Copy · SB-912 i-008 R1_SB-912-070 R1_SB-914-052 R1 - ROTAX Engine Type 912i, 912 and 914 (Series) · 11 pages

© Rotax. Filed by the FAA in regulations.gov docket FAA-2017-1078; AD 2018-03-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '1bc8522180281387f8f38f70f472cdd60c9f1efc8604650fc6864fc6eac6a068'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

12. October 2017 Current valid documentation see: 72-20-00 Revision 1 www.FLYROTAX.com Page 1 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

d06499.fm SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1 This SB revises SB-912 i-008/SB-912-070/SB-914-052 Initial Issue dated 12. October 2017

SERVICE BULLETIN Inspection and/or replacement of the valve push-rod assy., rocker arm left and rocker arm right for ROTAX® Engine Type 912 i, 912 and 914 (Series) ATA System: 72-30-00 Cylinder head

MANDATORY

1) Planning information To obtain satisfactory results, procedures specified in this publication must be accomplished with accepted methods in accordance with prevailing legal regulations.

BRP-Rotax GmbH & Co KG cannot accept any responsibility for the quality of work performed in accomplishing the requirements of this publication.

1.1) Applicability Criterion A) All versions of ROTAX® engines types:

Criterion B) Spare parts:

Further all engines are affected, which have been equipped with valve push-rod assy. part no.

854861 during engine repair, maintenance or general overhaul as of June 08th, 2016.

NOTE: The valve push-rod assy. may have been removed from the initial engine and used on another one.

Engines with serial numbers higher than in criterion A have already been equipped with tested valve push-rod assy. and are therefore not affected.

For relevant information, see the maintenance records and/or the logbook.

Engine type Serial number 912 iSc Sport from S/N 4 417 438 up to S/N 4 417 441 inclusive from S/N 7 702 101 up to S/N 7 702 103 inclusive 912 A from S/N 4 411 126 up to S/N 4 411 146 inclusive from S/N 4 411 401 up to S/N 4 411 492 inclusive 912 F from S/N 4 413 066 up to S/N 4 413 067 inclusive from S/N 4 413 101 up to S/N 4 413 111 inclusice 912 S from S/N 9 563 826 up to S/N 9 563 849 inclusive from S/N 9 564 301 up to S/N 9 564 508 inclusive from S/N 9 564 510 up to S/N 9 564 534 inclusive 914 F from S/N 4 421 581 up to S/N 4 421 597 inclusive from S/N 4 421 701 up to S/N 4 421 833 inclusive

d06499.fm

12. October 2017 72-30-00 Revision 1 Page 2 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

1.2) Concurrent ASB/SB/SI and SL In addition to this Service Bulletin the following Service Instructions must be observed and complied with:

Service Instructions-SI-912-009/SI-914-010, title „Introduction of a new rocker arm bushing“, current issue.

1.3) Reason Due to deviations in the manufacturing process of the valve push-rod assy., partial wear on the rocker arm ball socket may occur. This wear might lead to a rocker arm cracking / fracture which in consequence may lead to a malfunction of the valve train. Possible effects are rough engine running or an unusual engine operating behaviour.

1.4) Subject Inspection and/or replacement of the valve push-rod assy., rocker arm left and rocker arm right for ROTAX® Engine Type 912 i, 912 and 914 (Series).

1.5) Compliance

- Before the initial installati on in an aircraft and/or the initial start-up thereafter.

- Carry out this inspection on the engines listed in section 1.1., according to the instructions in section 3 at the next ROTAX® scheduled maintenance event or within the next 25 hours of operation, but at the latest after 200 days (from the date of the initial issue of this Service Bulletin).

- At rough engine running, or unusual of engine operating behaviour carry out and inspection in accordance to this Service Bulletin before the next flight.

1.6) Approval The technical content of this document is approved under the authority of DOA ref.

EASA.21J.048.

1.7) Labor time Estimated labor hours:

Engine installed in the aircraft - - - labor time will depend on airframe installation and therefore no estimate is available from the engine manufacturer.

