Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '44e7ac4f0e09f6cf76b9b3b87c5ff8aa5dd95fd0c5e5ccdb77e3b4e85dd3cd4a' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '44e7ac4f0e09f6cf76b9b3b87c5ff8aa5dd95fd0c5e5ccdb77e3b4e85dd3cd4a' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN
EXPORT CONTROLLED INFORMATION WARNING - This document contains data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) as amended, or the Export Administration Act (Title 50, U.S.C., App 2401 et seq.) as amended. Violations of these export laws are subject to severe criminal and civil penalties.
© 2010 LOCKHEED MARTIN CORPORATION. LOCKHEED MARTIN PROPRIETARY INFORMATION.
November 5, 2010 382-57-90 Page 1 of 191
WINGS - REPLACEMENT OF CENTER WING, LYNDEN AIR CARGO
1. PLANNING INFORMATION A. EFFECTIVITY 382-57-90, FAA Certificated Aircraft: This Service Bulletin is applicable to the following FAA Certificated Hercules aircraft:
MODEL LOCKHEED MARTIN SERIAL NUMBER KIT 382G-31C 4590 & 4606 A, E, I, & J 382G-35C 4676 & 4698 B, F, I, & J 382G-38C 4763 C, G, I, & J 382G-69C 5025 D, H, I, & J
B. REASON
(1) This is a record purpose Service Bulletin and is not complete within itself. The purpose of this Service Bulletin is to identify the retrofit change, tabulate all affected systems or equipment, index all necessary drawings and instructions, and list all parts necessary for accomplishment of the modification.
(2) The purpose of this action is to replace the center wing box currently installed on the affected aircraft with a wing box of new manufacture.
(3) This action may be done at customer convenience at the next appropriate maintenance period.
C. DESCRIPTION This Service Bulletin provides instructions for replacing the center wing structure on affected aircraft.
D. APPROVAL
(1) The aircraft owner/operator will make an appropriate entry in the aircraft log records upon compliance with this Service Bulletin.
(2) After the work has been completed on each affected aircraft, please complete and mail or fax (770-494-5682) a Notice of Service Bulletin Compliance; or notify Lockheed Martin Aeronautics Company of compliance with this Service Bulletin at website address:
http://www.lockheedmartin.com/ams and log into Data Library.
(3) 382-57-90, FAA Certificated Aircraft: This Service Bulletin has been approved by the FAA as complying with applicable Federal Aviation Regulations.
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN 382-57-90 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. November 5, 2010 Page 2 E. MANPOWER The work prescribed in this Service Bulletin has not been performed at the Lockheed Martin facility.
Therefore, the manpower estimates provided have not been validated, and should not be construed as being acceptable for use in making fixed price quotes for accomplishment of the work. These estimates are provided only as a convenience for customer planning purposes. It is estimated that approximately 4,800 manhours (a crew of 11 men) will be required to accomplish the work described herein on each affected aircraft. This will take approximately two months elapsed time while the aircraft is out of service.
NOTE: This Service Bulletin is based upon the configuration of the aircraft as it was delivered from Lockheed Martin Aeronautics Company. Previous service bulletins issued by Lockheed Martin Aeronautics Company have been considered in the preparation of this Service Bulletin, but no consideration has been given to peculiar changes made to the aircraft by the owner/operator or the US Government since its delivery.
F. MATERIAL - COST AND AVAILABILITY
(1) Kit parts listed in Paragraph 3, required for each affected aircraft, are available from Lockheed Martin Aeronautics Company as Kits A, B, C, D, E, F, G, H, I, and J (Part No.
3362900-1/-3/-5/-7/-9/-11/-13/-15/-17/-19) for Hercules Service Bulletin No. 382-57-90 in accordance with CECP-07-00082. Parts bearing Lockheed Martin Aeronautics Company part numbers are considered proprietary and shall be purchased from Lockheed Martin Aeronautics Company unless methods of fabrication are shown in this publication. Inquiries concerning current prices, applicability, and availability of kits may be directed to the following:
MAIL: Lockheed Martin Aeronautics Company Customer Supply Business Management Department Department 65-11 Zone 0577 86 South Cobb Drive Marietta, GA 30063-0577, USA TELEPHONE: (770) 494-4214 FAX: (770) 494-7657
(2) Additional bulk materials, listed but not included in the kit, will be supplied by the aircraft owner/operator.
