Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '411c9c78bb0f31ae3b504b8166f4f75ec2dcd4379d3b0cfe64d8eb5473656885' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '411c9c78bb0f31ae3b504b8166f4f75ec2dcd4379d3b0cfe64d8eb5473656885' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Page 1 of 14 N° 139-862 DATE: August 5, 2026 REV. : / - March 20, 2025 TITLE ATA 78 – NOZZLE EXHAUST DUCTS CLAMP ASSEMBLIES INSPECTION
REVISION LOG First Issue An appropriate entry should be made in the aircraft log book upon accomplishment.
If ownership of aircraft has changed, please, forward to new owner.
Leonardo S.p.A.
Via Giovanni Agusta, 520 21017 Cascina Costa di Samarate (VA) Italy Tel.: +39 0331 229111 - Fax: +39 0331 229605/222595 ALERT
SERVICE BULLETIN
S.B. N°139-862 ALERT DATE: August 5, 2026 Page 2 of 14 REVISION: /
1. PLANNING INFORMATION A. EFFECTIVITY All AB/AW139 helicopters from S/N 31005 to S/N 311 57 (except S/N 31007), from S/N 31201 to S/N 31398, from S/N 41001 to S/N 41023 and from S/N 41201 to S/N 41293, equipped with the clamp ass emblies P/N 3P7115A10751 or P/N BAS238-6-1300.
B. COMPLIANCE Within 25 flight hours after the issue date of this Bulletin and, thereafter every 300 flight hours.
C. CONCURRENT REQUIREMENTS N.A.
D. REASON Following an in-service event regarding the breaking of the clamp assy of the exhaust nozzle number 1 ducts, LH issued this Service Bulletin to perform a one-off inspection of the clamp assemblies P/N 3P7115A10751 or P/N BAS238 -6-1300 installed on AB/AW139 helicopters in a specific configuration (refer to paragraph 1.A Effectivity).
For monitoring purpose, also a recurrent inspection of the clamp assemblies is prescribed.
The AMPI task 78-02 inspection procedure will be updated including the instructions to perform the visual inspection of the clamp assemblies in stalled on AB/AW139 helicopter in the affected configuration.
E. DESCRIPTION This Service Bulletin prescribes the nec essary instructions to perform the detailed visual inspection of the clamp assemblies for damage and crack(s). In case of any findings, it is prescribed the replacement of the affected component(s) and the return of them to LH for investigation.
F. APPROVAL The technical content of this Service Bulletin is approved under the authority of DOA nr. EASA.21.J.005.
S.B. N°139-862 ALERT DATE: August 5, 2026 REVISION: / Page 3 of 14 For helicopters registered under Aviation Authorities other than those of EASA Member States, the applicable Aviation Authority’s approval must be verified via the Leonardo Helicopters customer portal prior to applying the Service Bulletin.
EASA states man datory compliance with inspections, modifications or technical directives and related time of compliance by means of relevant Airworthiness Directives.
If an aircraft listed in the effectivity embodies a modification or repair not L eonardo Helicopters certified and affecting the content of this Service Bulletin, it is responsibility of the Owner/Operator to obtain a formal approval by Aviation Authority having jurisdiction on the aircraft, for any adaptation necessary before incorporation of the present Service Bulletin.
G. MANPOWER To comply with this Service Bulletin , approximately two (2) MMH are deemed necessary.
MMH are based on hands -on time and can change with helicopter configuration, personnel and facilities available. MMH are not comprehensive of the overall hours necessary to get access to work areas and to remove all the equipment that interferes with the application of the prescribed instructions.
H. WEIGHT AND BALANCE N.A.
I. REFERENCES I.1 PUBLICATIONS Following Data Modules refer to AMP:
DATA MODULE DESCRIPTION PART DM01 39-A-00-20-00-00A-120A-A Helicopter safety – Preoperation (make helicopter safe for maintenance) - DM02 39-A-06-41-00-00A-010A-A Access doors and panels – General data - DM03 39-A-78-10-01-00A-520A-A Number 1 nozzle – Remove procedure - DM04 39-A-78-10-01-00A-720A-A Number 1 nozzle - Install procedure - DM05 39-A-78-10-02-00A-520A-A Number 2 nozzle - Remove procedure -
S.B. N°139-862 ALERT DATE: August 5, 2026 Page 4 of 14 REVISION: /
DATA MODULE DESCRIPTION PART DM06 39-A-78-10-02-00A-720A-A Number 2 nozzle - Install procedure - DM07 39-B-78-10-01-00A-520A-A Number 1 nozzle - Remove procedure - DM08 39-B-78-10-01-00A-720A-A Number 1 nozzle - Install procedure - DM09 39-B-78-10-02-00A-520A-A Number 2 nozzle - Remove procedure - DM10 39-B-78-10-02-00A-720A-A Number 2 nozzle - Install procedure - DM11 39-D-78-10-01-00A-520A-A Number 1/Number 2 nozzle - Remove procedure - DM12 39-D-78-10-01-00A-720A-A Number 1/Number 2 nozzle - Install procedure -
I.2 ACRONYMS & ABBREVIATIONS AMDI Aircraft Material Data Information AMP Aircraft Maintenance Publication AR As Required DM Data Module DOA Design Organization Approval EASA European Union Aviation Safety Agency IPD Illustrated Parts Data publication ITEP Illustrated Tools and Equipment Publication LH Leonardo Helicopters MMH Maintenance Man Hours MMIR Maintenance Malfunction Information Report N.A. Not Applicable P/N Part Number SB Service Bulletin S/N Serial Number WRM Warranty Reply Memo I.3 ANNEX Annex A SB 139-862 - INSPECTION REPORT FORM J. PUBLICATIONS AFFECTED AW139 Aircraft Maintenance Publication (AMP)
S.B. N°139-862 ALERT DATE: August 5, 2026 REVISION: / Page 5 of 14 K. SOFTWARE ACCOMPLISHMENT SUMMARY N.A.