1.8) Mass data change of weight - - - none.

moment of inertia - - - unaffected.

1.9) Electrical load data No change

1.10) Software modifications No change

1.11) References In addition to this technical information refer to current issue of

- all relevant Service Instructions (SI)

- Maintenance Manual Heavy (MMH) NOTE: The status of the Manuals can be determined by checking the table of amendments. The 1st column of this table shows the revision status. Compare this number to that listed on the ROTAX website:

www.FL YROTAX.com. Updates and current revisions can be downloaded for free.

d06499.fm SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

12. October 2017 72-30-00 Revision 1 Page 3 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

1.12) Other Publications affected None

1.13) Interchangeability of part

- all affected parts cannot further be used and must be returned F.O.B to ROTAX ® Authorized distributors or their independent Service Centers.

- further sale, use or shipment of all valve push-rods part no. 854861produced in the affected time period (as of June 08th, 2016 until October 02nd, 2017), in stores (e.g. replacement parts) are also affected, must undergo a visual inspection of valve push-rods as per section. 3.1.2 and if found not OK must be returned F.O.B. to ROTAX® Authorized distributors or their independent Service Centers.

2) Material Information

2.1) Material- cost and availability Price and availability will be provided on request by ROTAX® Authorized Distributors or their independent Service Centers.

2.2) Company support information

- Shipping costs, downtime costs, loss of income, telephone costs etc. or costs of conversion to other engine versions or additional work, as for instance simultaneous engine overhauls are not covered in this scope and will not be borne or reimbursed by ROTAX®.

2.3) Material requirement per engine parts requirement: Order parts as required for the relevant job task to be determined in section 3.).

* or relevant part as per supersedure history

2.4) Material requirement per spare part None.

2.5) Rework of parts None.

Fig.

no. part no. Qty/engine Description Application 2 required parts for inspection 840887 4 Allen screw M6x30 10.9 valve cover 2 927941 4 Washer 6.0/12/1 valve cover 2 881920 1 Set O-Ring set valve cover 1 required parts for replacement 854861* as required Valve push-rod assy. cylinder head 2 854383 as required Rocker arm left cylinder head 2 854393 as required Rocker arm right cylinder head

d06499.fm

12. October 2017 72-30-00 Revision 1 Page 4 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

2.6) Special tooling/lubricant-/adhesives-/ sealing compound/price and availability Price and availability will be supplied on request by ROTAX® Authorized Distributors or their independent Service Centers:

* Only needed if replacement task is required.

** or equivalent e.g. valve spring mounting device assy. part no. 877385.

*** or equivalent.

Description Qty/engine Part no. Application Valve spring loading jig 1* 877387** valve spring KLÜBER ISOFLEX TOPAS NB 5051 as required 898351*** rocker arm bearing m WARNUNGNOTICE If using these special tools observe the manufacturers specifications.

d06499.fm SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

12. October 2017 72-30-00 Revision 1 Page 5 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

3) Accomplishment /Instructions -R O T A X® reserves the right to make any amendments to existing documents, which might become necessary due to this standardization, at the time of next revision or issue.

NOTE: Before maintenance, review the entire documentation to make sure you have a complete understanding of the procedure and requirements.

Accomplishment All measures must be implemented and confirmed by at least one of the following persons or organizations:

-R O T A X® - Airworthiness representatives -R O T A X® - Authorized Distributors or their independent Service Centers

- Persons approved by the respective Aviation Authority

- Persons with approved qualifications for the corresponding engine types. Only authorized persons (iRMT, Level Heavy Maintenance) are entitled to carry out this work.

NOTE: All work has to be performed in accordance with the relevant Maintenance Manual.

Safety notice NOTE: Indicates supplementary information which may be needed to fully complete or understand an instruction.

3.1) Instructions

3.1.1) Removing valve covers See Fig. 2.

m WARNUNGmWARNING Identifies an instruction which, if not followed, may cause serious injury or even fatal injury.

m WARNUNGmCAUTION Identifies an instruction which, if not followed, may cause minor or moderate injury.

m WARNUNGNOTICE Identifies an instruction which, if not followed, may severely damage the engine or could void any warranty.

