On this page
Text · 14Partly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers. © Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2020-0009, the docket of AD 2020-15-12. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '36bebfde837af9baf4f2620e9bd22f78b323d6bbb877519772c8dfd5807015e8' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '36bebfde837af9baf4f2620e9bd22f78b323d6bbb877519772c8dfd5807015e8' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
This document transmits Revision 1 to Service Bulletin TRENT1000-72-AK313 Document History Service Bulletin Revision Status Supplement Revision Status Initial Issue May 2/19 Bulletin Revision 1 Remove Incorporate Reason for change All pages of the Service Bulletin Pages 1 to 12 of the Service Bulletin Updated to amend inspection conditions and requirements.
Printed in Great Britain Aug.22/19 TRENT 1000 SERIES PROPULSION SYSTEM NON-MODIFICATION SERVICE BULLETIN ALERT TRENT 1000 72−AK313 Transmittal - Page 1 of 2 Date ALERT
CHECK THAT ALL PREVIOUS TRANSMITTALS HAVE BEEN INCORPORATED If any have not been received please advise Customer Data Services, Rolls-Royce plc, Derby, England ©Rolls-Royce plc (date as above) Printed in Great Britain
LIST OF EFFECTIVE PAGES The effective pages to this Service Bulletin following incorporation of Revision 1 are as follows:
Page Revision Number Revision Date Bulletin R 1 1 Aug.22/19 R 2 1 Aug.22/19 R 3 1 Aug.22/19 R 4 1 Aug.22/19 R 5 1 Aug.22/19 R 6 1 Aug.22/19 R 7 1 Aug.22/19 R 8 1 Aug.22/19 R 9 1 Aug.22/19 R 10 1 Aug.22/19 R 11 1 Aug.22/19 R 12 1 Aug.22/19 Printed in Great Britain TRENT 1000 72−AK313 Transmittal - Page 2
1. Planning Information A. Effectivity Boeing 787 TRENT1000-A2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-AE2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-C2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-CE2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-D2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-E2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-G2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-H2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-J2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-K2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 TRENT1000-L2 All Engines not incorporating Rolls-Royce Service Bulletin 72-J941 B. Reason Problem It has been identified that some Intermediate Pressure Compressor (IPC) stage 1 rotor blades (KH25729), IPC stage 2 rotor blades (KH25730) and IPC shaft stage 2 dovetail posts (part of the IPC shaft stage 1-8 rotor assembly (FW89043)) are cracking in-service on the Trent 1000 Pack C engines. These cracks could propagate and have the potential to lead to in-flight events.
ENGINE - IP COMPRESSOR STAGE 1 BLADES, STAGE 2 BLADES AND IPC SHAFT STAGE 2
DOVETAIL POSTS - INSPECTION INTERVAL DEFINITION - NON-MODIFICATION SERVICE BULLETIN
- NON - MOD.72-AK313 Printed in Great Britain TRENT 1000 72−AK313 Page 1 of 12 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
C. Description This Non-Modification Service Bulletin (NMSB) defines the initial inspection threshold and repeat inspection intervals for Trent 1000 IPC stage 1 blade root (Front Face), stage 2 blade root (Front and Rear Face) and IPC shaft stage 2 dovetail posts (Front Face). At the given initial threshold and repeat intervals (if previously found uncracked) this NMSB instructs the accomplishment of NMSB 72-AJ814 (or NMSB 72-J744 in-shop) on IPC stage 1 blade roots, 72-AJ819 on IPC stage 2 blade roots (Front Face) and IPC shaft stage 2 dovetail posts (Front Face) and NMSB 72-AK092 on IPC stage 2 blade roots (Rear Face).
R R R R R R R R R Revision 1 of this NMSB is issued to amend 'Part D - Operational Events Requiring Action' to change the conditions and the applicable inspection requirements.
R R R This NMSB will supersede NMSB 72-AK060 on Dec.15/19.
D. Compliance This Non-Modification Service Bulletin is anticipated to be the subject of an EASA Airworthiness Directive and an FAA Airworthiness Directive.