S.B. N°139-862 ALERT DATE: August 5, 2026 Page 6 of 14 REVISION: /
2. MATERIAL INFORMATION A. REQUIRED MATERIALS A.1 PARTS # P/N ALTERNATIVE P/N DESCRIPTION Q.TY LVL NOTE LOG P/N 1 3P7115A10751 BAS238-6-1300 Clamp assy AR . (1) -
Refer also to IPD for the spares materials required to comply with the AMP DMs referenced in the accomplishment instructions.
A.2 CONSUMABLES Refer to AMDI for the consumable materials required to comply with the AMP DMs referenced in the accomplishment instructions.
A.3 LOGISTIC MATRIX N.A.
NOTES
(1) Item to be ordered in maximum q.ty 2 per heli copter in accordance with the accomplishment Instructions.
B. SPECIAL TOOLS The following special tools, or equivalent, are necessary to accomplish this Service Bulletin:
# P/N DESCRIPTION Q.TY NOTE PART 2 Commercial Source light 1 (B1) - 3 Commercial Magnifying glass (10x power) 1 (B1) -
Refer also to ITEP for the special tools required to comply with the AMP DM s referenced in the accomplishment instructions.
SPECIAL TOOLS NOTES Item to be procured as local supply.
C. INDUSTRY SUPPORT INFORMATION Owners/operators who comply with the instructions of this service bulletin no later than the applicable date in the “Compliance” section will be eligible to receive required materials on free of charge basis, except for consumable materials and special tools.
NOTE: Customers who fail to comply with the instructions in this service bulletin before the compliance date are not eligible for the aforementioned special policy.
S.B. N°139-862 ALERT DATE: August 5, 2026 REVISION: / Page 7 of 14 Please Issue relevant MMIR form to your Warranty Administration Dpt. including the Inspection Report Form in Annex A , completed in every par t and picture (s) of the damage(s), as required.
If the required documentation is not provided, or received not totally completed, the relevant MMIR will be automatically rejected.
NOTE: WRM will include RETURN MATERIAL AUTHORIZATION (RMA) number; the clamp assy/assemblies P/N 3P7115A10751 or P/N BAS238-6-1300 disembarked from the helicopter has to be returned to LH within fifteen (15) calendar days after the shipment of the replacement part. In case of missing return within fifteen (15) calendar days, Customer will be invoiced for the price of the replacement part.
S.B. N°139-862 ALERT DATE: August 5, 2026 Page 8 of 14 REVISION: /
3. ACCOMPLISHMENT INSTRUCTIONS
GENERAL NOTE Place an identification tag on all components that are re-usable, including the attaching hardware that has been removed to gain access to the inspection area and adequately protect them until their later reuse.
1. In accordance with AMP DM 39-A-00-20-00-00A-120A-A, prepare the helicopter on ground for a safe maintenance. Disconnect the battery, all electrical power sources and/or the external power supply.
2. In accordance with AMP DM 39-A-06-41-00-00A-010A-A and with reference to Figure 1, remove the external access panels 480AL, 474BL, 471AL and 472AR to gain access to the area affected by the inspection.
3. Gain access to the saddle support of the Number 1 nozzle.
4. In accordance with the applicable steps of AMP DM 39-A-78-10-01-00A-520A-A or DM 39-B-78-10-01-00A-520A-A or DM 39-D-78-10-01-00A-520A-A, as applicable , and with reference to Figure 1, loose n the locking hardware of the clamp assy P/N 3P7115A10751 or P/N BAS238-6-1300 to allow the component to rotate freely.
CAUTION To inspect the entire external and lateral surfaces of the clamp assy, the item shall be rotated to properly expose the entire inspection area.
CAUTION Make sure not to damage the nozzle while rotating the clamp during the inspection.
5. With reference to Figure 1, using source light and magnifying glass, perform the detailed visual inspection for damage and crack(s) of the entire external and lateral surfaces of the clamp assy.
