TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a73cc7c67343609f6130fc3f4f9a8d4fbf87ba7bf541304fe0bd6e6ec450f64f' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a73cc7c67343609f6130fc3f4f9a8d4fbf87ba7bf541304fe0bd6e6ec450f64f' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Issued: July 27, 2012 CC7-53-006 Page 1 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
FUSELAGE Inspection and/or Replacement of the Left Hand and Right Hand Forward and Aft Wingto-Body Attach Fittings.
1. PLANNING INFORMATION A. Effectivity:
All SA227-CC/-DC Airplanes.
B. Reason:
To provide operators with instructions for the inspection and /or replacement of the left hand and right hand forward and aft wing-to-body attach fittings.
C. Description:
Inspect the left hand and right hand forward and aft wing-to-body attach fittings for cracks. If cracks are found, replace fitting(s).
D. Compliance:
Highly Recommended For aircraft with more than 35,000 Total Aircraft Cycles (TAC), inspect within next 300 cycles from the date of this service bulletin.
For aircraft with 20,000 - 35,000 Total Aircraft Cycles (TAC), inspect within next 500 cycles from the date of this service bulletin.
For aircraft with 14,200 - 19,999 Total Aircraft Cycles (TAC), inspect within next 1,000 cycles from the date of this service bulletin.
For aircraft with less than 14,200 Total Aircraft Cycles (TAC), inspect at 14,200 cycles or within the next 1,000 cycles, whichever occurs later.
TABLE 1 SA227-CC/-DC, ALL Bolts Replaced With Same Size 14,200 CyclesOriginal Fitting Bolts Replaced With Oversize Replacement Fitting 16,600 Cycles 10,900 Cycles 13,100 Cycles Aircraft Cycles Until Recurrent Inspection
Issued: July 27, 2012 CC7-53-006 Page 2 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY E. Approval:
FAA Approved for Engineering Design.
F. Manpower:
The M7 Aerospace manhour estimate for this service bulletin is as follows:
(1) 6 manhours for access to both spars (one side only).
(2) 20 manhours for inspection (either method) for both spars (one side only).
(3) 100 manhours per pair for replacement of fittings at one spar location only.
This estimate is for direct labor only, accomplished by an experienced crew. Adjust the estimate with operator task-hour data if necessary.
G. Material – Cost and Availability:
(1) Cost:
Because of pricing fluctuations, individual cost estimates should be obtained from your normal material procurement outlet.
Additional material cost information may be contained in the Index or the Letter of Transmittal.
(2) Availability:
Parts are available.
H. Tooling – Price and Availability:
For tools/kits identified in Supplement A of this service bulletin, contact Mr. Wayne Pickford at Perimeter Aviation, ph 204-791-9848, fax 204-480-4025.
I. Weight and Balance:
Negligible NOTE: It is recommended the aircraft operating weight be reestablished after incorporating 20 service bulletins classified as having 'negligible' impact on aircraft weight and balance. This recommendation is derived from data provided in FAA Advisory Circular 120-27.
J. References:
SA227 Commuter Category Structural Repair Manual.
SA227 Commuter Category Maintenance Manual.
NOTE: References are for manufacturer’s use only.
Issued: July 27, 2012 CC7-53-006 Page 3 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY K. Other Publications Affected:
SA227 Commuter Category Maintenance Manual.
SA227 Commuter Category Airframe Airworthiness Limitations Manual, ST-UN-M003.
SA227 Commuter Category Supplemental Inspection Document (SID).
2. ACCOMPLISHMENT INSTRUCTIONS The four (4) fastener locations fastening the Main (Fwd) spar wing-to-fuselage fittings to the spar must be inspected for cracks. Two inspection methods are permissible. A method has been developed to ultrasonically inspect the fittings without removing the fasteners, provided that there is adequate clearance between fastener head and wall of fitting for the tranducer head.
