What it approves
Wiring installation to interconnect the Litton LTN-51 Inertial Navigation System to the Sperry SP-50 Autopilot
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
FAA Form 8110-2 (8/13) Page 1
Part of the Federal A viation Regulations.
Original Product – Type Certificate Number: MDNH:
MRGHO:
Signature
Title
SA1061SW Associated Air Center, Inc. - c/o CT Corporation System 1999 Bryan Street, Suite 900 Dallas, TX 75201 4b A12EA Grumman G-1159 Wiring installation to interconnect the Litton LTN-51 Inertial Navigation System to the Sperry SP-50 Autopilot in accordance with Drawing 19803-1159, page 79, Rev. A dated 5/29/1969; Drawing 19803-1159, page 31, Rev. A dated 3/29/1969; and Drawing 19195-1159 dated 4/29/1969.
1. The Basic Inertial Navigation System must be installed in accordance with STC SA945SW.
2. FAA Approved Airplane Flight Manual Supplement dated July 29, 1969 is required.
Certification Basis of this STC refers to Part 4b of the Civil Air Regulations (CAR 4b).
6/27/1969 7/29/1969 7/29/1969 1/18/2018 Jose Mora-Vargas ODA Administrator ODA-710437-SW
FAA Form 8110-2 (8/13) Page 2
To (Name and address of transferee) From (Name and address of grantor) Extent of Authority (if licensing agreement):
SA1061SW
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 1
| Make | Model | Data sheet |
|---|---|---|
| Gulfstream Aerospace Corporation | G-1159 | A12EA |