What it approves
Install cargo conveyer system.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
Part 25 of the Federal Aviation Regulations. (See Type Certificate Data Sheet Number A20WE for the complete certification basis).
Install cargo conveyer system according to one of the following installation instructions:
a. BPS 557, Revision C, dated June 28, 1990, or
b. BPS 564, Revision E, dated August 17, 1991, or
c. BPS 566, Revision A, dated June 28, 1990, or later FAA approved revisions.
1) The provisions of the FAA approved Boeing weight and balance manual and the FAA approved Boeing flight manual, affected the installation, must be followed.
2) The installer must determine whether this design change is compatible with previously approved modifications.
3) If the holder agrees to permit another person to use this certificate to alter the product, the holder must give the other person written evidence of that permission.
(Continued on page 3 of 3)
Telair US LLC 500 Gateway Drive Goldsboro, NC 27534 A20WE Make : Boeing Model : 747-100; 747-200C, 747-200F, 747-300, 747-400; Series Date of application : February 9, 1988
Date of issuance : June 13, 1988
Date reissued : March 26, 2015
Date amended : September 1, 1988; November 9, 1989;
July 18, 1990; October 16, 1991
(Signature) Karol Mordasiewicz Manager, Airframe & Administrative Branch Chicago Aircraft Certification Office
(Title)
Original Signed By:
Karol Mordasiewicz
FAA FORM 8110-2-1(10-69) PAGE 2 of 3 PAGES
Number
FAA FORM 8110-2-1(10-69) PAGE 3 of 3 PAGES
Number SA1307GL
Date of Issuance: June 13, 1988 Date Amended: September 1, 1988; November 9, 1989;
July 18, 1990; October 16, 1991
LIMITATIONS AND CONDITIONS: -Continued-
4) An FAA Approved cargo compartment and a cargo loading door, compatible with this installation, must be installed.
-END-
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.