Alternately, the fasteners can be removed and the open bore holes inspected using High Frequency Eddy Current (HFEC). The latter method requires additional labor hours and aircraft access.
Access requirements are detailed in step 2.A. Inspection methods are detailed in steps 2.B. and
2.C.
A. Access
(1) Remove electrical power from aircraft. Turn off main batteries. Ensure GPU is not connected to aircraft. Tag out circuit breakers and battery switches to prevent injury to personnel or damage to the aircraft.
(2) Remove interior furnishings, cabin seats, carpet, floorboards, and side panels as required to gain access to wing carry-thru area from inside the fuselage.
(3) Gain access to wing-to-fuselage mount fittings, P/N 27-22121 and 27-22123 at main spar, P/N 27-22135 and 27-22136 at aft spar.
(4) At the main spar, remove sealant around the heads of the four fasteners in the base of the fittings (attached to upper spar cap) as necessary to allow inspection per steps 2.B., 2.C., and 2.D. (See Figure 1)
(5) At the main and aft spars, remove sealant obscuring the upper outboard fillet radii as necessary to allow inspection per 2.B., 2.C., and 2.D. (See Figure 1) If the fastener bore eddy current inspection method is used (see step 2.B.), continue with steps (6) through (14). Otherwise go to step 2.C.
(6) Defuel aircraft and sump fuel in accordance with SA227 Commuter Category Maintenance Manual 12-30-30.
(7) Lift and shore aircraft per SA227 Commuter Category Maintenance Manual 07-10-
00. Use fuselage and wing cradles.
Issued: July 27, 2012 CC7-53-006 Page 4 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
(8) Remove wing belly skins and wing-to-fuselage fairings from WS 27 RH to WS 27 LH fore and aft of the main spar. Note size and type of fasteners for reinstallation.
(9) Remove accessories, plumbing, and equipment as required for access to the main spar pressure plate outboard (approx. BL 22) access panels.
(10) Remove front and aft side main pressure plate access panels.
(11) Remove forward collector tank access panel in WS 27 rib web and upper collector tank baffle.
(12) Remove under wing access panel, forward of spar and immediately outboard of WS 27.
(13) Remove air conditioning duct valve, anti-ice valve, and water separator inside under-wing access panel. Bag and tag ends of tubes and parts for reinstallation.
(14) Remove inboard and outboard tension bolts through spar cap from main spar forward and aft fitting halves (see Figure 1). The fasteners will be replaced with new hardware.
NOTE: Fastener heads may be ground off to facilitate removal. Take care not to damage fitting. Remove other fasteners as necessary to avoid damage.
For repair of damaged holes, see step 3. of this bulletin.
B. Main spar fitting fastener bore eddy current inspection At the main spar LH and RH wing-to-fuselage fittings (see Figure 2 for probable crack locations):
(1) High Frequency Eddy Current (HFEC) inspect the inside diameter of the open bolt holes in the wing-to-fuselage fittings per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-07.
(2) Proceed to step 2.D.
C. Main spar fitting endpad ultrasonic inspection At the main spar LH and RH wing-to-fuselage fittings:
(1) Using the method detailed in Supplement A to this service bulletin for aircraft listed in Table 3, inspect the endpad fitting surface around the heads of the four tension bolt fasteners. See Figure 2 for probable crack locations. If unable to use this method as outlined in Supplement A, step 7 Note, then method per step 2.B. shall be used.
D . Main spar fitting radii inspection At the main spar LH & RH wing-to-fuselage fittings:
Issued: July 27, 2012 CC7-53-006 Page 5 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
(1) High Frequency Eddy Current (HFEC) inspect per SA227 Commuter Category Structural Repair Manual 51-30-07 the upper edge of the inboard gusset on both fitting halves. See Figure 2 for probable crack locations.
(2) High Frequency Eddy Current (HFEC) inspect per SA227 Commuter Category Structural Repair Manual 51-30-07 in the fillet radii of the upper outboard corner on both fitting halves. See Figure 2 for probable crack locations.
