What it approves
Installation of Litton LTN-72RL INS/ANS navigation system.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
ea <©f America department of transportation - Jlfeoeral Afetatton Aomtntstratton Ol^rttftcate SA4265SW Gulfstream Aerospace Corporation 7440 Aviation Place Dallas, TX 75235 a*>a>^^ Civil Air A6WE McDonnell Douglas DC-9 Installation of Litton LTN-72RL INS/ANS Navigation System in accordance with K-C Aviation Drawing List T123-001 dated 1/12/81, or later FAA approved revision.
FAA Approved Airplane Flight Manual Supplement dated February 4, 1981, is required.
Compatibility of this modification with other previously approved modifications must be determined by the installer.
efa/e .• July 02, 1980 February 05, 1981 . April 1, 1999 (Signature) \ SV—^r^nbe^ Cox, Manager Special Certification Office, Southwest Region (Title)—————————— Any alteration of tnis certificate is punishable by a fine of not exceeding $1,000, or imprisonment not exceeding 3 years, or botn.
TRANSFER ENDORSEMENT Transfer the ownership of Supplemental Type Certificate Number to (Name of transferee) (Address of transferee) ( Number and street) (City, State, and <7/> code) from (Name of grantor) (Print or type) (Address of grantor) (Number and street) (City, State, and <7P code) Extent of Authority (if licensing agreement):
Signature of grantor (In ink):
ADs that name this STC · 0
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 22
| Make | Model | Data sheet |
|---|---|---|
| The Boeing Company | DC-9-11 | A6WE |
| The Boeing Company | DC-9-12 | A6WE |
| The Boeing Company | DC-9-13 | A6WE |