5.1 If the clamp assy does not present any damage or cracks , perform the following procedure:
5.1.1 In accordance with the applicable steps of AMP DM 39-A-78-10-01-00A-720A-A or DM 39-B-78-10-01-00A-720A-A or DM 39-D-78-10-01-00A-720A-A, as applicable , and with reference to
S.B. N°139-862 ALERT DATE: August 5, 2026 REVISION: / Page 9 of 14 Figure 1, secure the closing hardware of the clamp assy P/N 3P7115A10751 or P/N BAS238-6-1300.
5.1.2 Proceed to step 6.
5.2 If the clamp assy presents any damage or cracks, perform the following procedure:
5.2.1 Measure the damage or crack(s) dimensions.
5.2.2 Take a picture of the affected area of the clamp assy.
5.2.3 In accordance with the applicable steps of AMP DM 39-A-78-10-01-00A-520A-A or DM 39-B-78-10-01-00A-520A-A or DM 39-D-78-10-01-00A-520A-A, as applicable, remove the affected clamp assy.
5.2.4 Send the affected part to LH.
NOTE A serviceable clamp assy is clam p assy P/N 3P7115A10751 or P/N BAS238 -6-1300 which is new or passed the inspection according to the instructions of this Service Bulletin.
5.2.5 In accordance with the applicable steps of AMP DM 39-A-78-10-01-00A-720A-A or DM 39-B-78-10-01-00A-720A-A or DM 39-D-78-10-01-00A-720A-A, as applicable, install a serviceable clamp assy P/N 3P7115A10751 or P/N BAS238-6-1300.
6. Gain access to the saddle support of the Number 2 nozzle.
7. In accordance of the applicable steps of AMP DM 39-A-78-10-02-00A-520A-A or DM 39-B-78-10-02-00A-520A-A or DM 39-D-78-10-01-00A-520A-A, as applicable , and with reference to Fi gure 1, loosen the locking hardware of the clamp assy P/N 3P7115A10751 or P/N BAS238-6-1300 to allow the component to rotate freely.
CAUTION To inspect the entire external and lateral surfaces of the clamp assy, the item shall be rotated to properly expose the entire inspection area.
CAUTION Make sure not to damage the nozzle while rotating the clamp during the inspection.
8. With reference to Figure 1, using source light and magnifying glass, perform the detailed visual inspection for damage and crack (s) of the entire external and lat eral surfaces of clamp assy.
S.B. N°139-862 ALERT DATE: August 5, 2026 Page 10 of 14 REVISION: /
8.1 If the clamp assy does not present any damage or crack s, perform the following procedure:
8.1.1 In accordance with the applicable steps of AMP DM 39-A-78-10-02-00A-720A-A or DM 39-B-78-10-02-00A-720A-A or DM 39-D-78-10-01-00A-720A-A, as applicable, secure the locking hardware of the clamp assy P/N 3P7115A10751 or P/N BAS238 -6- 1300.
8.1.2 Proceed to step 9.
8.2 If the clamp assy presents any damage or cracks, perform the following procedure:
8.2.1 Measure the damage or crack(s) dimensions.
8.2.2 Take a picture of the affected area of the clamp assy.
8.2.3 In accordance with the applicable steps of AMP DM 39-A-78-10-02-00A-520A-A or DM 39-B-78-10-02-00A-520A-A or DM 39-D-78-10-01-00A-520A-A, as applicable, remove and discard the affected clamp assy.
8.2.4 Send the affected part to LH.
NOTE A serviceab le clamp assy is clamp assy P/N 3P7115A10751 or P/N BAS238 -6-1300 which is new or pas sed the inspection according to the instructions of this Service Bulletin.
8.2.5 In accordance with the applicable steps of AMP DM 39-A-78-10-02-00A-720A-A or DM 39-B-78-10-02-00A-720A-A or DM 39-D-78-10-01-00A-720A-A, as applicable, install a serviceable clamp assy P/N 3P7115A10751 or P/N BAS238-6-1300.
9. In accordance with the inspections above (refer to steps 5 and 8), compile the Inspection Report Form in Annex A and send it, with the Subject Line "SB 139-862 - INSPECTION REPORT" to LH PSE at the following mail box:
engineering.support.lhd@leonardo.com and (for North, Central and South America) also to:
LHUSC.engineering.support@leonardocompany.us
10. In accordance with AMP DM 39-A-06-41-00-00A-010A-A, re-install all external panels previously removed.
11. Return the helicopter to flight configuration and record for compliance with this Service Bulletin on the helicopter logbook.
S.B. N°139-862 ALERT DATE: August 5, 2026 REVISION: / Page 11 of 14
12. Gain access to My Communications section on Leonardo Customer Portal and compile the “Service - Technical Bulletin Application”.
As an alternative, send the attached compliance form to the following mail box:
engineering.support.lhd@leonardo.com and (for North, Central and South America) also to:
LHUSC.engineering.support@leonardocompany.us
Non cancellare mai questo segnalibro Non cancellare mai interruzione sezione
Figure 1 S.B. N°139-862 ALERT DATE: August 5, 2026 Page 12 of 14 REVISION: /