Copy · Viking DHC-3 Otter Service Bulletin V30008 Rev NC · 20 pages

© Viking Air. Filed by the FAA in regulations.gov docket FAA-2021-0214; AD 2021-24-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '67bb5a530ae1bb5f47c83a68e2492ddf76dbd2f1c771811267d51c1f9f9139d3'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1 of 2 ATA Ref: 57-00 09-February-2017 Service Bulletin V3/0008

SERVICE BULLETIN TRANSMITTAL SHEET REPLACEMENT OF DHC-3 WING STRUT (MAIN SPAR) LUG FITTING AND FUSELAGE TIE-BAR Service Bulletin No.: V3/0008 Date of Original Issue: 09 February 2017 Revision No: Revision NC Date of Issue: 09 February 2017

This Service Bulletin defines the S ervice Life Limits for the DHC-3 wing strut fitting on the main spar and on the fuselage to wing strut attachment (tie-bar), to maintain continued airworthiness.

Page 2 of 2 ATA Ref: 57-00 09-February-2017 Service Bulletin V3/0008

THIS PAGE INTENTIONALLY LEFT BLANK

09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 1 of 18

1959 De Havilland Way Sidney, B.C. Canada V8L 5V5 Tel: (250) 656 - 7227

SERVICE BULLETIN ATA SYSTEM: 57-00 NUMBER: V3/0008 SUBJECT: Replacement of DHC-3 Wing Strut (Main Spar) Lug Fitting and Fuselage Tie-Bar I. PLANNING INFORMATION A. Effectivity Aircraft Affected: All DHC-3 aircraft.

B. Reason To maintain continued airworthiness of the DHC-3 Wing Strut Lug Fitting on the Main Spar and the Fuselage to Wing Strut Attachment component (Tie-Bar).

C. Description This Service Bulletin defines the Service Life Limits for the DHC-3 Wing Strut Fitting on the Main Spar and on the Fuselage to Wing Strut Attachment (Tie-Bar), and provides instructions for removal and replacement.

D. Compliance

1. For aircraft certified to maximum gross weight of 8000 lbs or less, operators shall incorporate the requirements of this Service Bulletin at or before the Wing or F uselage Tie- Bar accumulates 40,000 flight hours.

2. For aircraft certified to maximum gross weight greater than 8000 lbs, operators shall incorporate the requirements of this Service Bulletin at or before the Wing or Fuselage Tie -Bar accumulates 32,200 flight hours.

3. For Wings or Fuselage Tie-Bars that are on aircraft certified to maximum gross weight greater than 9000 lbs or exceed the limitations as specified in paragraph I.D.1 or I.D.2, the operator shall contact Viking Air Limited Technical Support.

NOTE 1: The compliance times specified in p aragraph I.D.1 and I. D.2 are applicable to aircraft with total accumulated flight hours at or above 2,000 feet altitude above ground level (AGL), not including take-off and landing phases.

For aircraft with all accumulated flight hours below 2,000 feet AGL over land, the total accumulated Wing hours or Fuselage Tie-Bar hours shall be doubled, to compare with the compliance time specified in paragraph I.D.1 and I.D.2. This is because aircraft with low level flights over land are indirectly subjected to accelerated fatigue damage due to gusty conditions or frequent maneuver loading, compared to a normal transportation role at normal cruising altitudes.

Seaplanes taking off and landing over water but cruising at low level over land below 2,000 feet AGL shall be subject to the above doubling of flight hours.

DHC-3 OTTER

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 2 of 18 For aircraft operating part of the time below 2000 feet AGL over land, the operator shall estimate the percentage of the time flown at low level based on the service history, and calculate the T otal Equivalent Wing Hours (TEWH) and the Total Equivalent Tie-Bar Hours (TETBH) with the following equations:

TEWH = TAWH*(1+X%) and TETBH = TATBH*(1+X%) Where:

TAWH = Total Accumulated Wing Hours TATBH = Total Accumulated Tie-Bar Hours X% = total “X” percentage of time in which aircraft was operated at low level below 2,000 feet over land (except for landing and take-off).

Example: A n aircraft operates with 25% of time below 2,000 feet over land. If the Total Accumulated Wing Hours are 30,000, the Total Equivalent Wing Hours (TEWH) would be:

TEWH = TAWH*(1+X%) = 30,000*(1+25%) = 30,000*1.25 = 37,500 hours NOTE 2: Contact Viking Technical Support if you require help to determine:

a) Total Equivalent Wing Hours (TEWH) and Total Equivalent Tie-Bar Hours (TETBH)

b) Life limits for wings and fuselage tie- bar on aircraft currently certified for maximum gross weight more than 8,000 lbs, but operated at or below 8, 000 l bs. gross weight for a long time prior to up-gross weight modification.

