Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '13035b83c8f513242e6d97f3bddec4f11e372d57adfc58b953289bfd18ced8b0' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '13035b83c8f513242e6d97f3bddec4f11e372d57adfc58b953289bfd18ced8b0' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
First Issue dated 15 October 2018 Page 1 of 6
Vulcanair S.p.A.
via G. Pascoli, 7 80026 Casoria (NA) - Italy Tel +39 081 5918111 Fax +39 081 5918172 info@vulcanair.com www.vulcanair.com AP68TP
VARIANTS
SERVICE INSTRUCTION No. 106
Design Organisation Approval No. AS-SI/18/007 dated 06 November 2018
SUBJECT: REINFORCEMENT INSTALLATION TO WING RIB #3
1. GENERAL
1.1 AIRCRAFT AFFECTED
• AP68TP-300 Spartacus ss/nn 8001, 8002, 8003, 8004, 8005, 8006, 8008, 8009, 8011.
• AP68TP-600 Viator ss/nn 9001, 9002, 9003, 9004, 9005, 9010.
1.2 PURPOSE The purpose of this document is to supp ly the instructions necessary to install the reinforcements of the Kit SI106 to LH/RH wing rib #3 to comply with mandatory Service Bulletin TP-43.
1.3 DESCRIPTION As a result of the inspection prescribed by SB TP-43, if the required correct ive action is the installation of the reinforcement to LH/RH wing rib #3, the installation of Kit SI106 must be carried out, in accordance with the repair scheme DWGR.0099 and the instructions reported in the para.2 hereunder.
If the required corrective action is the installation of the reinforcement only to LH wing rib #3, the installation of Kit SI106/LH must be carried out, in accordance with the repair scheme DWGR.0099 and the instructions reported in the para.2 hereunder.
If the required corrective action is the installation of the reinforcement only to RH wing rib #3, the installation of Kit SI106/RH must be carried out, in accordance with the repair scheme DWGR.0099 and the instructions reported in the para.2 hereunder.
No additional maintenance tasks are required when aircraft applies the above kits. The current scheduled maintenance program of the aircraft remains unchanged.
Vulcanair S.p.A. Service Instruction No.106
First Issue dated 15 October 2018 Page 2 of 6
1.4 MANHOURS REQUIRED The time necessary for the installation of the Kit SI106 is estimated as being 8 man-hours per each half-wing, including the time required to access the parts and to return the aircraft to an airworthy condition.
If the required corrective action to comply with Service Bulletin TP -43 is the installation of the reinforcements also to LH/RH wing rib #4 (ref. Ser vice Instruction 107) , the total time necessary for the ac tivity (installation of Kit SI106 plus Kit SI107) is estimated as being 12 man-hours per each half-wing.
1.5 SPECIAL TOOLS No special tool is required.
1.6 VARIATION IN WEIGHT AND BALANCE Negligible.
1.7 ELECTRICAL SYSTEM LOAD Not applicable.
1.8 REFERENCE DOCUMENTS
• Service Bulletin TP-43
• Applicable Aircraft Maintenance Manual
• Applicable Illustrated Parts Catalogue
• DWGR.0099 “LH/RH rib #3 reinforcement installation”
1.9 PUBLICATIONS AFFECTED Applicable Illustrated Parts Catalogue.
1.10 MODIFICATION TO BE CARRIED OUT BY Vulcanair Part 145 or other Approved Maintenance Organisation.
Vulcanair S.p.A. Service Instruction No.106
First Issue dated 15 October 2018 Page 3 of 6
2. WORK PROCEDURE
WARNING This instruction calls for the use of substances and/or procedures that may be injurious to health if adequate precautions are not taken.
This instruction refers only to technical suitability and in no way absolves the Operator from statutory and other legal obligation relating to health and safety at any stage of manufacture or use.
WARNING Carry out this work procedure in a FOD control area.
• Practice “Clean as you go”.
• Monitor all your personal items. Personal items should be accounted for upon exit of FOD area.
• Keep and account for all your tools, hardware, equipment.
• Dispose of trash properly.
• No food or beverage allowed.
Before finishing this work procedure , check that all the areas affected are FOD free.
WARNING Read the entire procedure and the latest applicable revision of reference documents to make sure you have a complete understanding of the requirements.
WARNING Take care to not damage the near structures and systems when performing the following procedure.
NOTE The discarded materials and fluids used during the maintenance activities should be disposed of in accordance with applicable regulations.
NOTE When complying with the work procedure, all the components and/or attaching items removed from the aircraft and requiring reinstallation, must be properly labelled and stored in a reserved area ;
replace them, if not efficient.
Vulcanair S.p.A. Service Instruction No.106
First Issue dated 15 October 2018 Page 4 of 6
1. Place the aircraft in a suitable working area for the kind of operation to carry out.
2. Switch OFF all the electrical loads, ground the aircraft and disconnect the battery cables (negative terminal first) and external power supply (if connected).
