© Rolls-Royce plc. Filed by the FAA in regulations.gov docket FAA-2020-0293; AD 2020-20-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'fd948a4a98114bd37d787b8264b465bb06ed0db9260162a5ef55ad1d1efff0c9'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

This document transmits the Initial Issue of Service Bulletin TRENT1000-72-AK451 Bulletin Initial Issue Remove Incorporate Reason for change Pages 1 to 21 of the Service Bulletin Initial Issue Page 1 and 2 of Appendix 1 Initial Issue Page 1 of Appendix 2 Initial Issue Printed in Great Britain Nov.14/19 TRENT 1000 SERIES PROPULSION SYSTEMS NON-MODIFICATION SERVICE BULLETIN ALERT TRENT 1000 72íAK451 Transmittal - Page 1 of 2 Date ALERT

CHECK THAT ALL PREVIOUS TRANSMITTALS HAVE BEEN INCORPORATED If any have not been received please advise Customer Data Services, Rolls-Royce plc, Derby, England ©Rolls-Royce plc (date as above) Printed in Great Britain

LIST OF EFFECTIVE PAGES The effective pages to this Service Bulletin are as follows:

Page Revision Number Revision Date Bulletin 1 Nov.14/19 2 Nov.14/19 3 Nov.14/19 4 Nov.14/19 5 Nov.14/19 6 Nov.14/19 7 Nov.14/19 8 Nov.14/19 9 Nov.14/19 10 Nov.14/19 11 Nov.14/19 12 Nov.14/19 13 Nov.14/19 14 Nov.14/19 15 Nov.14/19 16 Nov.14/19 17 Nov.14/19 18 Nov.14/19 19 Nov.14/19 20 Nov.14/19 21 Nov.14/19 Appendix 1 1 Nov.14/19 2 Nov.14/19 Appendix 2 1 Nov.14/19 Printed in Great Britain TRENT 1000 72íAK451 Transmittal - Page 2

1. Planning Information A. Effectivity

(1) BOEING 787 TRENT 1000-AE3 Engines TRENT 1000-CE3 Engines TRENT 1000-D3 Engines TRENT 1000-G3 Engines TRENT 1000-H3 Engines TRENT 1000-J3 Engines TRENT 1000-K3 Engines TRENT 1000-L3 Engines TRENT 1000-M3 Engines TRENT 1000-N3 Engines TRENT 1000-P3 Engines TRENT 1000-Q3 Engines TRENT 1000-R3 Engines

(2) AIRBUS A330 TRENT 7000-72 Engines TRENT 7000-72C Engines B. Reason

(1) Problem Cracking of the front air seal on IP Compressor (IPC) shaft assembly (72-32-31, 01-450, Part Number KH18436) has been identified during strip of a flight test vehicle. Subsequent inspections have identified two further examples of cracked front air seal on in-service engines. These cracks could propagate and have the potential to lead to in-flight events.

ENGINE - IP COMPRESSOR (IPC) SHAFT - BORESCOPE INSPECTION OF THE FRONT AIR SEAL - NON-MODIFICATION SERVICE BULLETIN - MOD.72-AK451 Printed in Great Britain TRENT 1000 72íAK451 Page 1 of 21 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

(2) Safety Intent The safety intent of this Non-Modification Service Bulletin (NMSB) is to identify and remove cracked components from service which, if not accomplished, could lead to high energy debris release and a potentially hazardous condition.

C. Description This NMSB instructs the procedures for the initial inspection and repeats of an in-situ borescope inspection of the IP Compressor shaft assembly (72-32-31, 01-450, Part Number KH18436) at a specific area between the fourth (rearmost) seal fin of the IP Compressor Shaft Assembly front air seal and the IP Compressor Stage 1 disc. This inspection procedure uses a standard 4mm borescope accessing the IP Compressor Stage 1 area through the Engine Section Stator (ESS) vanes. This inspection can be performed in shop and on-wing. Where intervals allow, this inspection can be performed on-wing concurrently with:

BOEING 787 aircraft: AMM Task DMC-B787-A-R72-00-00-46A-280C-A, IP Compressor Stage 1 - Front Surface of the Blade Root Dovetail and Rotor Disc Post (With a Borescope).

AIRBUS A330 aircraft: AMM TASK 72-00-00-00-290-848-A, Special Detailed Inspection of the Intermediate Pressure Compressor Stage 1 - Front Surface of the Blade Root Dovetail and Rotor Disc Post (with a Borescope).

In both cases, access can alternatively be gained using the method described in the applicable AMM Task.