General:
ETOPS refers to engines installed on twin-engine aeroplanes that operate on routes which, at some point, are more than 60 minutes flying time away from the nearest airport suitable for emergency landings.
All applicable Engines/IPC modules must comply with this NMSB (72-AK313) by no later than Dec.15/19.
Engines/IPC modules which are inspected in compliance to this NMSB (72-AK313), before Dec.15/19, must remain compliant and shall not revert to the inspection regime defined in NMSB 72-AK060.
There is no concurrency required between Parts A, B and C inspections.
(1) Part A - IPC Stage 1 Blade
(a) ON-WING ALERT Perform IPC stage 1 blade root (Front Face) inspection in accordance with the Accomplishment Instructions in Section 3.A.1 of this NMSB in accordance with the initial inspection threshold and repeat inspection interval as shown in Table 1.
Printed in Great Britain TRENT 1000 72−AK313 Page 2 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
Engines/IPC modules previously inspected in accordance with NMSB 72-AJ814 or 72-J744 can be considered to meet the requirements of the initial inspection of this NMSB (72-AK313 Part A).
Repeat inspections and intervals are to be counted and applied from the last inspection performed in accordance with NMSB 72-AJ814 or 72-J744 (if passed).
(b) IN-SHOP
OPTIONAL Approved Maintenance Repair and Overhaul (MRO) facilities may embody this inspection on behalf of the operator during a shop visit when called out in the workscope. Inspection procedures in-shop shall be carried out in accordance with the procedures detailed in the In-Shop Accomplishment Instructions in Section 3.A.2 of this NMSB.
If the engine/IPC module is above the initial inspection threshold and is subject to ongoing repeat inspections and NMSB 72-J871 was not embodied during the shop visit, any applicable repeat inspection requirements for IPC stage 1 blades as defined in Table 1 of this NMSB must be recorded in the carry forward sheet.
If an inspection was completed In-Shop, it is the responsibility of the MRO facility to report the inspection results in accordance with the instructions using the feedback form (or similar) in the applicable NMSB.
(2) Part B - IPC Stage 2 Blade (Front Face) and IPC Shaft Stage 2 Dovetail Posts
(a) ON-WING ALERT Perform IPC stage 2 blade root (Front Face) and IPC shaft stage 2 dovetail post (Front Face) inspection in accordance with the Accomplishment Instructions in Section 3.B.1 of this NMSB in accordance with the initial inspection threshold and repeat inspection interval as shown in Table 2.
Engines/IPC modules previously inspected in accordance with NMSB 72-AJ819 can be considered to meet the requirements of the initial inspection of this NMSB (72-AK313 Part B).
Repeat inspections and intervals are to be counted and applied from the last inspection performed in accordance with NMSB 72-AJ819 (if passed).
Printed in Great Britain TRENT 1000 72−AK313 Page 3 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
(b) IN-SHOP
OPTIONAL Approved Maintenance Repair and Overhaul (MRO) facilities may embody this inspection on behalf of the operator during a shop visit when called out in the workscope. Inspection procedures in-shop shall be carried out in accordance with the procedures detailed in the In-Shop Accomplishment Instructions in Section 3.B.2 of this NMSB.
If the engine/IPC module is above the initial inspection threshold and subject to ongoing repeat inspections and NMSB 72-J871 was not embodied during the shop visit, any applicable repeat inspection requirements for IPC stage 2 blades as defined in Table 2 of this NMSB must be recorded in the carry forward sheet.
If an inspection was completed In-Shop, it is the responsibility of the MRO facility to report the inspection results in accordance with the instructions using the feedback form (or similar) in the applicable NMSB.
(3) Part C - IPC Stage 2 Blades (Rear Face)
(a) ON-WING ALERT Perform IPC stage 2 blade root (Rear Face) inspection in accordance with the Accomplishment Instructions 3.C.1 of this NMSB in accordance with the initial inspection threshold and repeat inspection interval as shown in Table 2 Engines/IPC modules previously inspected in accordance with NMSB 72-AK092 can be considered to meet the requirements of the initial inspection of this NMSB (72-AK313 Part C).
