What it approves
Installation of a three-section tank and auxiliary fuel transfer system in the lower forward cargo bay.
What the certificate says
From the PDF’s text layer, without the form’s printed wording. Layout and order may differ; the PDF is the record.
Part 4b of the Civil Air Regulations.
Installation of a three-section tank and auxiliary fuel transfer system in the lower forward cargo bay in accordance with the data listed in PATS, Inc. Installation Master Drawing List Drawing No. 200-1-040, Revision B dated June 13, 1986.
1. Patrick Aircraft Tank Systems, Inc. Flight Manual Supplement No. 8, FAA approved June 23, 1986, is required with this installation.
2. PATS, Inc. Report No. TO-70, Maintenance Manual, dated June 19, 1986, applies to this installation.
3. If the holder agrees to permit another person to use this certificate to alter a product, the holder must give the other person written evidence of that permission.
4. The installer must determine whether this design change is compatible with previously approved modifications.
The Leading Edge Group, LLC 5400 Carillon Point Kirkland, WA 98033 A3WE Make: British Aerospace Model: 727-200 Series
Date of application: April 30, 1986
Date of issuance: June 23, 1986
Date reissued: May 14, 2004, April 2, 2009, April 27, 2009
( Signature) Anthony Socias Manager New York Aircraft Certification Office
( Title)
FAA Form 8110-2-1(10-69) Page 2 of 2
ADs that name this STC · 1
An AD can apply because an STC is installed, or mention one in its text.
Approved models · 1
| Make | Model | Data sheet |
|---|---|---|
| The Boeing Company | 727-200 Series | A3WE |