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN November 5, 2010 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. 382-57-90 Page 3 G. TOOLING - PRICE AND AVAILABILITY The following tooling is required and will be obtained through the applicable supply source:
Quantity Part Number Nomenclature 1 C26942100 Work Stands, Interior 1 C26942100-101 Floor Mounted Wing Dock 1 C26942101 Work Stands, Exterior 1 C26942101-101 Scaffold 1 C26942102 Work Stands, Interior 1 C26942103 Cradle, Center Wing 1 C26942104 Sling 5 C26942106-101 Cradle, Fuselage Support
H. WEIGHT AND BALANCE Due to the nature of the center wing replacement, the actual weight and balance changes, resulting from the instructions herein, cannot be accurately determined. Therefore, the aircraft must be weighed in accordance with the applicable aircraft Weight & Balance Manual.
I. REFERENCES Hercules Maintenance Manual, SMP581 Lockheed Martin Aeronautics Company Drawings 398298, 3361020, 3362685, 3362900, 3362901, 3362904
J. OTHER PUBLICATIONS AFFECTED Hercules Corrosion Prevention and Control Manual Hercules Illustrated Parts Catalog Hercules Structural Repair Manual Hercules Wiring Diagram Manual
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN 382-57-90 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. November 5, 2010 Page 4 THIS PAGE INTENTIONALLY LEFT BLANK.
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN November 5, 2010 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. 382-57-90 Page 5
2. ACCOMPLISHMENT INSTRUCTIONS This is a record type service bulletin and, therefore, does not contain detailed instructions for making the replacement. This Bulletin identifies the action, designates the aircraft affected, provides applicable planning information, and identifies the parts, materials, and drawings required for installation. This modification will be accomplished in accordance with Lockheed Martin Aeronautics Company Top Kit Drawing 3362900 and Installation Procedures Drawing 3362685.
WARNING: OBSERVE ALL APPLICABLE SAFETY PRECAUTIONS WHILE ACCOMPLISHING THIS MODIFICATION. ENSURE THAT ALL ELECTRICAL AND HYDRAULIC POWER
SOURCES ARE OFF, THE BATTERY AND EXTERNAL ELECTRICAL POWER
DISCONNECTED, AND HYDRAULIC SYSTEMS DEPRESSURIZED BEFORE STARTING THE WORK. FAILURE TO COMPLY MAY RESULT IN SERIOUS INJURY OR DEATH.
NOTE: The instructions here are for reference only and in case of any discrepancy between these instructions and Installation Procedures drawings, the actual drawings shall take precedence.
A. Prepare aircraft for modification by removing outer wings, main landing gear outer doors, No. 2 and No. 3 nacelle clamshell doors, and power plant assemblies in accordance with Drawing 3362685.
B. Align and level aircraft with center wing tooling in accordance with Drawing 398298 and 3362685.
C. Salvage flap drive components, nacelle components, leading edges, controls mounted to front beam, fillet fairings, bleed air ducting, and plumbing lines in accordance with kit drawings.
D. Remove center wing section in accordance with Drawing 3362685.
E. Perform non-destructive inspection in accordance with Drawing 3362685.
F. Install components removed from center wing assembly for shipping using Drawings 3361020, 3362901 and 3362904 for 3361022-1 Center Wing Assembly.
G. Install new center wing in accordance with Drawing 3362685. Optical alignment is required. Main landing gear main frame interface with the center wing will have an In-Process Inspection (IPI) during tooling setup and final installation. Fuselage attach angle interface with the center wing and sidewall will have a final installation inspection.