Accomplishment of this NMSB should be recorded in accordance with local NMSB tracking system procedures. A copy of the completed Appendix 1 or a similar form should be used to capture results along with photographic/video recording.

D. Compliance This Non-Modification Service Bulletin is anticipated to be the subject of an EASA Airworthiness Directive.

Printed in Great Britain TRENT 1000 72íAK451 Page 2 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

(1) IN-SHOP ALERT

(a) Inspect the IP Compressor Shaft Assembly in accordance with Section

3.A Accomplishment Instructions at engine shop visit, including those engines currently in-shop at time of issue of this NMSB.

NOTE: A shop visit is defined as the time from engine removal from wing for the purpose of a visit to a Maintenance, Repair & Overhaul (MRO) facility until the time of dispatch of the engine(s) from the MRO facility to the operator. Any engine that is in such condition at the date of issue of this NMSB is considered to be In-shop.

(b) A previous accomplishment of Service Bulletin 72-K452 or Technical Variance TV207889 may be considered as an acceptable means of compliance for the inspection set by Section 1.D.(1)(a).

(2) ON-WING ALERT

(a) Inspect the IP Compressor Shaft Assembly in accordance with Section

3.B Accomplishment Instructions as per the following schedule:

(i) Initial inspection to be completed before 500 cycles (IP Compressor Shaft Assembly cycles since new) or within 100 cycles of issue date of this NMSB, whichever is later.

(ii) Repeat inspections to be completed at intervals not exceeding 200 cycles.

(b) For IP Compressor Shaft Assemblies of greater than 700 cycles (IP Compressor Shaft Assembly cycles since new) at time of issue of this NMSB, inspect the IP Compressor Shaft Assembly in accordance with Section 3.B Accomplishment Instructions as follows:

(i) Initial inspection to be completed within 50 cycles from issue of this NMSB.

(ii) Repeat inspection to be completed at intervals not exceeding 200 cycles.

(c) For IP Compressor Shaft Assemblies of greater than 1000 cycles (IP Compressor Shaft Assembly cycles since new) at time of issue of this NMSB, inspect the IP Compressor Shaft Assembly in accordance with Section 3.B Accomplishment Instructions as follows:

(i) Initial inspection to be completed within 25 cycles from issue of this NMSB or before 1st December 2019, whichever is sooner.

Printed in Great Britain TRENT 1000 72íAK451 Page 3 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

(ii) Repeat inspection to be completed at intervals not exceeding 200 cycles.

(d) A previous accomplishment of Service Bulletin 72-K452 or Technical Variance TV207889 In-shop or On-wing may be considered as an acceptable means of compliance for the initial inspection set by paragraphs (a)(i), (b)(i) or (c)(i) of Section 1.D.(2).

(e) Accomplishment of this NMSB In-shop (Section 1.D.(1)) may be considered as an acceptable means of compliance for the initial or repeat inspection set by paragraphs (a)(i)/(ii), (b)(i)/(ii) or

(c)(i)/(ii) of Section 1.D.(2).

NOTE: Accomplishment of this NMSB In-shop before 300 cycles (IP Compressor Shaft Assembly cycles since new) may be taken as an additional one-time inspection. An additional initial inspection as per Section 1.D.(2).(a) is required to initiate the repeat inspection regime.

E. Approval The technical content of this Non-Modification Service Bulletin is approved under the authority of Design Organisation Approval EASA.21J.065 on Nov.14/19.

F. Manpower

(1) In-Shop

(a) Time to gain access 30 minutes (2 persons) - Estimated

(b) Time to inspect 45 minutes (2 persons) - Estimated

(c) Time to restore to serviceable condition 30 minutes (2 persons) - Estimated

(2) On-Wing

(a) Time to gain access 30 minutes (2 persons) - Estimated

(b) Time to inspect 45 minutes (2 persons) - Estimated Printed in Great Britain TRENT 1000 72íAK451 Page 4 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

(c) Time to restore to serviceable condition 30 minutes (2 persons) - Estimated G. Material Price and Availability Not applicable.

