspections, modifications or technical directives and related time of compliance by means of relevant Airworthiness Directives.
If an aircraft listed in the effectivity embodies a modification or repair not LH certified and affecting the content of this Service Bulletin, it is responsibility of the Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on the aircraft, for any adaptation necessary before incorporation of the present Service Bulletin.
G. MANPOWER To comply with this Service Bulletin, the following MMH are deemed necessary:
Part I: approximately six (6) MMH if terminal boards bonding and/or cable harness rerouting are also required, otherwise approximately three (3) MMH;
Part II: approximately two (2) MMH;
S.B. N°139-661 ALERT DATE: February 4, 2021 Page 4 of 22 REVISION: A - February 18, 2021 MMH are based on hands-on time and can change with helicopter configuration, personnel and facilities available.
H. WEIGHT AND BALANCE N.A.
I. REFERENCES
1) PUBLICATIONS Following Data Modules refer to AMP:
DATA MODULE DESCRIPTION PART DM01 39-A-00-20-00-00A-120A-A Helicopter on ground for a safe maintenance.
I, II DM02 39-A-24-91-01-00A-520A-A Circuit breaker panel - Remove procedure I,II DM03 39-A-24-91-01-00A-720A-A Circuit breaker panel - Install procedure I,II DM04 39-A-20-10-19-00A-920A-A Plastic loom support - Replacement I
2) ACRONYMS & ABBREVIATIONS AMP Aircraft Maintenance Publication AR As Required ATA Air Transport Association DM Data Module DOA Design Organization Approval EASA European Aviation Safety Agency FH Flying Hours LH Leonardo Helicopter MMH Maintenance Man Hours N.A. Not Applicable P/N Part Number
3) ANNEX N.A.
J. PUBLICATIONS AFFECTED N.A.
S.B. N°139-661 ALERT DATE: February 4, 2021 REVISION: A - February 18, 2021 Page 5 of 22 K. SOFTWARE ACCOMPLISHMENT SUMMARY N.A.
S.B. N°139-661 ALERT DATE: February 4, 2021 Page 6 of 22 REVISION: A - February 18, 2021
2. MATERIAL INFORMATION A. REQUIRED MATERIALS
1) PARTS N.A.
2) CONSUMABLES The following consumable materials, or equivalent, are necessary to accomplish this Service Bulletin:
# SPEC./LH CODE NUMBER DESCRIPTION Q.TY NOTE PART 1 AMS3255 Class II Type II AW005ME04T05305 White tape (30 mm) AR (1)(2)(3) (7)(8) I, II 2 MMM-A-132 Type 2, Class II Code No. 900000581 Adhesive EA9309.3NA (C021) AR (1) I 3 Commercial Lint-free cloth (C011) AR (1) I 4 TT-N-95 Type II Aliphatic naphtha (C059) AR (1) I 5 AN525-10R9 Screw AR (1)(4)(5) I 6 MS51958-63B Screw AR (1)(4)(6) I 7 Commercial Abrasive pad (C015) AR (1) I
3) LOGISTIC MATRIX N.A.
NOTES
(1) Item to procured as local supply.
(2) The different tape P/Ns listed below can be accepted as an alternative to the tape AW005ME04T05305:
GSC-21-99605-027;
GSC-21-98805-027;
3M 8547 Polyurethane Protective Tape;
3M 8663 Polyurethane Protective Tape;
3M 8663HS Polyurethane Protective Tape;
3M 8663DL Polyurethane Protective Tape;
3M 8560 Polyurethane Protective Tape;
Sky flex GSC-21-98330-012 GUA 4110-1.
Provided that the tapes are ordered white or in an equivalent very light color.
(3) The tapes P/N GSC ‐21‐99604‐027 and P/N AW005ME04T05505 can be considered as an alternative to the other tapes listed above provided that they are cut in the longitudinal direction to become 30 mm wide.
(4) Item to be ordered only if necessary in accordance with the required screw length.
S.B. N°139-661 ALERT DATE: February 4, 2021 REVISION: A - February 18, 2021 Page 7 of 22
(5) Instead of the screw P/N AN525-10R9, under the conditions described in the Accomplishment Instruction, it is possible to install the screw P/N AN525-10R10 or P/N AN525-10R8.
(6) Instead of the screw MS51958-63B, under the conditions described in the Accomplishment Instruction, it is possible to install the screw P/N MS51958-62B, P/N MS51958-64B, P/N MS51958-65B.
(7) Tapes 3M 8547, 3M 8663, 3M 8663HS Polyurethane Protective Tape have to be ordered 30 mm wide or, if ordered wider, longitudinally cut to reach a width of 30 mm.
