What it approves
Revised battery installation.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
States Department of 'tftranspm-tattim - ^eJreral .Afciattmt ^Aimttmsiratum upplemmtal Certificate SA1317SW signature Flight Support Corporation, a Delaware Corporation 7511 Lernmon Avenue, Hangar C Dallas, TX 75209 10S3 Civil Air A2PC Mitsubishi MU-2B-20 Revised battery installation according to Drawing List dated 5/24/71, or later FAA approved revision.
Compatibility of this modification with other previously approved modifications must be determined by the installer.
trst& Mf 25, 1971 27, 1971 ; 12/21/98; 8/31/00
f. 2/23/72; 5/26/78; 3/10/81;
2/12/82 Rev. 4 (Signaturfy
5. Frances Cox Manager, Special Certification Office, Southwest Region .IX.M (.title) Any dJteratlcn of this certificate Ij pu/i ty d fin* of not exceeding SI-000, of laprlsoflofnt not exceeding 3 ysarj, of both.
Fom 8110-2(10-66) Page 1 of TftJs 06rti«CJ£e «y bs tram/erred in flccordance ultn FAJ! 21.47.
TRANSFER ENDORSEMENT Transfer the ownership of Supple mental Type Certificate Number to (Name of transferee) (Address of transferee) umbci ortd Itwt)
y. Stele, a.
from (Name of grantor) (Print or type) (Address of grantor) (Number and ttittt;
Signature of grantor (In ink):
c FAA AC sa-ssae
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 1
| Make | Model | Data sheet |
|---|---|---|
| Mitsubishi Heavy Industries Ltd. | MU-2B-20 | A2PC |