H. Tooling Price and Availability

(1) Flexible video-capable borescope, with a forward-view 0.157in (4 mm) diameter lens (STD-7028)

(2) Immobiliser - LP Compressor (HU44525-1/SPL-8907)

(3) Inlet Protective Mat (HU55142-1/SPL-9039)

(4) Engine Fan Cover (98K1010H005-000/SPL-8837)

(5) Engine Exhaust Cover (98K1010H006-000/SPL-8836)

(6) Rotor 1 Borescope Guide Tube (RRT108139/SPL-16443) or locally sourced borescope guide tube - OPTIONAL

(7) OMat 150 (Acetone) or OMat 1/40 (Isopropyl Alcohol) - OPTIONAL

(8) OMat 582 (Ultrafine Scotch Brite) - OPTIONAL

(9) Delivery tube for OMat 150 (Acetone) or OMat 1/40 (Isopropyl Alcohol) -

OPTIONAL

(10) Adhesive tape (OMat 283 or OMat 256) - OPTIONAL I. References

(1) Aircraft Maintenance Manual (AMM):

(a) BOEING 787

(i) DMC-B787-A-R72-00-00-46A-280C-A, Intermediate Pressure Compressor Stage 1 - Front Surface of the Blade Root Dovetail and Rotor Disc Post (with a Borescope) - Special Detailed Inspection

(ii) DMC-B787-A-R72-00-00-01A-950A-A, Turn the Intermediate Pressure System - Standard Practices Printed in Great Britain TRENT 1000 72íAK451 Page 5 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

(b) AIRBUS A330

(i) AMM TASK 72-00-00-00-290-848-A, Special Detailed Inspection of the Intermediate Pressure Compressor Stage 1 - Front Surface of the Blade Root Dovetail and Rotor Disc Post (with a Borescope)

(ii) AMM TASK 72-00-00-910-801-A, Turn the Intermediate Pressure System - Standard Practices

(2) Rolls-Royce Non-Modification Service Bulletin:

(a) 72-K452

(i) ENGINE - IP COMPRESSOR (IPC) SHAFT BORESCOPE INSPECTION OF THE

FRONT AIR SEAL - NON-MODIFICATION SERVICE BULLETIN Printed in Great Britain TRENT 1000 72íAK451 Page 6 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

2. Material Information None Printed in Great Britain TRENT 1000 72íAK451 Page 7 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

3. Accomplishment Instructions A. In-Shop

(1) Use the borescope equipment to do a visual inspection of the front air seal of the IP Compressor Shaft Assembly (72-32-31, 01-450).

(a) Assemble the applicable flexible video-capable borescope.

(b) If using a borescope guide tube:

(i) Carefully put the guide tube between the LP Compressor blades, through the ESS vanes and stop just before the cavity in front of the IP Compressor Stage 1 blades. Refer to Fig.1.

It is recommended that access is gained at Top Dead Centre (TDC) to facilitate the borescope positioning into the engine.

The Variable Inlet Guide Vanes (VIGV) can prevent access from the front of the engine. If the VIGV do prevent access, manually actuate the VIGV mechanism until a clear path to the IP Compressor Stage 1 blades is seen from the front of the engine.

(ii) Attach the borescope guide tube to the engine with adhesive tape.

(iii) Carefully put the borescope through the borescope guide tube, until the borescope tip is into the cavity in front of the IP Compressor Stage 1 blades. Refer to Fig.1.

(c) If not using a borescope guide tube:

(i) Carefully put the borescope between the LP Compressor blades, through the ESS vanes and into the cavity in front of the IP Compressor Stage 1 blades. Refer to Fig.1.

It is recommended that access is gained at Top Dead Centre (TDC) to facilitate the borescope positioning into the engine.

The Variable Inlet Guide Vanes (VIGV) can prevent access from the front of the engine. If the VIGV do prevent access, manually actuate the VIGV mechanism until a clear path to the IP Compressor Stage 1 blades is seen from the front of the engine.

Printed in Great Britain TRENT 1000 72íAK451 Page 8 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

(d) Slowly turn the IP system.

CAUTION: WHEN TURNING THE IP SYSTEM, ENSURE THAT THE ROTATION OF

THE BLADES IS AWAY FROM THE BORESCOPE TIP (FOR EXAMPLE COUNTER-CLOCKWISE, AFT LOOKING FORWARDS). IF THE SYSTEM

IS TURNED TOWARDS THE BORESCOPE THEN THERE IS THE POTENTIAL FOR TIP CRASH OR JAMMING OF THE IP SYSTEM.

CAUTION: MAKE SURE THAT THE BORESCOPE TIP IS NOT IN THE PATH OF THE BLADES WHEN YOU TURN THE ENGINE. IF THE BORESCOPE

AND THE BLADES TOUCH, DAMAGE TO THE BLADES OR BORESCOPE COULD OCCUR. THE GUIDE TUBE AND BORESCOPE SHOULD NOT BE

INSERTED INTO THE ENGINE UNTIL THE ENGINE HAS COOLED TO WITHIN THE BORESCOPE MANUFACTURERS RECOMMENDATION.