Repeat inspections and intervals are to be counted and applied from the last inspection performed in accordance with NMSB 72-AK092 (if passed).
For engines that were previously subject to NON-ETOPS operation under NMSB 72-AK060 (No Rear Face inspection) - prior to any operation under this NMSB (72-AK313), compliance to this section (Part C) is required.
(b) IN-SHOP
OPTIONAL Printed in Great Britain TRENT 1000 72−AK313 Page 4 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
Approved Maintenance Repair and Overhaul (MRO) facilities may embody this inspection on behalf of the operator during a shop visit when called out in the workscope. Inspection procedures in-shop shall be carried out in accordance with the procedures detailed in the in-shop Accomplishment Instructions in Section 3.C.2 of this NMSB.
If the engine/IPC module is above the initial inspection threshold and subject to ongoing repeat inspections and NMSB 72-J871 was not embodied during the shop visit, any applicable repeat inspection requirements for IPC stage 2 blades (Rear Face) as defined in Table 2 of this NMSB must be recorded in the carry forward sheet.
If an inspection was completed in-shop, it is the responsibility of the MRO facility to report the inspection results in accordance with the instructions using the feedback form (or similar) in the applicable NMSB.
(4) Part D - Operational Events Requiring Action
(a) ON-WING ALERT Condition 1R Following execution of any engine non-normal checklist procedure that results R R in an asymmetric power condition at an altitude of less than 28,000R feet (IFSD, single engine take-off, engine fault). Perform the inspections in accordance with Section 3.A, 3.B, 3.C and 3.D of this NMSB R R on the non-affected engine (no power reduction, no IFSD) InstalledR on the aircraft, in no more than 5 engine flight cycles.
Condition 2R Following a cabin depressurisation event, perform inspections in accordance with accomplishment instructions in Section 3.A, 3.B, 3.C and 3.D of this NMSB on both engines installed on the aircraft, in no more than 5 engine flight cycles.
R R R R If this inspection is performed and the engine is not rejected and is not subject to a repeat inspection interval already, then this inspection is to be considered the initial inspection and repeat inspections shall continue in accordance with Tables 1 and 2.
R R R R If this inspection is performed and the engine is not rejected and was subject to a repeat inspection interval already, then this inspection meets that requirement and subsequent repeat inspections shall continue in accordance with Table 1 and 2.
R R R R Printed in Great Britain TRENT 1000 72−AK313 Page 5 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
(b) IN-SHOP Not applicable E. Approval The technical content of this Non-Modification Service Bulletin was approved under the authority of Design Organisation Approval EASA.21J.065 on May.01/19 and was reapproved on Aug.22/19.
R R F. Manpower
(1) Time to gain access Refer to 72-J744, 72-AJ814, 72-AJ819 and 72-AK092.
(2) Time to inspect Refer to 72-J744, 72-AJ814, 72-AJ819 and 72-AK092.
(3) Time to restore to serviceable condition Refer to 72-J744, 72-AJ814, 72-AJ819 and 72-AK092.