NOTE 3: Fuselage Tie Bar C3FS14-5 has the same life limitation as specified in paragraph I.D.1 or I.D.2 and shall be replaced at the same time as the Wing Strut Fitting on the Main Spar.

NOTE 4: If the Fuselage Tie-Bar C3FS14-5 was replaced previously ( per SB No. 3/37 or due to other reasons) and the service life is known, replacement of the Fuselage Tie-Bar may be delayed until time specified in paragraph I.D.1 or I.D.2.

NOTE 5: If the service life of the existing Fuselage Tie-Bar is unknown, replace at the same time as replacing the Wing Strut Lug Fitting on the Main Spar, per paragraph I.D.1 or I.D.2.

E. Approval The technical content of this Service Bulletin has been approved under the authority of the Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) 04-V-02.

F. Labo ur Time Estimated labour time to complete this Service Bulletin is 300 hours to replace both Wing Strut Fittings and the Fuselage Attachment Tie Bar Fitting:

• Wing Removal – 50 hours per wing

• Wing Strut Fitting Replacement – 40 hours per wing

• W ing Strut to Fuselage Attachment Tie Bar Fitting Replacement – 20 hours

• Wing Re-installation – 50 hours per wing

SERVICE BULLETIN V3/0008 S.B. V3/0008 09-February-2017 Revision ‘NC’ Page 3 of 18 G. Weight and Balance Not affected.

H. Electrical Load Data Not affected.

I. Publications Affected PSM 1-3-2 Maintenance Manual - Part-6 Service Life Limits J. Reference s PSM 1-3-2 Maintenance Manual - Part-1 General Information PSM 1-3-2 Maintenance Manual - Part-2 Airframe PSM 1-3-2 Maintenance Manual - Appendix IV PSM 1-3-3 Structural Repair Manual PSM 1-3-4 Illustrated Parts Catalogue SB No. 3/37 Wing Strut to Fuselage Attachment Tie-Bar – Inspection for Corrosion Note: This Service Bulletin is self-contained. For more information, please contact:

Viking Air Limited Technical Support 1959 De Havilland Way Sidney, British Columbia V8L 5V5 technical.support@vikingair.com FAX: 250-656-0673 Telephone Numbers:

Regional: 250-656-7227 North America: 1-800-663-8444 International: +1-800-6727-6727

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 4 of 18 II. ACCOMPLISHMENT INSTRUCTIONS CAUTION: BEFORE REMOVING EITHER WING, SUPPORT THE OPPOSITE WING TO PREVENT THE AIRCRAFT FROM OVERTURNING.

NOTE: Report any additional damage to underlying structure not replaced per this Service Bulletin.

A. Removal and Replacement Procedure - Left Hand (LH) Wing Strut Fitting

1. Remove LH Wing per Maintenance Manual PSM 1-3-2 Part 2 (Section 2.14.1).

2. Support the wing on a suitable wing cradle (ref Structural Repair Manual PSM1-3-3 Part 1 – Fi gure 1-3 Wing Support Jig) with access to the lower skin areas STN 85.0-235, or on a storage dolly with the top skin facing down. Wing structure must be kept secure and safely supported for work on lower skins and main spar.

NOTE 1: Refer to PSM 1-3-3 Part 1 Section 1.16 before beginning any disassembly work.

NOTE 2: Use Wing Support Stand C3W1-1-211 to support the Wing Structure. If an alternate stand is used, it is recommended that the cradles are connected together to prevent the wing box structure from twisting during work. Protect the cradles to prevent damage to the leading edge skins.

3. Remove Wing Tie Down Bracket C3W133-7, Bracket C3W21-3 and hardware. If parts are in serviceable condition, retain for future installation. Otherwise, replace with new parts.

R efer to Figure 5.

4. Remove LH Inspection Door Assembly C3W95-5 (C3W95-6 RH) at STA 135.00-160.00. If parts are in serviceable condition, retain for future installation. If parts are not in s erviceable condition, replace with new parts. Refer to Figure 1.

NOTE: If 9000lb Kit (TC STC SA03-50 or FAA STC SA02009NY) or other Gross-Weight Increase Kit is installed, remove lower skin doublers, as required, to gain access to Main Spar Strut fitting. If parts are in serviceable condition, retain for future installation. Otherwise, replace with new parts.