3. Position a trestle with height adjustable cradles under each LH and RH wing.
NOTE The following instructions are applicable to both LH and RH wing s. If the installation of only Kit SI106/LH or SI106/RH is required, follow the instructions concordantly.
4. Remove the wing-fuselage fairings.
5. Remove the engine cowlings.
6. Remove the LH/RH wing inboard leading edges in accordance with the concerning procedure reported into the applicable AMM.
7. Remove or release, as applicable, the existing systems’ items to gain access to the working area.
NOTE For all the following operations, deburr all the holes and clean all the reworked surfaces with Methyl - Ethyl-Ketone (or equivalent cleaning solvent) , and touch-up with Alodine 1200 (MIL-C-5541), then with Epoxy Primer (MIL-PRF-23377).
8. Remove the rivets attaching the upper flange of the wing rib #3 to the top wing panel.
9. Referring to DWGR.0099, put in place the reinforcement p/n R.0099 -1/-2 and using it as a drilling mask, mark the pilot holes location from the reinforcement to the web of LH/RH wing rib #3.
Using the upper flange of the wing rib #3 as a drilling mask, mark the holes location to the upper flange of the reinforcement.
10. On workbench, drill the upper flange of the reinforcement with pilot holes to Ø2.5mm diameter.
11. Drill pilot holes to Ø2.5mm diameter the web of the LH/RH wing rib #3.
12. Put in place the reinforcement and , referring to DWGR.0 099, ream the attaching holes and install the reinforcement p/n R.0099 -1/-2 by using rivets p/n 4801 -0407 and p /n MS20470AD4 -4, as applicable. Wet the shank of the wing panel attaching rivets with Epoxy Primer (MIL-PRF-23377), then carry out the installation.
13. Clean all the concerned areas from any working residual.
14. Reinstall or restore, as applicable , the systems’ items removed or released to gain access to the working area.
15. Reinstall the LH/RH wing inboard leading edges in accordance with the concerning procedure reported into the applicable AMM. Interpose a film, fill the gap and seal with single -component polyurethane sealant Sikaflex -221 manufactured by Saratoga, or other equivalent product. Allow the sealant to polymerize in accordance with the time prescribed by the manufacturer ( refer to the manufacturer Technical Data Sheet and Material Safety Data Sheet for operating instructions and safety precautions).
Vulcanair S.p.A. Service Instruction No.106
First Issue dated 15 October 2018 Page 5 of 6
16. Reinstall the wing -fuselage fairings. Interpose a film, fill the gap and seal with single -component polyurethane sealant Sikaflex -221 manufactured by Saratoga, or other equivalent product. Allow the sealant to polymerize in accordance with the time prescribed by the manufacturer (refer to the manufacturer Technical Data Sheet and Material Safety Data Sheet for operating instructions and safety precautions).
17. Reinstall the engine cowlings.
18. If removed, install the access panels as previously.
19. Carry out a functional c heck of all the systems disassembled/removed to carry out this work procedure.
20. Where necessary, touch up the surfaces with finish polyurethane paint as per existing livery of the aircraft.
21. Connect battery cables (positive terminal first).
22. Unground the aircraft.
23. Record compliance with this Service Instruction (to LH wing, or RH wing, or both) in the Aircraft Log-Book.
Vulcanair S.p.A. Service Instruction No.106
First Issue dated 15 October 2018 Page 6 of 6
3. MATERIALS REQUIRED FOR THE MODIFICATION
Kit SI106 (Applicable to both LH and RH wings) ITEM P/N DESCRIPTION Q.TY 1 R.0099-1 LH REINFORCEMENT 1 2 R.0099-2 RH REINFORCEMENT 1 3 MS20470AD4 RIVET 38 4 4801-0407 RIVET 6 5 DWGR.0099 LH/RH RIB #3 REINFORCEMENT INSTALLATION 1
Kit SI106/LH (Applicable only to LH wing) ITEM P/N DESCRIPTION Q.TY 1 R.0099-1 LH REINFORCEMENT 1 2 MS20470AD4 RIVET 19 3 4801-0407 RIVET 3 4 DWGR.0099 LH/RH RIB #3 REINFORCEMENT INSTALLATION 1
Kit SI106/RH (Applicable only to RH wing) ITEM P/N DESCRIPTION Q.TY 1 R.0099-2 RH REINFORCEMENT 1 2 MS20470AD4 RIVET 19 3 4801-0407 RIVET 3 4 DWGR.0099 LH/RH RIB #3 REINFORCEMENT INSTALLATION 1
Commercially available materials required but not included in the Kit:
− Polyurethane paint − Sikaflex-221 sealant, or equivalent product − Methyl-Ethyl-Ketone, or equivalent cleaning solvent − Alodine 1200 (MIL-C-5541) − Epoxy Primer (MIL-PRF-23377)