G. Material Price and Availability Refer to 72-J744, 72-AJ814, 72-AJ819 and 72-AK092.
H. Tooling Price and Availability Refer to 72-J744, 72-AJ814, 72-AJ819 and 72-AK092.
I. References
(1) Rolls-Royce Service Bulletin:
72-J941 Engine - IP Compressor blades - Introduction of revised IP Compressor stage 1 and 2 rotor blades featuring optimised manufacturing and geometry changes with associated changes to build and machining instructions
(2) Rolls-Royce Non-Modification Service Bulletins:
(a) 72-AJ814 Engine - Ultrasonic Inspection of Trent 1000 Intermediate Pressure Compressor Rotor 1 Blades Built Up Engine - Non-Modification Service Bulletin Printed in Great Britain TRENT 1000 72−AK313 Page 6 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
(b) 72-AJ819 Engine - Visual Borescope Inspection of Trent 1000 Intermediate Pressure Compressor Rotor 2 Blades and Intermediate Pressure Compressor Shaft Stage 2 Dovetail Posts - Non-Modification Service Bulletin
(c) 72-J871 Engine Component - Replacement of the IP Compressor Rotor Stage 1 Blades and/or Stage 2 Blades and/or IPC Rotor - Non-Modification Service Bulletin
(d) 72-J744 Engine - Ultrasonic Inspection of Trent 1000 Intermediate Pressure Compressor Rotor 1 Blades with the Front Bearing Housing Removed - Non-Modification Service Bulletin
(e) 72-AK092 Engine - IP Compressor Stage 2 Rotor Blade Dovetail Root (Rear) - Ultrasonic Inspection - Non-Modification Service Bulletin
(f) 72-AK060 Engine - IP Compressor Stage 1 Blades, Stage 2 Blades and IPC Shaft Stage 2 Dovetail Posts - Inspection Interval Definition - Non-Modification Service Bulletin
(g) 72-AK290 Engine - IP Compressor Rotor 2 Blades - Inspection of the Dovetail Root Front and Rear Face - Non-Modification Service Bulletin Printed in Great Britain TRENT 1000 72−AK313 Page 7 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
2. Material Information Refer to 72-J744, 72-AJ814, 72-AJ819 and 72-AK092.
Printed in Great Britain TRENT 1000 72−AK313 Page 8 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
3. Accomplishment Instructions A. Part A - IPC Stage 1 Blades
(1) On-Wing
(a) Perform NMSB 72-AJ814. Refer to NMSB 72-AJ814, 3.Accomplishment Instructions - On-wing.
(b) Accomplishment of NMSB 72-AK313 Part A shall be recorded in accordance with local SB Tracking Procedures.
(2) In-shop
(a) If instructed in the engine workscope, perform NMSB 72-AJ814, refer to NMSB 72-AJ814 Accomplishment Instructions - In-shop.
(b) NMSB 72-J744 is considered an in-shop equivalent to NMSB 72-AJ814 and where NMSB 72-J744 has been used to inspect rotor 1 blades, compliance to NMSB 72-AK313 Part A may be claimed.
(c) Accomplishment of NMSB 72-AK313 Part A shall be recorded in the engine logbook and module logcard.
B. Part B - IPC Stage 2 Blades (Front Face) and IPC Shaft Stage 2 Dovetail Posts
(1) On-wing
(a) Perform NMSB 72-AJ819. Refer to NMSB 72-AJ819, 3. Accomplishment Instructions - On-wing.
(b) Accomplishment of NMSB 72-AK313 Part B shall be recorded in accordance with local SB tracking system procedures.
(2) In-Shop
(a) If instructed in the engine workscope, perform NMSB 72-AJ819, refer to NMSB 72-AJ819 Accomplishment instructions - In-Shop.
(b) Accomplishment of NMSB 72-AK313 Part B shall be recorded in the engine logbook and module logcard.
C. Part C - IPC Stage 2 Blades (Rear Face)
(1) On-wing
(a) Perform NMSB 72-AK092. Refer to NMSB 72-AK092, 3. Accomplishment Instructions - On-Wing.
(b) Accomplishment of NMSB 72-AK313 Part C shall be recorded in accordance with local SB tracking system procedure.
Printed in Great Britain TRENT 1000 72−AK313 Page 9 May 2/19 Aug.22/19R TRENT 1000 SERIES
SERVICE BULLETIN
(2) In-shop
(a) If instructed in the engine workscope, perform NMSB 72-AK092, refer to NMSB 72-AK092 Accomplishment instructions - In-Shop.
(b) Accomplishment of NMSB 72-AK313 Part C shall be recorded in the engine logbook and module logcard.
D. Part D - Operational Events Requiring Action
(1) Comply with Sections 3.A, 3.B and 3.C.
(2) Accomplishment of NMSB 72-AK313 Part A, Part B, Part C and Part D shall be recorded in the engine logbook and module logcard.
Printed in Great Britain TRENT 1000 72−AK313 Page 10 May 2/19 Aug.22/19R TRENT 1000 SERIES