NOTE: There is one further inspection required if the main spar fittings are removed and replaced. See steps G.(1)(l).
E. Aft spar fitting inspection
(1) At the aft spar LH and RH wing-to-fuselage fittings inspect for cracks in the fillet radii of the upper outboard corner on both fitting halves using High Frequency Eddy Current methods in accordance with SA227 Commuter Category Structural Repair Manual (SRM) 51-30-07.
F. Disposition
(1) If a crack is found in any one of the fitting halves, remove and replace both fitting halves. See step G. for removal instructions.
(2) If hardware was removed at the main spar fitting and no crack indications were found, wet install new hardware per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-03.
Inboard Bolts MS20005-25 Bolt, MS20002C5 Washer, 52LH4367-054 Nut, 4367-05 Washer Outboard Bolts MS20005-23 Bolt, MS20002C5 Washer, 52LH4367-054 Nut, 4367-05 Washer
(3) Torque bolts to 190 - 220 in-lbs in accordance with SA227 Commuter Category Structural Repair Manual (SRM) 51-40-07 using a cross sequence tightening schedule (e.g., 12 o'clock to 6 o'clock, 3 o'clock to 9 o'clock, 12:05 o'clock to 6:05 o'clock, etc.).
Issued: July 27, 2012 CC7-53-006 Page 6 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
(4) Reseal the area where sealant was removed earlier and overcoat nuts in fuel tank per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-03.
G. Removal and Replacement Remove and replace both fitting halves at any location where cracks are found.
(1) Main Spar Fittings If bolts have already been removed from fitting for bolt hole inspection, skip to step G.(1)(j).
(a) Defuel aircraft and sump fuel in accordance with SA227 Commuter Category Maintenance Manual 12-30-30.
(b) Lift and shore aircraft in accordance with SA227 Commuter Category Maintenance Manual 07-10-00.
(c) Remove wing belly skins and wing-to-fuselage fairings fore and aft of the main spar. Note size and type of fasteners for reinstallation.
(d) Remove accessories, plumbing, and equipment as required for access to the main spar pressure plate outboard (approx. BL 22) access panels.
(e) Remove front and aft side main pressure plate access panels.
(f) Remove forward collector tank access panel in WS 27 rib web and upper collector tank baffle.
(g) Remove under wing access panel, forward of spar and immediately outboard of WS 27.
(h) Remove air conditioning duct valve, anti-ice valve, and water separator inside under-wing access panel. Bag and tag ends of tubes and parts for reinstallation.
(i) Remove fitting hardware through spar cap. (Refer to step 2.(A)(14)).
(j) Remove fitting hardware through fuselage frame webs.
(k) Remove 27-22118 Mount Assembly. Permissible to trim 27-22025 Doubler on inner frame cap in accordance with Figure 5 if necessary to remove Mount Assy.
Retain shims between frame and fittings noting orientation and location for later installation.
(l) High frequency Eddy Current (HFEC) inspect the inside diameter of the open bolt holes (4) in the titanium upper spar cap per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-07. Contact M7 Engineering if a crack is found.
(m) Build a tooling fixture to capture locations of holes in spar cap.
Issued: July 27, 2012 CC7-53-006 Page 7 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
(n) Duplicate holes from fixture to new fitting halves. Hole size 0.312/0.316" diameter.
Deburr.
(o) Assemble the 27-22121 and 27-22123 fitting halves to form the 27-22118 Mount Assembly (Figure 3).
(p) Install mount assembly in accordance with the following installation notes:
1 Permissable to remove 0.060" material locally from underside of `base of mount assy to match irregularities of mating spar caps. Fittings must maintain minimum base thickness of 0.290". Alodine and prime any reworked surfaces and bare edges per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-02. Ensure that more than one-half of forward and aft edge of mount assy is in contact with spar caps. Max allowable remaining gap is 0.020".