(8) If tapes P/N AW005ME04T05305 or P/N AW005ME04T05505 are ordered, order quantity 3 m.
B. SPECIAL TOOLS N.A.
C. INDUSTRY SUPPORT INFORMATION N.A.
S.B. N°139-661 ALERT DATE: February 4, 2021 Page 8 of 22 REVISION: A - February 18, 2021
3. ACCOMPLISHMENT INSTRUCTIONS
GENERAL NOTES
a) Place an identification tag on all components that are re-usable, including the attaching hardware that has been removed to gain access to the modification area and adequately protect them until their later reuse.
b) Shape the cables in order to prevent interference with the structure and the other existing installations, using where necessary suitable lacing cords and plastic cable tiedown.
c) Let adhesive cure at room temperature for at least 24 hours.
d) All lengths are in mm.
PART I
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or the external power supply.
2. With reference to Figure 1 thru Figure 6, gain access to the affected area and perform the inspection of the overhead panel cable harnesses, anchor nuts, screws and supports as described in the following procedure:
2.1 In accordance with the applicable steps of AMP DM 39-A-24-91-01-00A-520A-A and with reference to Figure 1 Detail A, open the circuit breaker panel assy without removing it.
2.2 With reference to Figure 1 detail A and View B, remove the screws and the washer and check the screw length at the indicated locations from n°1 thru n°10 according to the following procedure:
2.2.1 With the help of a caliper, measure the ceiling circuit breaker panel thickness near each screw location.
NOTE Performing the following step 2.2.2, the screws have to be installed keeping the circuit breaker panel open.
2.2.2 Reinstall the screw and the washer removed in the step 2.2 in their location keeping the circuit breaker panel open.
S.B. N°139-661 ALERT DATE: February 4, 2021 REVISION: A - February 18, 2021 Page 9 of 22
2.2.3 Visually check that the number of thread pitches remained visible out of the anchor nut is between 2 and 4 after having subtracted the panel thickness value previously measured (refer to Figure 5).
2.2.4 If, when subtracted the panel thickness, less than 2 or more than 4 screw thread pitches remain visible, change the screw according to the following procedure:
NOTE The fastener length is based on the total screw length excluding the screw head.
2.2.4.1 With reference to Figure 4, Table 2, measure the screw fastener length and verify the actual screw P/N installed.
NOTE With reference to steps 2.2.4.2 thru 2.2.4.5 move up in the Table 2 row to find one grip less and move down in the Table 2 row to find one grip more.
2.2.4.2 With reference to Figure 4, Table 2, if less than 2 screw thread pitches more than the panel thickness previously measured remain visible, install one grip more than the identified screw.
2.2.4.3 With reference to Table 2, if more than 4 screw thread pitches more than the panel thickness previously measured remain visible, install one grip less than the identified screw.
2.2.4.4 Repeat steps 2.2.4.2 and 2.2.4.3 until the correct screw P/N is identified from Table 2 and the screw thread pitches visible from the anchor nut are 2, 3 or 4 more than the panel thickness previously measured.
2.2.4.5 If no screws from Table 2 satisfy the requirement of step 2.2.4.4 contact the Product Support Engineering (engineering.support.lhd@leonardocompany.com).
NOTE Some liner configurations do not require the presence of screws at the locations from n°11 thru n°16.
2.3 With reference to Figure 1 detail A and View B, check the screws length at the indicated locations from n°11 thru n°16, if applicable, according to the following procedure:
2.3.1 Visually check that the number of thread pitches remained visible out of the anchor nut is between 2 and 4 (refer to Figure 6).
S.B. N°139-661 ALERT DATE: February 4, 2021 Page 10 of 22 REVISION: A - February 18, 2021
2.3.2 If less than 2 or more than 4 screw thread pitches remain visible, change the screw according to the following procedure:
NOTE The fastener length is based on the total screw length excluding the screw head.
2.3.2.1 Remove the screw and the washer and with ref erence to Table 3, measure the screw fastener length and verify the actual screw P/N installed.
NOTE With reference to steps 2.3.2.2 thru 2.3.2.5 move up in the Table 3 row to find one grip less and move down in the Table 3 row to find one grip more.
2.3.2.2 With reference to Table 3, if less than 2 sc rew thread pitches remain visible, install one grip more than the identified screw.
2.3.2.3 With reference to Table 3, if more than 4 screw thread pitches remain visible, install one grip less than the identified screw.
