What it approves
Installation of Luma Technologies LT-4048 Series LED Display Panel
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
SA04627CH Luma Technologies LLC 13226 SE 30th St., B3 Bellevue, WA 98005 Part 23 the Code of Federal Regulations See AML See AML See AML Installation of Luma Technologies LT-4048 Series LED Display Panel in accordance with Dan Buzz & Associates LLC, Master Data List Document No. MDL-4048-001 Revision B, dated September 11, 2023, or later FAA approved revision.
The aircraft must be maintained in accordance with the FAA-accepted Instructions for Continued Airworthiness (ICA-4048-001, Revision IR, dated April 17, 2023, or later FAA approved revision).
1) The installer must determine whether this design change is compatible with previously approved modifications.
(See Continuation sheet 3 of 3 for complete list of Limitations and Conditions) November 1, 2022 June 6, 2024 September 25, 2023 Paul (Vu) Nguyen Manager, Central Certification Branch Compliance & Airworthiness Division Aircraft Certification Service 3 FOR
SA04627CH 3
SA04627CH Date of Issuance: September 25, 2023 Date Reissued: June 6, 2024
2) If the holder agrees to permit another person to use this certificate to alter the product, the holder must give the other person written evidence of that permission.
Certification Basis:
Based on 14 CFR §§21.115 and 21.101, and the FAA policy for significant changes in FAA Order 8110.48, the certification basis for the Ontic Engineering and Manufacturing SA226/SA227 series aircraft is as follows:
a. The type certification basis for the Ontic Engineering and Manufacturing SA226/SA227 series aircraft are shown on TCDS A5SW and A8SW for parts not changed or not affected by this change.
b. The certification basis for the parts changed or affected by this change since the reference date of application, November 1, 2022, is based on TCDS A5SW/A8SW and §§ 14 CFR Part 23.
Based on 14 CFR §§ 21 115 and 21.101, and the FAA policy for significant changes in FAA Order 8110.48, the certification basis for the baseline modification was determined to be TCDS A5SW/A8SW and the following:
14 CFR Part 23 Regulations at the amendment level:
14 CFR §§ 23.561(e) [23-7], 23.771(a) [23-7], 23.773(a)(1) [23-14], 23.1301(a) [23-7],
23.1309(a)(1)(b)[23-14], 23.1322 [23-17], 23.1351 (a)(1)(2) [23-20], 23.1381(b) [23-00], 23.1431 (a)(b) [23-43] , 23.1529 [23-26].
---------------------------------------------------- END -------------------------------------------------------
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 9
| Make | Model | Data sheet |
|---|---|---|
| Ontic Engineering and Manufacturing Inc. | SA226-AT | A5SW |
| Ontic Engineering and Manufacturing Inc. | SA226-T | A5SW |
| Ontic Engineering and Manufacturing Inc. | SA226-TC | A8SW |
| Ontic Engineering and Manufacturing Inc. | SA227-AC (C-26A) | A8SW |
| Ontic Engineering and Manufacturing Inc. | SA227-AT | A5SW |
| Ontic Engineering and Manufacturing Inc. | SA227-BC (C-26A) | A8SW |
| Ontic Engineering and Manufacturing Inc. | SA227-DC (C-26B) | A18SW |
| Ontic Engineering and Manufacturing Inc. | SA227-PC | A8SW |
| Ontic Engineering and Manufacturing Inc. | SA227-TT | A5SW |
Every issue · 3
DRS keeps each issue of an STC as its own record, with its own certificate and attachments.
| Date | Status | Files |
|---|---|---|
| June 6, 2024 | Reissued, current | CertificateApproved model list |
| April 3, 2024 | Amended, earlier issue | CertificateApproved model list |
| September 25, 2023 | Issued, earlier issue | CertificateApproved model list |