ENVIRONMENTAL NOTE Environmental notes give you tips on environmental protection.

Step Procedure 1 Loosen Allen screw (1) M6x30 with washer (2) from valve cover (3), and remove it together with large and small O-rings (4) and (5).

d06499.fm

12. October 2017 72-30-00 Revision 1 Page 6 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

3.1.2) Visual inspection of valve push-rods Perform visual inspection of all push-rod ball sockets on all cylinder.

Check for color. See Fig. 1.

3.1.3) Replacement of affected parts on affected cylinder positions (only in case visual inspection is NOT passed OK) See Fig. 2 and Fig. 3.

On valve trains with valve push-rods found NOT OK the following steps need to be performed:

NOTE: On standard applications, the replacement of the push rods and rocker arms can be carried out with engine installed in aircraft.

Color Evaluation Silver surface Valve push-rod is OK. No further action required for this valve push-rod.

Black surface Valve push-rod is NOT OK.

See section. 3.1.3) Replacement of affected parts.

Step Procedure 1 Remove the spark plug connector and the four top spark plugs.

m WARNUNGNOTICE Prevent entering of foreign substance through spark plug hole.

Step Procedure 2 Turn crankshaft so that the respective piston is exactly on ignition top dead center.

NOTE: Only when you have an Criterion B) Spare parts affected engine and only if engine is equiped with collar cap nuts M8 wrench size 13: Loosen the external collar cap nut (6) for easier disassembling the rocker arm shaft.

m WARNUNGNOTICE Do not loosen the collar nuts M8. There is no reason to remove or loosing the M8 collar nuts the head stud may come loose requiring re-installation as per current Maintenance Manual. In the event that in loosening collar nuts M8, the stud becomes loose, retighten the stud to 3 Nm (26 in.lb).

Step Procedure 3 Attach the support plate (12) to the valve spring loading jig part no. 877387 (7) with 2 hex. screws (13) M6x16 at the attachment points (14) on the cylinder heads.

4 Put adapters (15) on the valve spring loading jig.

5 Attach the valve spring loading jig on cylinder head and support plate with 2 Allen screws (8) M6x70 and depress both valves with 3 turns.

m WARNUNGmWARNING When attaching the loading jig, take care to depress the valve with the valve spring simultaneously. Push the valve stem if need be, otherwise there is risk that the valve cotters will displace or may drop out.

d06499.fm SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

12. October 2017 7 2-30-00 Revision 1 Page 7 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

3.1.4) Install valve cover See Fig. 2.

Step Procedure 6 This will relieve the pressure from both hydraulic tappets. Now the rocker arm shaft

(9) may be easily pulled out. Lift out both rocker arms (10) and (11).

7 Replace only affected parts as per section 2.3) . See also Fig. 3.

8 Apply KLÜBER ISOFLEX TOPAS NB 5051 ( 16) on both push-rod ball sockets and contact areas of rocker arm and slide push-rod into the oil return tube (20).

9 Check bushing and rocker arm shaft according to latest Maintenance Manual Heavy.

10 Put oil on the rocker arm bushing.

11 Place rocker arm left (10) and rocker arm right (11) in cylinder head, apply KLÜBER ISOFLEX TOPAS NB 5051 (16) on rocker arm shaft (9) and insert it into its bearing support.

12 Loosen valve spring loading jig and support plate.

13 When removing the valve spring loading jig , make sure the adapter rings (15) do not jam on the valve spring retainer.

14 NOTE: Only when you have an Criterion B) Spare parts affected engine and only if engine is equiped with collar cap nuts M8 wrench size 13:

Mount collar cap nut (6) according to latest Maintenance Manual Heavy or SI-912-025/SI-914-026/SI-912 i-010.

15 Lubricate all moving parts in the rocker arm space with engine oil or equivalent.

Step Procedure 1 Clean the sealing surface of cylinder head and valve cover with a suitable lint-free cloth or equivalent.

