What it approves
Installation of winglets and related system changes
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
SA01615SE BLR Aerospace, LLC 11002 29th Ave. West Everett, WA 98204 Part 23 Code of Federal Regulations * * *See attached Federal Aviation Administration (FAA) Approved Model List (AML) SA01615SE for approved aircraft models.
Installation of winglets and related system changes
1. Installed in accordance with the applicable master drawing list (MDL) as listed on AML SA01615SE.
2. Maintained in accordance with the applicable instructions for continued airworthiness (ICA) as listed on AML SA01615SE.
(Description of Type Design continued on Page 3)
1. Approval of this change in type design applies to the aircraft listed on AML SA01615SE only.
(Limitations continued on Page 3) June 6, 2003 11/23/2009; 8/23/2018; 05/24/2024 November 2, 2005 10/13/2006; 4/2/2007; 7/29/2008; 3/25/2016;
2/27/2023; 1/31/2024 William Eckler ODA administrator ODA-833355-CE 5
SA01615SE 5
Latest Amended Date:
SA01615SE Description of Type Design Change (continued):
3. Operated in accordance with the applicable airplane flight manual supplement (AFMS) as listed on AML SA01615SE.
4. Refer to 3S22-019-2001 Rev IR or later FAA approved revision for Compliance Data List for Model A200 (C-12C).
2. This approval should not be extended to other aircraft of this model on which other previously approved modifications are incorporated unless it is determined by the installer that the relationship between this change and other previously approved modifications will introduce no adverse effect upon the airworthiness of that aircraft. A copy of this certificate, AML SA01615SE, and the applicable MDL, ICA, and AFMS as listed on AML SA01615SE must be maintained as part of the permanent records for the modified aircraft.
3. If the holder agrees to permit another person to use this certificate to alter the product, the holder shall give the other person written evidence of that permission.
4. For aircraft without Gurney Flap installed:
Structural life limits and other requirements for the wing structure are changed by the installation of this certificate. Specifically, the structural life limits for the wing structure, the accomplished times specified for initial and recurring wing structural inspections, and the compliance times for Airworthiness Directives affecting the aircraft listed on AML SA01615SE wing structure only, as expressed in flight hours, may be reduced by up to 35% by the installation of this certificate. The means and requirement to establish the life limits and required compliance times are provided in the applicable ICA documents as listed on AML SA01615SE.
5. Model A200 (C-12C) requires PT6A-42 engines and Gurney Flaps to be installed.
3 5 January 31, 2024
Latest Amended Date:
SA01615SE Certification Basis:
Airworthiness and Environmental Standards for components and areas not affected by the change are the original certification basis for Models 200, 200C, A200, B200, B200C, B200GT, B200CGT, 300, and 300LW as shown on Type Certificate Data Sheet (TCDS) A24CE, revision at the time of issuance.
The following regulations apply as noted for the parts changed or affected, all other regulations per TCDS A24CE:
(14CFR Part 23, Amendment as shown) ------------------------------------------Applicable to All Models------------------------------------------
(See Continuation Sheet) 4 5 23-45
23.613
23-48
23.391
23.393
23.572
23.573(b)
23.607
23.611
23.629
23-49
23.867
23.1309
23.1361
23.1401
23-50
23.155
23.205
23.1581
23.1589
25-23
25.1419 23-20
23.1301
23-21
23.1501
23-23
23.603
23.605
23-26
23.1529
23-34
23.1
23-37 G23
23-43
23.1385(c)
23.1387
23.1389
23.1391
23.1393
23.1395
23.619
23.623
23.625
23.683
23.1351(a)(1)(2)
23.1585
23.1587
23-10
23.1583
23-11
23.1397
23-14
23.143
23.145(d)
23.153(a)(b)(c)
23.161(c)(3)
23.173(a)
23.175
23.1419 see 25.1419
23.975(a)
23.1329
23.1357
23.1365(a)
23.1385(a)(b)(d)(e)
23.1511
23.1513
23.1519
23.1543(a)(b)
23-7
23.49
23.51(a)
23.65(a)
23.67(a)
23.75(a)
23.77(a)
23.141
23.145(a)(b)(c)(e)
23.149(a)(b)
23.161
23.201
23.207
23.253
23.395 23-0
23.21
23.45
23.147
23.171
23.173(b)(c)
23.177(a)
23.179
23.181
23.203
23.231(a)
23.233
23.251
23.303
23.307
23.321
23.601
23.609
23.627
23.641
23.651
23.657
23.659
23.671
23.681
23.685 January 31, 2024
Latest Amended Date:
SA01615SE Certification Basis (continued):
-----Applicable to Models 200, 200C, A200, B200, B200C, B200GT, B200CGT Only-----
------------------------------Applicable to Models 300 and 300LW Only-----------------------------
-------------------------------------Applicable to Model A200 Only--------------------------------------
The certification basis for Installation of the LED tail position and anti-collision lighting system is based upon the original BLR Winglet STC.
-------------------------------------------------------END------------------------------------------------------ 5 5 23-0
23.301
23.305
23.321
23.331
23-34
23.333
23-42
23.331
23-0
23.29
23.993
23-7
23.954
23.1301
23.347
23.351
23.427
23.351
23.421
23.423
23.425
23.427
23.445(a)(c)
23-14
23.1397
23-23
23.1416
23-4
23.3(a)(b)(d)
23-45
23.305
23.321
23-45
23.621
23-48
23.575 23-7
23.333
23.335
23.337
23.341
23-48
23.301
23.335
23.337
23.341
23.343
23-50
23.45
23.49
23.51
23.65(b)
23.67(b)
23.345
23.349
23.421
23.423
23.425
23.455
23.345(a)(b)(c)
23.347
23.349
23.441(a)(c)
23.443(a)(c)
23.455
23.77(b)(c)
23.201(e)(4)
23.1583
23.1585
23.1587
January 31, 2024
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 9
| Make | Model | Data sheet |
|---|---|---|
| Textron Aviation Inc. | 200 | A24CE |
| Textron Aviation Inc. | 200C | A24CE |
| Textron Aviation Inc. | 300 | A24CE |
| Textron Aviation Inc. | 300LW | A24CE |
| Textron Aviation Inc. | A200 (C-12C) | A24CE |
| Textron Aviation Inc. | B200 | A24CE |
| Textron Aviation Inc. | B200C | A24CE |
| Textron Aviation Inc. | B200CGT | A24CE |
| Textron Aviation Inc. | B200GT | A24CE |
Every issue · 11
DRS keeps each issue of an STC as its own record, with its own certificate and attachments.
| Date | Status | Files |
|---|---|---|
| May 24, 2024 | Reissued, current | CertificateApproved model list |
| October 10, 2023 | Amended, earlier issue | CertificateApproved model list |
| February 27, 2023 | Amended, earlier issue | CertificateApproved model list |
| April 22, 2021 | Amended, earlier issue | CertificateAML_SA01615SE |
| October 2, 2020 | Amended, earlier issue | CertificateApproved model list |
| August 23, 2018 | Reissued, earlier issue | CertificateApproved model list |
| March 25, 2016 | Amended, earlier issue | CertificateApproved model list |
| November 23, 2009 | Reissued, earlier issue | Certificate |
| July 29, 2008 | Amended, earlier issue | Certificate |
| April 2, 2007 | Amended, earlier issue | Certificate |
| October 13, 2006 | Amended, earlier issue | Certificate |