5. Partially de-rivet Lower Skins (Forward C3W82 & Aft C3W83), as shown in Figure 1, to g ain access to Main Spar Strut Fitting by pulling the skin away from the spar and ribs.

NOTE: De-rivet skins only as required to gain access to Strut Fitting, for structural integrity. Skin panels to be removed and replaced at a subsequent step after the Strut Fitting has been replaced.

6. Remove fasteners (rivets, bolts or Huckbolts), approx. STN 135.0-160.0, through Wing S trut Fittings and Main Spar Web. Refer to Figure 5.

7. Remove LH Stiffener C3W8-5 (C3W8-6 RH) from main spar at STA 147.50. If part is in serviceable condition, retain for future installation or replace with new. Refer to Figure 5 .

8. Remove Lug Fitting Components, refer to Figure 5 and Table 2.

NOTE: Retain removed parts for use as templates to transfer drill existing fastener holes from removed components into new components.

9. Do a general Standard High Frequency Bolt Hole Eddy Current inspection in all open holes in the wing structure where components have been removed for replacement. No cracks, flaws or other damage is permitted. Remove and replace any damaged components as required or repair per PSM 1-3-3 or contact Viking Technical Support for repair instructions.

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 5 of 18 NOTE 1: The general Standard Bolt Hole Eddy Current inspection is required in al l open holes on the spar web, lower caps (C3W8 -3/-2, C3W7-11/-10), stiffener (C3W8- 5/-6) and assembled skins & doublers.

NOTE 2: A detailed visual inspection in all open holes may be conducted in thin skins in lieu of Standard High Frequency Bolt Hole Eddy Current inspection.

10. Complete a detailed visual inspection with 10X magnification and strong light source on all surrounding components and wing skin surfaces for cracks, corrosion or other damage. No cracks, flaws or damage is permitted. Remove and replace any damaged components as required or repair per PSM 1-3-3 or contact Viking Technical Support for repair instructions.

11. Using retained Lug Fitting Components (removed per paragraph II.A.8) as templates, transfer drill holes into the new parts (1 size down or pre-drill diameter size), ensuring the main Lug holes are aligned between new parts and old parts. Qty-4 holes should be marked and drilled to full size in the new parts (except Packing Plate C3W8-4), minimum 6 inches apart at the same locations of each mating part. Refer to Figure 5 for suggested locations. These holes will be used to locate and orient the new parts into the existing spar assembly (web and caps).

NOTE: Packing Plate C3W8-4 width may be adjust ed as required, refer to Figure 6 (Section C-C note).

12. Locate new Lug Fitting Components (ref Table 2), Lower Spar Caps and Stiffener (C3W8- 5/6) into the wing assembly. Ensure the wing strut lug hole and the full size fastener holes are aligned. Full size fasteners or precise tooling pins (qty-4) shall be installed first into the 4-full sized holes to correctly locate and secure the strut lug fitting components. Refer to Table 1 or PSM 1-3-3 for fastener final hole sizes.

13. Install spring fasteners (or threaded Cleco’s) in every other (or every third) hole and drill all open fastener holes to full size. Refer to Table 1 or PSM 1-3-3 for fastener hole sizes. After drilling, install spring fasteners (or threaded Cleco’s) in all full size fastener holes. Then, remove remaining Spring fasteners (Cleco’s) and progressively drill the remaining fastener holes to full size.

NOTE: If holes are oversized, refer to PSM 1- 3-3 or Viking Technical Support for repair instructions.

14. Remove all new components and deburr.

15. Touch up all repair components and areas with alodine and epoxy primer as required.

16. Clean reworked area to eliminate the risk of FOD.

17. Install the following new Lug Fitting Components into Main Spar: Lower Spar Caps (C3W8-3 LH, C3W8-2 RH) & C3W7-11 LH, C3W7-10 RH), and Stiffener (C3W8-5 LH, C3W8-6 RH). Refer to Figure 5 & Table 3 for fasteners.

a. All fasteners should be installed per PSM 1-3-3. Use grip gauge to establish correct rivet length prior to installation.

b. If holes are oversized during removal or back drilling, refer to PSM 1-3-3 or Viking Technical Support for repair instructions.

c. If installing AN3 and AN4 bolts, torque per PSM 1-3-3 Appendix III.

NOTE: It is recommended to seal all mating surfaces and wet install steel fasteners with PRC P/S-870C sealant or equivalent, per manufacturer’s product instructions.