Fill remaining gaps with Devcon-F per step 2.G.(1)(p)2.
2 Apply Devcon-F (putty type) between mating surfaces of mount assy and spar to fill any existing gaps less than 0.020" after mount assy is made to contact spar cap along more than half of both fwd and aft edges. Prior to application of Devcon-F, clean and treat mating surfaces with Devcon release agent.
3 Replace bolts and wet install per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-03 through spar cap:
Inboard Bolts MS20005-25 Bolt, MS20002C5 Washer, 52LH4367-054 Nut, 4367-05 Washer Outboard Bolts MS20005-23 Bolt, MS20002C5 Washer, 52LH4367-054 Nut, 4367-05 Washer 4 Torque MS20005 bolts through spar cap to 190 - 220 in-lbs in accordance with SA227 Commuter Category Structural Repair Manual (SRM) 51-40-07 using a cross sequence tightening schedule (e.g., 12 o'clock to 6 o'clock, 3 o'clock to 9 o'clock, 12:05 o'clock to 6:05 o'clock, etc.). Overcoat all nuts in fuel tank with sealant per SA227 Commuter Category Structural Repair Manual (SRM) 51-
30-03.
Issued: July 27, 2012 CC7-53-006 Page 8 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
(q) Pick up existing fastener holes through frame webs. Hole size 0.190/0.194" diameter. Reinstall any shims between frame web and fittings that were existing in same location/orientation as previous. Shims shall be fay surface sealed per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-03. Contact M7 Aerospace if new shims are required (see Note 4, Figures 3 and 4).
(r) Pick up existing fastener holes through 27-31264 Support Clips. Maintain fastener type and size.
(2) Aft Spar Fittings
(a) Defuel aircraft and sump fuel in accordance with SA227 Commuter Category Maintenance Manual 12-30-30.
(b) Lift and shore aircraft in accordance with SA227 Commuter Category Maintenance Manual 07-10-00. Use fuselage and wing cradles.
(c) Remove wing belly skins and wing-to-fuselage fairings fore and aft of the aft spar.
Note size and type of fasteners for reinstallation.
(d) Remove accessories, plumbing, and equipment as required for access to the aft spar pressure plate outboard (approx. BL 22) access panels.
(e) Remove front and aft side aft spar pressure plate access panels.
(f) Remove aft collector tank access panel in WS 27 rib web and upper collector tank baffle.
(g) Remove 27-71003 or 27-19097 Tube Assy (aileron control system).
(h) Remove flap walking beam.
(i) Remove flap.
(j) Remove or secure inboard flap hinge linkage parts to allow clear access to nut side of aft, outboard fitting bolt.
(k) Remove fitting hardware through spar cap. (Refer to step 2.(A)(14) NOTE, apply to aft spar).
(l) Remove fitting hardware through fuselage frame webs.
(m) Remove 27-22119 Mount Assy. Permissible to trim 27-22025 Doubler on inner frame cap in accordance with Figure 5 if necessary to remove Mount Assy. Retain shims between frame and fittings noting orientation and location for later installation.
(n) Build a tooling fixture to capture locations of holes in spar cap.
Issued: July 27, 2012 CC7-53-006 Page 9 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
(o) Duplicate holes from fixture to new fitting halves. Hole size 0.250/0.254" diameter.
Deburr.
(p) Assemble the 27-22135 and 27-22136 fitting halves to form the 27-22119 Mount Assembly (Figure 4).
(q) Install mount assembly in accordance with the following installation notes:
1 Permissable to remove 0.060" material locally from underside of base of mount assy to match irregularities of mating spar caps. Fittings must maintain minimum base thickness of 0.290". Alodine and prime any reworked surfaces and bare edges per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-02.. Ensure that more than one-half of forward and aft edge of mount assy is in contact with spar caps. Max allowable remaining gap is 0.020".
Fill remaining gaps with Devcon-F per step 2.G.(2)(q)2.