2.3.2.4 Repeat the visual check and the steps 2.3.2.2 and 2.3.2.3 until the correct screw P/N is identified from Table 3 and the screw thread pitches visible from the anchor nut are 2, 3 or 4.
2.3.2.5 If no screws from Table 3 satisfy the requirement of step 2.3.2.4 contact the Product Support Engineering (engineering.support.lhd@leonardocompany.com).
2.4 With reference to Figure 1 Detail A and View B, check for chafing damage of the cable harness and ensure that clearance exists between the cable harness and the anchor nuts P/N A407A3C2P and/or the screws at the indicated locations from n°1 thru n°16.
NOTE In case of findings, perform the following step 2.5.
NOTE Customer must contact Product Support Engineering (engineering.support.lhd@leonardocompany.com) if support is needed to replace the cables or fuses and/or to have the applicable Wiring Diagrams.
2.5 With reference to Figure 1 Detail A and View B, reroute or remove and replace the damaged cables or fuses.
S.B. N°139-661 ALERT DATE: February 4, 2021 REVISION: A - February 18, 2021 Page 11 of 22 NOTE Figure 3 is for reference only.
2.6 With reference to Figure 1 View B and to Figure 3 Detail E, measure at the indicated location n°16, on the LH side, the clearance between the anchor nut P/N A407A3C2P and the cable harnesses including a check of the mutual position.
NOTE Perform the following step 2.7 if the clearance is NOT at least 10.0 mm and/or if the cable harnesses is installed BELOW the anchor nut.
2.7 In accordance with the applicable steps of AMP D M 39-A-20-10-19-00A-920A-A and with reference to Figure 1 View B, move the existing support P/N A630A51 or P/N AW001CL001-N6, as applicable, and re-route the cable harnesses in order to respect the clearance of at least 10.0 mm and guarantee the installation ABOVE the anchor nut.
2.8 With reference to Figure 1 Detail A and View B, check that all the supports P/N A630A51 and P/N AW001CL001-N6, as applicable, on the LH and RH side are soundly bonded to the panel with no evidences of detachment or delamination.
NOTE Perform the following step 2.9 in case of discrepancies found from the check of step 2.8.
2.9 With reference to Figure 1, replace the supports in the interested position according to the following procedure:
2.9.1 Cut and remove the strap from the bundle and move away the bundle from the work area as far as possible. Make sure that you do not cause damage to the wires during this operation.
NOTE Perform the following step 2.9.2 only if the support is partially removed or detached.
2.9.2 With reference to Figure 1 Detail A and View B , carefully remove the bonded plastic support P/N A630A51 and/or P/N AW001CL001-N6 with an applicable plastic spatula. Make sure that you do not cause damage to the structure during this operation.
2.9.3 Rub the seat of the plastic support on the structure with the Abrasive pad (C015) to remove the unwanted sealant.
S.B. N°139-661 ALERT DATE: February 4, 2021 Page 12 of 22 REVISION: A - February 18, 2021
CAUTION Make a selection of the solvent to use it on the different structure to prevent damage to the related surfaces.
2.9.4 Clean the seat surface with the Lint-free clot h (C011) and with Aliphatic naphtha (C059).
WARNING
BE CAREFUL WHEN YOU USE THE COMPRESSED AIR. DUST AND PARTICLES CAN CAUSE INJURY TO YOUR EYES. ALWAYS USE APPLICABLE PROTECTIVE GOGGLE.
2.9.5 Dry the seat surface with the compressed air u ntil you remove all the solvent.
2.9.6 With reference to Figure 1 Detail A and View B, install the supports P/N A630A51 and/or P/N AW001CL001-N6, as applicable, according to the following procedure:
2.9.6.1 Prepare the correct quantity of Adhesive EA9309.3NA (C021) for the plastic support and the structure surface.
2.9.6.2 If previously removed, re-install the cable harnesses to the supports P/N A630A51 and/or P/N AW001CL001-N6.
2.9.6.3 Apply a thin layer of adhesive on the structure surface where the plastic support will be installed. Make sure that adhesive is located on an area not wider than the surface of the plastic support.
2.9.6.4 Apply a thin layer of the adhesive on the mating surface of the plastic support.
2.9.6.5 Put the plastic support on the structure and push the plastic support against the structure. Make sure that the bottom of the plastic support is fully against the structure.
2.9.6.6 Let the plastic support in this position for the cure time of the adhesive.
2.9.6.7 Make sure that the adhesive makes a continuous bead around the attached plastic support.
2.9.7 Put the bundle in its correct position on the plastic support and safety the bundle with the applicable tiedown strap.