H. Reinstall salvage components in accordance with kit drawings.
I. Perform operational checks (if specified equipment is installed) in accordance with applicable Hercules Maintenance Manual (or equivalent approved operator procedures) and the following table:
Required Procedure SMP 581 Chapter/ Section Operational Checkout of Cabin Pressurization Control System 21A-30 Operational Checkout of Air Conditioning System (Airplanes Prior to 4653) 21-50 Operational Checkout of Air Conditioning System (Airplanes 4653 and Up) 21A-50 Operational Checkout Temperature Control Box 21-50
Operational Checkout of AP-105V Autopilot (Airplanes 4653 thru 4739) 22-11
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN 382-57-90 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. November 5, 2010 Page 6 Required Procedure SMP 581 Chapter/ Section Operational Checkout of FCS-105 Flight Control System (Airplanes 4740 thru 4874) 22-12
Operational Checkout of AC Generation System 24-20
Operational Checkout of Wing Liferaft Release System 25-61
Operational Checkout of Fire Detection System 26-10 Operational Checkout of Nacelle Overheat Warning System 26-10 Operational Checkout of Turbine Overheat Warning System 26-10 Operational Checkout of Fire Extinguishing System 26-20 Operational Checkout of Engine/APU/GTC Fire Extinguishing System Leakage Test 26-20
Operational Checkout of Aileron Control System 27-10 Complete Rig of Aileron Control System 27-10 Operational Checkout of Aileron Trim System 27-11 Operational Checkout of Aileron Trim Indicator 27-11 Rigging Aileron Trim System 27-11 Operational Checkout of Rudder Control System 27-20 Complete Rig of Rudder Control System 27-20 Operational Checkout of Rudder Trim System 27-21 Operational Checkout of Rudder Trim Indicator 27-21 Rigging Rudder Trim System 27-21 Operational Checkout of Elevator Control System 27-30 Complete Rig of Elevator Control System 27-30 Operational Checkout of Elevator Trim Indicator 27-31 Rigging Elevator Trim System 27-31 Operational Checkout of Flap Control System Normal Operation 27-50 Operational Checkout of Flap Control System Manual Operation 27-50 Complete Rig of Flap Control System 27-50 Operational Checkout of Flap Asymmetry System 27-50
Operational Checkout of Fuel Vent System 28-14 Operational Checkout of Refueling/Defueling System 28-21 Operational Checkout of Off Load Valve 28-21 Operational Checkout of Tank To Tank Transfer 28-21 Operational Checkout of Auxiliary, External, and Main Tank Fuel Level Control Valves 28-21 Operational Checkout of Fuel Feed System 28-22 Operational Checkout of Crossfeed Manifold Priming System 28-22 Operational Checkout of GFI 28-22 Operational Checkout of Pressure Relief Valve 28-30 Operational Checkout of Fuel Dump System 28-30 Operational Checkout of Fuel Quantity Indicating System 28-41 Operational Checkout of Fuel Pressure Indicating and Warning System 28-42
Operational Checkout of Utility Hydraulic System 29-11 Operational Checkout of Booster Hydraulic System 29-12 Operational Checkout of Auxiliary Hydraulic System 29-20
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN November 5, 2010 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. 382-57-90 Page 7 Required Procedure SMP 581 Chapter/ Section Operational Checkout of Airfoil Leading Edge Anti-Icing System 30-10 Operational Checkout of Air Intake Anti-Icing System 30-20 Operational Checkout of Propeller Anti-Icing System 30-60 Operational Checkout of Solid-State Ice Detection System 30-80 Operational Checkout of Mechanical Ice Detection System 30-80
Operational Checkout of Landing Gear System 32-00 Operational Checkout of MLG Emergency Extension and Retraction System 32-32 Operational Checkout of Landing Gear Control Circuit 32-33 Operational Checkout of Nose Landing Gear 32-20 Operational Checkout MLG Brake System 32-41 Operational Checkout of MLG Parking Brake 32-41 Anti-Skid System Operational Checkout Without Hytrol Field Tester 32-42 Anti-Skid System Operational Checkout Using Hytrol Field Tester 32-42
Cargo Area Dome Lights Operational Checkout 33-30 Ramp Lights Operational Checkout 33-30 Operational Checkout of Navigation Lights 33-40 Landing Lights Operational Checkout 33-40 Leading Edge Lights Operational Checkout 33-40 Taxi Lights Operational Checkout 33-40 Anti-Collision Lights Operational Checkout 33-40
Pitot Static System Operational Check 34-13
Operational Checkout of Gaseous Oxygen System 35-10
Operational Checkout of Pneumatic System (Airplanes prior to 4653) 36-10 Operational Checkout of Pneumatic System (Airplanes 4653 and up) 36A-10
Operational Checkout of GTC 49-10 Operational Checkout of ATM 49A-10 Operational Checkout of APU 49B-10
Operational Checkout of Cargo Ramp and Aft Cargo Door 52-30 Rigging of Wing Liferaft Release System 52-41 Operational Checkout of Door Warning System 52-70
Engine and Propeller Runup Checklist 71-00 Operational Checkout of Powerplant 71-00 Operational Checkout of Temperature Datum Control System for 501-D22A Engines 71-00
Operational Checkout of Throttle Control System 76-10 Operational Checkout of Engine Condition Control System 76-10
Operational Checkout of Turbine Inlet Temperature Indicator Using 6798233 or 6799215 Test Set 77-20
Operational Checkout of Oil Cooler Flap 79-20
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN 382-57-90 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. November 5, 2010 Page 8 Required Procedure SMP 581 Chapter/ Section Operational Checkout of Oil Quantity Indicating System 79-30
Operational Checkout of Starter Control Valve 80-10 J. Perform functional check flight of modified aircraft.