2 Apply Devcon-F (putty type) between mating surfaces of mount assy and spar to fill any existing gaps less than 0.020" after mount assy is made to contact spar cap along more than half of both fwd and aft edges. Prior to application of Devcon-F, clean and treat mating surfaces with Devcon release agent.
3 Replace 4 bolts and wet install per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-03 through spar cap:
MS20004-22 Bolt, Aft, Outbd & Inbd MS20004-24 Bolt, Fwd, Outbd MS20004-26 Bolt, Fwd, Inbd MS20002C4 Washer, 52LH4367-048 Nut, RM2935-04 Washer 4 Torque MS20004 bolts through spar cap to 100 - 140 in-lbs in accordance with SA227 Commuter Category Structural Repair Manual (SRM) 51-40-07 using a cross sequence tightening schedule (e.g., 12 o'clock to 6 o'clock, 3 o'clock to 9 o'clock, 12:05 o'clock to 6:05 o'clock, etc.). Overcoat all nuts in fuel tank with sealant per SA227 Commuter Category Structural Repair Manual (SRM) 51-
30-03.
(r) Pick up existing fastener holes through frame webs. Hole size 0.190/0.194" diameter.
(s) Pick up existing fastener holes through 27-30000-087/-088 Bracket on fwd side.
Maintain fastener type and size.
H. Close Up
(1) Reinstall any fasteners through the spar web or WS 27 rib web that were removed
Issued: July 27, 2012 CC7-53-006 Page 10 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY to facilitate removal of fitting tension bolts through spar cap. Reinstall same type and size in accordance with SA227 Commuter Category Structural Repair Manual (SRM) 51-40-07.
(2) Ensure area is fillet sealed and overcoat fasteners in wet fuel tank per SA227 Commuter Category Structural Repair Manual (SRM) 51-30-03.
(3) Restore collector tank, reseal fasteners, and close collector tank access panel.
(4) Reinstall spar access panels and center section equipment and systems per applicable sections of the SA227 Commuter Category Maintenance Manual.
(5) Reinstall air conditioning duct valve, anti-ice valve, and water separator and reinstall under-wing access panel.
(6) Remove shoring.
(7) Refuel aircraft and check for leaks.
(8) Reinstall wing-to-fuselage fairing and interior parts and components per applicable sections of the SA227 Commuter Category Maintenance Manual.
(9) If aft spar fittings were replaced, continue through step H.(12). Otherwise proceed to step 2.I.
(10) Reinstall flap and flap walking beam.
(11) Reinstall 27-71003 or 27-19097 Tube Assy (aileron control system).
(12) Remove tags from battery switches and circuit breakers pulled in step 2.A.(1).
Connect GPU to aircraft.
(13) Perform aileron control system operational checks in accordance with SA227 Commuter Category Maintenance Manual 27-10-10.
(14) Perform flap control system operational checks in accordance with SA227 Commuter Category Maintenance Manual 27-50-10.
I. Complete maintenance entry per 14 CFR 43.9.
J. Complete and return Service Bulletin Compliance Form to M7 Aerospace Technical Publications.
K. Reporting requirements Damage reporting is required to ensure compliance times are validated. If a crack is found at any location, the following information needs to be relayed to M7 Engineering as soon as possible.
Issued: July 27, 2012 CC7-53-006 Page 11 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY
(1) State length of crack and a general description of the damage.
(2) State aircraft model, serial number, aircraft total flight cycles and total flight hours.
(3) Using Figure 2, indicate location of damage, show forward orientation using arrows, and orientation of crack.
(4) State whether the aircraft has had or is suspected of having a hard landing in the past.
(5) Send this information to M7 Technical Support at MetroTech@M7Aerospace.com or (210)-824-9421, ext. 7294.
3. REPAIR OF DAMAGED FASTENER HOLES Damaged fastener holes in the base of the fitting and spar cap (fasteners attaching the fitting to the spar cap) may be repaired within the following parameters.