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 6 of 18 Table 1: Fastener Hole Sizes Nominal Fastener Size Final Hole Tolerance (in) Recommended Drill/Reamer (in) -4 (1/8”) Rivet 0.128-0.133 #30 -5 (5/32”) Rivet 0.159-0.166 #20 -6 (3/16”) Rivet 0.190-0.196 #10 #10 (AN3 Bolt) 0.218 – 0.229 - 1/4" (AN4 Bolt) 0.279 – 0.279 - -6 Huckbolt (Lockbolt) 0.1890 – 0.1910 0.1895 -8 Huckbolt (Lockbolt) 0.2490 – 0.2510 0.2495 -6 Hi-Lok 0.1890 – 0.1910 0.1895 -8 Hi-Lok 0.2490 – 0.2510 0.2495

18. Install C3W8-5 LH (C3W8-6 RH) Stiffener with fasteners per Figure 5.

19. I nstall Wing Tie Down Bracket, C3W133-7, Bracket C3W21-3 and hardware per Figure 5.

20. De-r ivet Lower Skins (Forward C3W82 & Aft C3W83) between STA 97.50 & 260.00, as shown in Figure 1, to gain access to install solid rivets as per the original wing assembly.

21. Re-install Lower Forward and Lower Aft Skins and C3W95-5 Inspection Door Assembly with fasteners per Figure 1 and Figure 4.

a. I f holes are oversized during removal or back drilling, refer to PSM 1-3-3 or Viking Technical Support for repair instructions.

b. If 9000lb Kit (STC SA03-50 or other) is installed, install doublers with STC defined f asteners. If holes are oversized during removal or back drilling, refer to PSM 1-3-3 or S TC holder for repair instructions.

N OTE: The following steps are recommended:

(1) seal all mating surfaces with PRC P/S-870C sealant or equivalent, per manufacturer’s product instructions,

(2) fill voids and fillet seal around edges of skins & doublers with PRC PR1776M B2 sealant or equivalent and (

3) wet install all fasteners with PRC P/S-870C sealant or equivalent.

22. Using Wing Strut Lug Drill & Reaming Tool (C3W7-1-38 LH, C3W7-2-38 RH) or locally made equivalent tool, ream the new wing strut fitting components to DIA .8755/.8754” for the Strut Fitting Bushing C3W66-3. Deburr all sharp edges and touchup with alodine. Refer to Figure 6.

23. Install C3W66-3 Strut Fitting Bushing (press or shrink fit).

NOTE: C3W66-3 is CAD plated, take care not to damage finish.

24. Completely clean and de-FOD the repair area.

25. Final touch-up with alodine and epoxy primer as required to all repair areas.

26. Optional: upon completion of the fitting replacement, apply a thin coat of Corrosion Inhibiting Compound (LPS#3, Dinitrol, AV5B-2, or equivalent) over internal surfaces of repair area.

NOTE: This may be completed prior to Step II.A.20.

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 7 of 18

27. Apply polyurethane top coat paint to repair area per original finish.

28. Install the LH Wing per Maintenance Manual PSM 1-3-2 Section 2.14.2.

NOTE: Installed single wing assembly shall be supported to prevent the aircraft from becoming unstable.

B. Removal and Replacement Procedure - Right Hand (RH) Wing Strut Fitting

1. Repeat steps 2.A.1 through 2.A.28 for the RH Wing. Refer to Table 2 for replacement components.

C. Removal and Replacement Wing Strut to Fuselage Attachment - Tie Bar NOTE: Both LH and RH Wings must be removed (or one wing is removed and the other wing is supported) for the Fuselage to Wing Strut Attachment Tie-Bar Replacement.

1. Remove and replace the Tie-Bar Fitting C3FS14-5 per Service Bulletin No. 3/37 (Replacement Section). Refer to Service Bulletin No. 3/37 for replacement components (Kit of Materials section).

NOTE 1: When installing the new Fuselage Tie-Bar, all installation hardware (bolts, nuts, washers) must be replaced with new.

NOTE 2: The following steps are recommended:

(1) fay seal all mating surfaces with PRC P/S -870C sealant or equivalent per manufacturers product instructions,

(2) fill voids and fillet seal around edges of skins & doublers with PRC PR1776M B2 sealant or equivalent and (

3) wet install all fasteners with PRC P/S-870C sealant or equivalent.

2. Completely clean and de-FOD the repair area.

3. Final touch-up with alodine and epoxy primer as required to all repair areas.

4. Optional: upon completion of the fitting replacement, apply a thin coat of Corrosion Inhibiting Compound (LPS#3, Dinitrol, AV5B-2, or equivalent) over internal surfaces of repair area.