K. Restore aircraft to service.
NOTE: If assistance is needed, contact your local Lockheed Martin Aeronautics Company Representative, or the Technical Support Center in Marietta, Georgia, USA, as follows:
TELEPHONE: (770) 494-9131
FAX: (770) 494-9122
E-MAIL: hercules.support@lmco.com
MAIL: Lockheed Martin Aeronautics Company 86 South Cobb Drive Dept. 3E1M, Zone 0591 Marietta, GA 30063, USA.
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN November 5, 2010 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. 382-57-90 Page 9
3. MATERIAL INFORMATION A. The following parts are provided as Kits A, B, C, and D under ECP 07-00082. Refer to Paragraph 1.A for specific aircraft effectivity:
NOTE: A number in parenthesis following a part number in the parts list is either a superseded part number, or a specification number.
NOTE: Drawings and diagrams have been listed with the most recent revision. However, superseding revisions may be packed in the Kit.
NEW PART NUMBER
QUANTITY
KEY WORD
OLD PART NUMBER
INSTRUCTIONS/ DISPOSITION Kit A Kit B Kit C Kit D 3362900-1 Ref - - - Top Kit - Center Wing Replacement, Lynden Air Cargo (382G-31C) Note 1 3362900-3 - Ref - - Top Kit - Center Wing Replacement, Lynden Air Cargo (382G-35C) Note 1 3362900-5 - - Ref - Top Kit - Center Wing Replacement, Lynden Air Cargo (382G-38C) Note 1 3362900-7 - - - Ref Top Kit - Center Wing Replacement, Lynden Air Cargo (382G-69C) Note 1 3362900 Rev. B, PS B1 1 1 1 1 Top Kit - Center Wing Replacement, Lynden Air Cargo Drawing Note 1 DS2264 Rev. J 1 1 1 1 Design Standard - Installation, Panel Fastener, Quarter Turn, No. 7 Size Note 1 DS2269 Rev. N 1 1 1 1 Design Standard - Installation, Coupling, Flexible, Beaded Type Note 1 DS30011 Rev. N 1 1 1 1 Design Standard - Safety Practices Note 1 DS5028 Rev. C 1 1 1 1 Design Standard - Installation - Coupling Half, Flexible Note 1 STP52-723 Rev. F (DS5075 Rev. P) 1 1 1 1 Design Standard - Blind Rivet, Self Plugging and Lock Stem Note 1 DS5250 Rev. A 1 1 1 1 Design Standard - Coupling, V-Band (LJ-11) Installation of Note 1
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN 382-57-90 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. November 5, 2010 Page 10
NEW PART NUMBER
QUANTITY
KEY WORD
OLD PART NUMBER
INSTRUCTIONS/ DISPOSITION Kit A Kit B Kit C Kit D G112M Rev. G12 1 1 1 1 Process Bulletin - Electrical Bonding Note 1 G14 Rev. G30 1 1 1 1 Process Bulletin - Aircraft Finishes, Coding Scheme Note 1 G190 Rev. G11 1 1 1 1 Process Bulletin - Procedures for Application of Plastic Films Note 1 G230 Rev. G40 1 1 1 1 Process Bulletin - Acid Sealing and Environmental Sealing Note 1 G231 Rev. G24 1 1 1 1 Process Bulletin - Sealing of Pressurized Cabins for C-130 Series Airplanes Note 1 G507 Rev. NC & Amendment 3 1 1 1 1 Process Bulletin - Installation of Kidde Heat and Fire Detector System Note 1 G552 Rev. G17 1 1 1 1 Process Bulletin - Aerodynamic Smoothing and Fairing of Aircraft Note 1 G556 Rev. G14 1 1 1 1 Process Bulletin - Sealing of Center Wing and Fuel Cell Cavities of C-130/382 Series Aircraft Note 1 G599 Rev. G3 1 1 1 1 Process Bulletin - Installation of Thermal Insulating Tape Note 1 G684 Rev. G11 1 1 1 1 Process Bulletin - Wet Installation of Fasteners Note 1 STP51-302 Rev. AB 1 1 1 1 Process Specification - Forming Fabricate Practices for Sheet Metal, Extrusions, Forgings and Billet Note 1 STP51-400 Rev E 1 1 1 1 Process Specification - Standard Machining Practices, Tolerances and Allowances Note 1 STP52-704 Rev. D 1 1 1 1 Process Specification - Sleeves, Straight Shank Fastener, Installation of Note 1 STP52-706 Rev AB 1 1 1 1 Process Specification - Straight Shank Interference Fit Fasteners, Installation of Note 1