2 Insert new O-ring (4) 105x2.5 and O-ring (5) 6.4x1.8 into the valve cover (3).

3 Fit valve cover.

m WARNUNGNOTICE Between the valve covers a gap of min. 0,1 mm (.004 in.) must remain.

The covers must not touch each other.

Step Procedure 4 Tighten the new Allen screw (1) M6x30 with washer (2) to 10 Nm (89 in.lb).

m WARNUNGmWARNING Carefully inspect the length of the valve cover screw. Inspect whether thread is damaged. If the screw is loose or the valve cover leaking, the oil will not return into the oil tank by ”blow-by gas” and the oil system will not properly function. Improper installation of the valve cover could lead to loss of crankcase pressure.

d06499.fm

12. October 2017 72- 30-00 Revision 1 Page 8 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

- Restore aircraft to original operating configuration.

- Connect negative terminal of aircraft battery.

3.2) Test run Conduct test run. See chapter 12-20-00 of the latest Maintenance Manual Line for the respective engine type.

3.3) Summary These instructions (section 3) have to be followed in accordance with the deadlines specified in section 1.5.

The execution of the mandatory Service Bulletin must be confirmed in the logbook.

A revision bar outside of the page margin indicates a change to text or graphic.

Translation into other languages might be performed in the course of language localization but does not lie within ROTAX® scope of responsibility.

In any case the original text in English language and the metric units are authoritative.

3.4) Inquiries Inquiries regarding this Service Bulletin should be sent to the ROTAX® Authorized Distributor of your area.

A list of all ROTAX® Authorized Distributors or their independent Service Centers is provided on www.FLYROTAX.com.

Step Procedure 5 Refit the wiring and top spark plugs (17) and tighten.

- If genuine ROTAX® spark plugs installed. Tighten the spark plugs to 16 Nm (142 in. lb.) on a cold engine.

- If still old spark plug version NGK used tighten to 20 Nm (177 in.lb) or change all spark plugs to genuine ROTAX® spark plugs according to SI-912 i-013/SI-912-027/ SI-914-028.

Install spark plug connector according to a marking sleeve.

6 Repeat the procedure on the remaining 3 cylinder heads.

7 Tighten the new Allen screw (1) M6x30 with washer (2) to 10 Nm (89 in.lb).

d06499.fm SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

12. October 2017 7 2-30-00 Revision 1 Page 9 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

4) Appendix The following drawings should convey additional information:

Fig. 1 Visual inspection comparison of spare parts:

d06499.fm

12. October 2017 72- 30-00 Revision 1 Page 10 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN Fig. 2 14 1 Allen screw M6x30 2 Washer 3 Valve cover 4 O-Ring 105x2.5 5 O-Ring 6.4x1.8 6 Collar cup nut M8 7 Valve spring loading jig 8 Allen screw M6x70 9 Rocker arm shaft 10 Rocker arm left 11 Rocker arm right 12 Support plate 13 Hex. screw M6x16 14 Attachment points 15 Adapter 16 Lubrication points 17 Spark plug Detail pos. 15 15 8 7 12 13 3 2 1 11 10 16 9 1417 5 16 16 6 4

KLUEBER ISOFLEX TOPAS NB 5051 L L L L 8

d06499.fm SB-912 i-008 R1/ SB-912-070 R1 SB-914-052 R1

SERVICE BULLETIN

12. October 2017 7 2-30-00 Revision 1 Page 11 of 11 Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.

Fig. 3 NOTE: The illustrations in this document show the typical construction. They may not represent full detail or the exact shape of the parts which have the same or similar function.

Exploded views are not technical drawings and are for reference only. For specific detail, refer to the current documents of the respective engine type.

20 rocker arm push-rod assy.

groove for oil lubrication bushing O L bore hole for oil lubrication L O

KLUEBER ISOFLEX TOPAS NB 5051 ENGINE OIl 18 Rocker arm ball joint 19 Lubrication bore 20 Oil return tube 18 19