A. Holes may be enlarged for the first oversize, second oversize, or the next full size fastener. (See Table 2) B. Torque settings for fastener installation. Refer to SA227 Commuter Category Structural Repair Manual (SRM) 51-40-07 for guidance. Torque fasteners using a cross sequence tightening schedule (e.g., 12 o'clock to 6 o'clock, 3 o'clock to 9 o'clock, 12:05 o'clock to 6:05 o'clock, etc.).
(1) 1/4 in. nut 100 - 140 in-lbs.
(2) 5/16 in. nut 190 - 220 in-lbs.
(3) 3/8 in. nut 220 - 360 in-lbs.
C. Washers under heads of fasteners may be trimmed or chamfered to avoid interference with fitting fillet radii. Maintain a full bearing surface for the head of the fastener.
D. If a 3/8 in. diameter fastener is used in any main spar inboard location, then all four fasteners at this fitting location must be increased to 3/8 in. diameter.
Issued: July 27, 2012 CC7-53-006 Page 12 of 19
SERVICE BULLETIN SA227 SERIES
COMMUTER CATEGORY TABLE 2 Oversize Hardware for Hole Repair Main Spar Inbd Main Spar Outbd Aft Spar, Aft Fitting 1st Oversize
(0.0156)
0.332/0.328 Dia. Hole NAS6205-25X Bolt * NAS1149F0563P Washer 52LH4367-054 Nut 4367-05 Washer * If this fastener is too close to the fitting gusset to permit proper installation, a radius block of sufficient thickness to lift the head above the gusset may be employed. Create radius block from 2024-T3 per AMS-QQ-A-250/4. Size to be no less than washer diameter. Max thickness = 0.30 inches. Machine radius to match fitting fillet radius. Finish in accordance with SA227 Commuter Category Structural Repair Manual (SRM) 51-30-02. Adjust fastener length accordingly.
0.332/0.328 Dia. Hole NAS6205-23X Bolt * NAS1149F0563P Washer 52LH4367-054 Nut 4367-05 Washer
0.266/0.270 Dia. Hole NAS6204-22X Bolt NAS1149F0463P Washer 52LH4367-048 Nut RM2935-04 Washer
0.348/0.344 Dia. Hole NAS6205-25Y Bolt * NAS1149F0663P Washer 52LH4367-054 Nut 4367-05 Washer
0.348/0.344 Dia. Hole NAS6205-23Y Bolt * NAS1149F0663P Washer 52LH4367-054 Nut 4367-05 Washer
0.285/0.281 Dia. Hole NAS6204-22Y Bolt NAS1149F0563P Washer 52LH4367-048 Nut RM2935-04 Washer 2nd Oversize
(0.0312)
0.379/0.375 Dia. Hole MS20006-25 Bolt MS20002C6 Washer 52LH4367-064 Nut 4367-06 Washer See 3.D. below Next Size
0.379/0.375 Dia. Hole MS20006-25 Bolt MS20002C6 Washer 52LH4367-064 Nut 4367-06 Washer
0.316/0.312 Dia. Hole MS20005-22 Bolt MS20002C5 Washer 52LH4367-054 Nut RM2935-05 Washer Aft Spar, Fwd Fitting
0.266/0.270 Dia. Hole NAS6204-24X Bolt (Outbd) NAS6204-26X Bolt (Inbd) NAS1149F0463P Washer 52LH4367-048 Nut RM2935-04 Washer
0.285/0.281 Dia. Hole NAS6204-24Y Bolt (Outbd) NAS6204-26Y Bolt (Inbd) NAS1149F0563P Washer 52LH4367-048 Nut RM2935-04 Washer
0.316/0.312 Dia. Hole MS20005-24 Bolt (Outbd) MS20005-26 Bolt (Inbd) MS20002C5 Washer 52LH4367-054 Nut RM2935-05 Washer