What it approves
Installation of R134 vapor cycle air conditioning system.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
Part 3 of the Civil Air Regulations.
Installation of R134 vapor cycle air conditioner system on Cessna airplane model R182 or TR182 in accordance with Fort Worth Airworks, Inc. Master Drawing number FW15000R182MDL, Revision B, dated October 22, 2002 or later FAA approved revision. Airplane Flight Manual Supplement AFMS15001, dated 6 November 2002 or later FAA approved revision is required. Document number FW9800C206MM, Rev. B, dated November 1, 2002, titled General Operating, Servicing, and Maintenance manual for Zephyr Airborne R-134a Air Conditioning Systems, or later FAA approved revision is required.
The Aircraft must be equipped with a 95-amp alternator. The installer must determine whether this design change is compatible with previously approved modifications. If the holder agrees to permit another person to use this certificate to alter a product, the holder must give the other person written evidence of that permission.
Rocky Top Leasing, Inc.
1027 River Bend Drive Chattanooga, TN 37419 3A13 Make : Cessna Model : R182, TR182 Date of application : November 19, 2001
Date of issuance : November 06, 2002
Date reissued : January 16, 2007;
May 30, 2012
( Signature) S. Frances Cox, Manager Special Certification Office, Southwest Region
( Title)
FAA Form 8110-2-1(10-69) Page 2 of 2
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 2
Every issue · 2
DRS keeps each issue of an STC as its own record, with its own certificate and attachments.
| Date | Status | Files |
|---|---|---|
| May 30, 2012 | Reissued, current | Certificate |
| January 16, 2007 | Reissued, earlier issue | Certificate |