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN November 5, 2010 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. 382-57-90 Page 11
NEW PART NUMBER
QUANTITY
KEY WORD
OLD PART NUMBER
INSTRUCTIONS/ DISPOSITION Kit A Kit B Kit C Kit D STP52-723 Rev. F 1 1 1 1 Process Specification - Blind Rivet, Self-Plugging and Lock System Note 1 STP52-724 Rev. F 1 1 1 1 Process Specification - Installation of Lockbolts Note 1 STP52-726 Rev. H 1 1 1 1 Process Specification - Installation of Straight Shank (Hi-Lok) Fastener System Note 1 STP53-900 Rev. D 1 1 1 1 Process Specification - Eddy Current Inspection, Requirements For Note 1 STP56-105 Rev. P 1 1 1 1 Process Specification - Wet Installation of Fasteners Note 1 STP59-516 Rev. B 1 1 1 1 Process Specification - Application and Removal of Temporary Protective Coatings Note 1 STP60-505 Rev. T 1 1 1 1 Standard Process Specification
- Nonstructural Adhesive - Application of Note 1 STP63-001 Rev. T 1 1 1 1 Process Specification - Marking Parts & Assemblies for Identification & Inspection Note 1 0471 Rev. G39 1 1 1 1 Process Specification - Finish Specification for C-130 Series Airplanes Note 1 0581 Rev. G28 1 1 1 1 Process Specification - Fasteners, Mechanical, Preparation for and Installation of Note 1 0583 Rev. G6 1 1 1 1 Process Specification - Safetying Practices (Superseded by DS30011) Note 1 0941 Rev. G23 1 1 1 1 Process Specification - Fabrication and Installation of Plumbing Lines, Connectors, and Fittings Note 1 1461 Rev. G20 1 1 1 1 Process Specification - Electric and Electronic Wiring for Model C-130 Aircraft Note 1
HERCULES Lockheed Martin Aeronautics Company Marietta, Georgia 30063
SERVICE BULLETIN 382-57-90 USE, COPYING, AND/OR DISCLOSURE IS GOVERNED BY THE RESTRICTIVE LEGEND ON THE TITLE PAGE OF THIS DOCUMENT. November 5, 2010 Page 12
NEW PART NUMBER
QUANTITY
KEY WORD
OLD PART NUMBER
INSTRUCTIONS/ DISPOSITION Kit A Kit B Kit C Kit D 3305107 Rev. G 1 1 1 1 Fitting Installation - Center Fuselage Aft, BL 61.625 Fus Sta 617.0 Drawing Note 1 3305110 Rev. A 1 1 1 1 Fitting Installation - Ctr Fus Fwd, BL61.625, Fus Sta 477.00 Drawing Note 1 3308316 Rev. AA 1 1 1 1 Plumbing Installation - Inboard Wing Tank Drawing Note 1 3309069 Rev. A 1 1 1 1 Plumbing Installation - Bleed Air Pressure Regulation Drawing Note 1 3311007 Rev. P 1 1 1 1 Plumbing Installation - Fuselage Complete, 382C (Baseline) Drawing Note 1 3311014 Rev. V 1 1 1 1 Panel Installation - Wheel Well, MLG Drawing Note 1 3311015 Rev. AD 1 1 1 1 Panel - Wheel Well, MLG, Assy of (Regulated) Drawing Note 1 3311029 Rev. Y 1 1 1 1 Hydraulic Installation - Main Wheel Well, LH Side Drawing Note 1 3311030 Rev. T, PS T1 1 1 1 1 Hydraulic Installation - Main Wheel Well, RH Side Drawing Note 1 3311038 Rev. J 1 1 1 1 Mudguard Installation - Fwd, RH MLG Wheel Well Drawing Note 1 3311058 Rev. AH, PS 136 & 137 1 1 1 1 Air Conditioning Equipment Installation - Cargo Compartment Drawing Note 1 3311059 Rev. D 1 1 1 1 Duct Installation - Air Distribution System, Cargo Compartment Drawing Note 1 3311060 Rev. D 1 1 1 1 Fan Installation - Recirculation Cargo Compartment Drawing Note 1 3311069 Rev. K 1 1 1 1 Duct Installation - Upper Cargo Compartment Air Cond & Floor Heat, Bleed Air Drawing Note 1 3313305 Rev. A 1 1 1 1 Cover Plate Installation - Wing Isolation Control Mechanism Location Drawing Note 1