(i) Use an applicable wrench to rotate the Hexagon drive on the IP Turning tool to slowly turn the IP system away from the borescope tip (for example counter-clockwise, aft looking forwards).

(e) Perform a full 360 degree visual inspection of the surface between the fourth (rearmost) seal fin of the IP Compressor Shaft Assembly front air seal (FIN 4 in Fig.2) and the IP Compressor Stage 1 disc (IPC1 ROTOR in Fig.2). Refer to Fig.2 for the expected view through the borescope.

(i) Concentrate on looking for cracks which run at 90 degrees to the seal fin (Forward to Aft of the engine). If doubt exists over the disposition of an observation, assume a crack is present.

NOTE: TO ACCOUNT FOR 360 DEGREES, EITHER USE THE IP COMPRESSOR STAGE 1 DISC DRAIN HOLES (QTY.2, LOCATED ADJACENT TO EACH

OTHER) TO START AND FINISH THE INSPECTION, OR COUNT THE PASSAGE OF 35 IP COMPRESSOR STAGE 1 BLADE ROOTS.

(ii) To assist in sentencing crack like features in the inspection area it is permissible to clean the suspected area using the processes outlined in Appendix 2. Once cleaned the inspection can be repeated starting again from Step 3.A.(1).(b).

(f) Acceptance Standards

(i) If cracking is identified on the front air seal of the IP Compressor Shaft Assembly (72-32-31, 01-450):

(1) Make a photographic/video record of the finding.

Printed in Great Britain TRENT 1000 72íAK451 Page 9 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

(2) REJECT the Engine (see NOTE below) NOTE: To assist in sentencing crack-like features in the inspection area it is permissible to clean the suspected area using the processes outlined in Appendix 2. Once cleaned the inspection can be repeated starting again from Step 3.A.(1).(b).

(ii) If no cracking is identified the Front Air seal of the IP Compressor Shaft Assembly (72-32-31, 01-450):

(1) ACCEPT the Engine

(g) After completion of the borescope inspection, carefully remove the borescope equipment and the Rotor 1 Borescope Guide Tube (if used).

(h) Record accomplishment of this Non-Modification Service Bulletin in the module log card and the engine logbook against EIPC Ref 72-32-31,

01-450.

(i) A copy of the completed Appendix 1 or a similar form should be used to capture results.

B. On-Wing WARNING: YOU MUST BE CAREFUL WHEN YOU WORK ON THE ENGINE AFTER THE ENGINE IS SHUT DOWN. THE ENGINE CAN STAY HOT FOR ALMOST ONE HOUR. DO NOT TOUCH HOT PARTS WITHOUT THE APPLICABLE GLOVES. HOT PARTS CAN CAUSE INJURIES TO PERSONNEL.

CAUTION: IN ORDER TO REDUCE THE POTENTIAL FOR MULTIPLE ENGINE IN-FLIGHT

SHUTDOWN, POWER LOSS, OR OTHER ANOMALY DUE TO MAINTENANCE ERROR,

ROLLS-ROYCE RECOMMENDS THAT OPERATORS AVOID PERFORMING

MAINTENANCE ON MULTIPLE ENGINES INSTALLED ON THE SAME AIRCRAFT AT THE SAME TIME. IF IT IS NOT POSSIBLE TO AVOID MAINTENANCE ON

MORE THAN ONE ENGINE AT THE SAME TIME, ROLLS-ROYCE RECOMMENDS

THAT ADDITIONAL CONTROLS ARE APPLIED IN ORDER TO ENSURE THAT MAINTENANCE TASKS HAVE BEEN COMPLETED AS DEFINED. MAINTENANCE

GUIDELINES SHOULD BE REVISED, WHERE POSSIBLE, TO PROMOTE THIS RECOMMENDATION.

(1) Prepare the aircraft for maintenance:

(a) For BOEING 787 aircraft:

Prepare the engine for inspection in accordance with DMC-B787-A-R72-00-00-46A-280C-A, Intermediate Pressure Compressor Stage 1 - Front Surface of the Blade Root Dovetail and Rotor Disc Post (with a Borescope) - Special Detailed Inspection.

Printed in Great Britain TRENT 1000 72íAK451 Page 10 Nov.14/19 Nov.14/19 TRENT 1000 SERIES

SERVICE BULLETIN

Pages 13–24 of 26