5. Apply polyurethane top coat paint to repair area per original finish.

D. Recording On completion of this Service Bulletin, make one of the following entries as applicable in the aircraft log book:

1. “Service Bulletin No. V3/0008 - REPLACEMENT OF DHC-3 WING STRUT (MAIN SPAR) LUG FITTING & FUSELAGE TIE-BAR has been completed”, if both Wing Strut (Main Spar) Lug Fitting & Fuselage Tie-Bar are replaced. Or,

2. “Service Bulletin No. V3/0008 - REPLACEMENT OF DHC-3 WING STRUT (MAIN SPAR) LUG FITTING ONLY has been completed”, if only the Wing Strut (Main Spar) Lug Fitting is replaced. Or,

3. “Service Bulletin No. V3/0008 - REPLACEMENT OF DHC- 3 FUSELAGE TIE-BAR ONLY has been completed”, if only the Fuselage Tie-Bar is replaced.

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 8 of 18 III. MATERIAL INFORMATION AND TOOLING A. Material Information (Parts Required Per Aircraft) Table 2: Wing Strut Lug Fitting Components Part No. Description LH Wing Qty RH Wing Qty C3W61-3 FRONT GUSSET PLATE 1 – C3W61-4 FRONT GUSSET PLATE – 1 C3W62-3 GUSSET PLATE - FRONT STRUT PICK-UP 1 - C3W62-4 GUSSET PLATE - REAR STRUT PICK-UP – 1 C3W63-5 LUG PLATE - FRONT STRUT PICK-UP 1 - C3W63-6 LUG PLATE - FRONT STRUT PICK-UP – 1 C3W64-5 LUG PLATE - REAR STRUT PICK-UP 1 – C3W64-6 LUG PLATE - REAR STRUT PICK-UP – 1 C3W66-3 BUSHING - STRUT FITTING 1 1 C3W8-4 PACKING PLATE 1 1 T able 3: Fasteners Original fastener Quantity per Aircraft Description Replacement Alternate AN3-14A** 2 3/16” Bolt – – AN320-12 2 Nut, 3/4" – – AN365-1032** 1 Nut, #10-32 MS21042-3 – AN365-428** 10 Nut, 1/4" MS21042-4 – AN365-524** 2 Nut, 5/16” MS21042-5 – AN381-4-28 A/R Pin, Cotter (Split) MS24665-376 – AN4-15A** 4 1/4" Bolt – – AN426AD6-(*) A/R Rivet, solid MS20426AD6-(*) – AN456AD4-(*) A/R Rivet, solid MS20470AD4-(*) – AN456AD5-(*) A/R Rivet, solid MS20470AD5-(*) – AN5-15A** 4 5/16” Bolt – – AN960-10** 4 Washer NAS1149F0363P – AN960A416L** 10 Washer NAS1149D0416J – AN960D1216L A/R Washer NAS1149D1216J - CR163-4-(*) A/R Rivet, blind CR763-4-(*) CR3243-4-(*) CR163-5-(*) A/R Rivet, blind CR763-5-(*) CR3243-5-(*) 3/16” DIA HUCK A/R 3/16” Lockbolt NAS1466 Lockbolt NAS1080-6 Collar HL20PB-6 Hi-Lok, Tension HL86-6 Collar, Tension 1/4” DIA HUCK A/R 1/4" Lockbolt NAS1468 Lockbolt NAS1080-8 Collar HL20PB-8 Hi-Lok, Tension HL86-8 Collar, Tension (*) Fastener grip lengths as required per installation.

(**) AN3/AN4 Bolts, AN960 washers & AN365 nuts are alternates to Huck/Lockbolt or Hi-Loks.

NOTE: The most common rivets used in the wing structure are listed in Table 3. All replacement rivets should conform to those originally installed.

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 9 of 18 B. Required Tooling

1. Standard Aircraft Mechanic hand tools

2. Standard inspection tools (flashlight, mirror, 10x magnification)

3. Wing Support Stand, PSM 1-3-3 Part-1 General-Information - Figure 1-3 C. Recommended Tooling It is recommended to use the tooling specified, however, tooling made in-situ may be used as long as they meet the original intent.

1. C3W1-1-211 Wing Support Stand

2. C3W7-1-38 LH / C3W7-2-38 RH - Wing Strut Lug Drill & Reaming Tool

SERVICE BULLETIN V3/0008 09-February-2017 S.B. V3/0008 Revision ‘NC’ Page 10 of 18 T

HIS PAGE INTENTIONALLY LEFT BLANK

Pages 13–20 of 20